QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDING 30 SEPTEMBER 2026
• Norfolk acquisition of the Ciclón Copper Project extended via SPA Extension agreement with Pampa
Camarones SpA.
• Ciclón is situated within the prolific Domeyko Cordillera hosting the giant copper deposits including
Collahuasi, Chuquicamata, La Escondida and others. Ciclón is located in proximity to the
substantial El Salvador copper mine (CODELCO) and Franke copper mine (Minera Las Cenizas).
• Mineral Resource Estimate (JORC 2012) of 11.8Mt at 2.88% CuEq for the Ciclón Copper Project.1
• Ciclón offers outstanding exploration upside potential being central to an extensive district scale
mineralised epithermal and related mineralised porphyry system.
• Ciclón received an Environmental Qualification Resolution in December 2025, approving
underground mining operations, processing plant and supporting infrastructure.
• Transaction is conditional on (amongst other things) Norfolk raising a minimum of AUD $75 million
under a public offer through the issue of ordinary fully paid shares (before costs) pursuant to a
Prospectus to fund acquisition and exploration.
• Transaction close and reinstatement subject to the Company satisfying ASX conditions of
reinstatement.
• During and subsequent to the Quarter, the following changes to the Board occurred:
- Mr Anthony McClure was appointed as Executive Chair;
- Mr Richard Pugh was appointed as Non-Executive Director; and
- Mr Ben Phillips resigned as Executive Chair and Mr Patrick Hollywell resigned as Director of the
Company.
Introduction
Norfolk Metals Limited (ASX:NFL) (Norfolk or the Company) is pleased to report on its activities during the quarter
ended 30 September 2026 (Quarter).
Ciclón Copper Project Transaction Update
During the Quarter, the Company’s main focus has been to progress its proposed re-compliance transaction
announcement on 11 June 2026, including the progression of items relating to the Share Purchase Agreement
(SPA) for the acquisition of 100% of Eco Earth Elements SpA (EEE) and Don Gabriel SpA (DG), which together own
or have an option to acquire 100% of the Ciclón Copper Project in Chile (Project).
The total consideration under the SPA is USD $50 million, consisting of USD $45 million in cash (Cash
Consideration) and USD $5 million in Norfolk Metals shares, subject to various conditions precedent.
On 27 July 2026, in accordance with the SPA, Norfolk paid an extension fee of USD $250,000 to extend the date
that the conditions precedent must be satisfied or waived by 2 months (End Date). The Company subsequently
paid a further extension fee of USD $150,000 on 11 September 2026 and has agreed with Pampa Camarones to
vary the SPA, including:
1
Refer to Table 1 to Table 3 at the end of this release for further details regarding the Ciclón Resource. Refer to Table Notes for full details
regarding Resource CuEq calculations.
2
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN 38 652 438 385
ASX ANNOUNCEMENT
Phone: +61 8 6255 8625
norfolkmetals.com.au
• extending the End Date to 31 December 2026; and
• reducing the condition precedent to obtain minimum binding investment commitments for the re-
compliance capital raising (Capital Raising) to AUD $75 million (previously AUD $100 million).
All extension fees paid to date are non-refundable and, if completion occurs, will be credited against the Cash
Consideration.
Completion of the transaction is expected to occur following the Capital Raising and re-listing process on the
Australian Securities Exchange (ASX), which is intended to fund the resource expansion and future development
of the Project among other things.
The Company intends to lodge a prospectus in the coming weeks in connection with the proposed Capital Raising
and re-compliance with Chapters 1 and 2 of the ASX Listing Rules. An updated indicative timetable will be included
in the prospectus.
As detailed in the Company’s announcement dated 11 June 2026, EEE and DG held certain options under Ciclón
Option Agreement #1 and #2 (as defined in that announcement) to acquire mining concessions from Compañía
Minera Fénix. Norfolk procured the payment of USD $1,286,439 and these options were exercised by EEE and DG
on or about 11 September 2026 and the relevant concessions are to be transferred to EEE and DG, which Norfolk
will acquire on completion of the SPA.
Roger River EL20/2020 Expiration
During the Quarter the Company advised that exploration licence EL20/2020 at the Roger River Project, Tasmania
had expired.
Board Changes
During the Quarter and subsequent to the Quarter, the Company announced the following changes to its Board of
Directors:
• Mr Anthony McClure was appointed as Executive Chair;
• Mr Richard Pughwas appointed as a Non-Executive Director;
• Mr Ben Phillips resigned as Executive Chairman and as a Director of the Company; and
• Mr Patrick Hollywell resigned as a Director of the Company.
Following these changes, the Board comprises Mr McClure (Executive Chair), Mr Pugh and Mr Leonardo Pilapil (as
Non-Executive Directors). Mr McClure and Mr Pugh will stand for election at the Company’s annual general
meeting, to be held in November 2026.
Mr Anthony McClure
Mr McClure is a respected mining executive with over 35 years of technical, management and financial experience
in the resources sector worldwide. He is a Non-Executive Director of Strickland Metals Limited (ASX:STK) and
Gateway Mining Limited (ASX:GML), and is a past director of Silver Mines Limited, Bolnisi Gold NL, Nickel Mines
Limited, Santana Minerals Limited and European Gas Limited. Mr McClure holds a Bachelor of Science (Geology)
from Macquarie University.
Mr Richard Pugh
Mr Pugh is a geologist with over 18 years of industry experience. He is the Chief Executive Officer of Gateway Mining
Limited (ASX:GML). Mr Pugh is a past Executive Technical Director and also served as a Non-Executive Director of
Strickland Metals Limited (ASX:STK). He has previously been a Senior Consulting Geologist and Exploration
Manager for several ASX-listed mineral exploration companies, including Auris Minerals Ltd. Mr Pugh holds a
Bachelor’s degree in Exploration and Resource Geology from Cardiff University and is a member of the Australian
Institute of Geoscientists.
Joint Company Secretary
The Company also advises that Mr Sleiman Majdoub has been appointed as Joint Company Secretary, effective
today’s date, joining existing Company Secretary, Mr Arron Canicais.
3
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN 38 652 438 385
ASX ANNOUNCEMENT
Phone: +61 8 6255 8625
norfolkmetals.com.au
Mr Majdoub is a qualified solicitor with experience in the corporate and commercial sector including experience
advising mining exploration companies. Mr Majdoub graduated with a Bachelor of Laws and a Bachelor of
Commerce (Hons) from Macquarie University. He has significant experience in advising and assisting ASX listed
companies with their reporting, company secretarial and compliance requirements along with in-house legal
support.
Financials
The cash flows relating to the September 2026 Quarter included a total of $601,000 in exploration and evaluation
spend on the Ciclón, Carmen Copper, Roger River and Orroroo projects and $164,000 in staff, corporate and
admin costs, costs in relation to the Ciclón transaction and managing the corporate requirements of the Company.
No expenditure was incurred on mining production or development activities during the Quarter.
The Company had a closing cash balance of $0.155 million.
Payments of approximately $61,000 were made to related parties of the Company, as shown in the attached
Appendix 5B. These payments relate to current fees and consulting fees paid to directors.
Subsequent to the Quarter, the Company entered into a loan agreement with Anthina Nominees Pty Ltd (Anthina),
an entity controlled by Mr Anthony McClure (Anthina Loan Agreement), under which Anthina has provided the
Company with an unsecured loan facility to assist with operational costs and working capital. The current amount
drawn under the Anthina Loan Agreement is A$1,905,903.
Interest accrues on the outstanding balance at 8% per annum and is capitalised monthly. The loan and accrued
interest is repayable in cash on the earlier of completion of the Capital Raising or 15 October 2027.
The Anthina Loan Agreement otherwise contains representations, undertakings and events of default (non-
payment, breach and insolvency) that are standard for an agreement of this nature.
Tenement Information (as required by Listing Rule 5.3.3)
Tenement
ID
Holder/Applicant Interest at start of Quarter Interest at end of Quarter
EL20/2020 Roger River Resources Pty
Ltd
100% 0%
EL6552 Black Lake Pty Ltd 100% 100%
EL6814 Black Lake Pty Ltd 100% 100%
EL6948 Black Lake Pty Ltd 100% 100%
END
This announcement has been authorised for release by the Board of Norfolk Metals Ltd
4
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN 38 652 438 385
ASX ANNOUNCEMENT
Phone: +61 8 6255 8625
norfolkmetals.com.au
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2
. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, high-
margin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2
, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
For further information, please visit www.norfolkmetals.com.au
Disclaimers
This announcement has been prepared by Norfolk Metals Limited (ACN 652 438 385). The information contained
in this release is for information purposes only. This release may not be reproduced, disseminated, quoted or
referred to, in whole or in part, without the express consent of the Company. The information contained in this
release is not investment or financial product advice and is not intended to be used as the basis for making an
investment decision. Please note that, in providing this release, the Company has not considered the objectives,
financial position or needs of any particular recipient. The information contained in this release is not a substitute
for detailed investigation or analysis of any particular issue and does not purport to be all of the information that a
person would need to make an assessment of the Company or its assets. Current and potential investors should
seek independent advice before making any investment decisions in regard to the Company or its activities.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release.
This release does not constitute an invitation, offer or recommendation to apply for or purchase securities and
does not contain any application form for securities. This release does not constitute an advertisement for an
offer or proposed offer of securities. Neither this release nor anything contained in it shall form the basis of any
contract or commitment and it is not intended to induce or solicit any person to engage in, or refrain from engaging
in, any transaction.
Competent Person’s Statement
The information in this announcement that relates to Mineral Resources and Exploration Results has been
extracted from various Norfolk ASX announcements and are available to view on the Company’s website at
www.norfolkmetals.com.au or through the ASX website at www.asx.com.au (using ticker code “NFL”).
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the Mineral Resource Estimates in the relevant market announcement continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
5
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN 38 652 438 385
ASX ANNOUNCEMENT
Phone: +61 8 6255 8625
norfolkmetals.com.au
Ciclón Project Mineral Resource Estimate
Table 1 Global Mineral Resource Estimate Ciclón Copper Project 2026
Category
Tonnage
CuEq Cu Zn Pb Ag Au ZnEq AgEq
Mt % % % % ppm ppm % ppm
Indicated 8.0 2.93 0.99 2.28 0.77 57 0.24 10.76 159
Inferred 3.8 2.80 0.82 2.04 0.89 61 0.18 10.09 150
Total 11.8 2.88 0.93 2.20 0.81 58 0.22 10.54 156
Table Notes:
Rounding errors are apparent in the summation of total resources.
Zone Classification
Tonnage Cu Zn Pb Ag Au CuEq ZnEq AgEq
Mt % % % ppm ppm % % ppm
Table 2 Ciclón Prospect Mineral Resource Estimate
Copper
Mixed
Indicated
1.6 1.17 0.65 0.58 91 0.40 4.04 11.54 170
Zinc
Sulphide
5.1 0.57 3.16 0.96 46 0.21 2.40 9.59 141
Copper
Mixed
Inferred
0.9 0.70 0.44 0.59 107 0.45 3.92 11.19 164
Zinc
Sulphide
1.4 0.11 4.11 1.63 40 0.08 2.09 8.37 123
Copper
Mixed
Total
2.5 1.01 0.57 0.58 97 0.42 4.00 11.41 168
Zinc
Sulphide
6.6 0.47 3.37 1.10 44 0.18 2.33 9.32 137
Table 3 Exploradora Prospect Mineral Resource Estimate
Copper
Sulphide
Indicated 1.3 2.39 0.86 0.27 57 0.16 3.61 14.32 217
Copper
Sulphide
Inferred 1.5 1.59 0.98 0.33 55 0.12 2.80 11.12 169
Copper
Sulphide
Total 2.8 1.97 0.92 0.31 56 0.14 3.18 12.65 192
Table Notes:
• Rounding errors are apparent in the summation of total resources.
• Ciclón Prospect Metal Equivalents
Metal equivalents have been reported in respect of mineral resources for the Ciclón Prospect based on the following parameters:
6
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN 38 652 438 385
ASX ANNOUNCEMENT
Phone: +61 8 6255 8625
norfolkmetals.com.au
Copper Mixed Formula:
CuEq(%) = Cu(%)+Zn(%)*0.35007+Pb(%)*0.19729+Ag(ppm)*0.02384+Au(ppm)*0.88391
ZnEq(%) = Cu(%)*2.857+Zn(%)+Pb(%)*0.564 +Ag(ppm)*0.068 +Au(ppm)*2.525
AgEq(ppm) = Cu(%)*41.943+Zn(%)*14.683+Pb(%)*8.275 +Ag(ppm) +Au(ppm) *37.074
Assumed commodity prices: Copper (Cu) US$12,000/t; Zinc (Zn) US$3,000/t; Lead (Pb) US$1,800/t, Silver (Ag) US$70/ozt; Gold
(Au) US$3,000/ozt.
Assumed Metallurgical Recoveries: Copper (Cu) 68.2%; Zinc (Zn) 95.5%; Lead (Pb) 89.7%; Silver (Ag) 86.7%; Gold (Au) 75%.
Cut-off grade Ciclón Copper Mixed Zone CuEq% = 1.6%
Zinc Sulphide Formula:
CuEq(%) = Cu(%)+ Zn (%) *0.24974+Pb(%)*0.14074 +Ag(ppm)*0.01701+Au(ppm) *0.63057
ZnEq(%) = Cu(%)*4.004 + Zn (%)+ Pb(%)*0.564 +Ag(ppm)*0.068 + Au(ppm) *2.525
AgEq(ppm) = Cu(%)*58.794 + Zn (%) *14.683+Pb(%)*8.275+Ag(ppm)+Au(ppm) *37.074
Assumed commodity prices: Copper (Cu) US$12,000/t; Zinc (Zn) US$3,000/t; Lead (Pb) US$1,800/t, Silver (Ag) US$70/ozt; Gold
(Au) US$3,000/ozt.
Assumed Metallurgical Recoveries: Copper (Cu) 95.6%; Zinc (Zn) 95.5%; Lead (Pb) 89.7%; Silver (Ag) 86.7%; Gold (Au) 75%.
Cut-off grade Ciclón Zinc Sulphide Zone ZnEq% = 4%
• Exploradora Prospect: Metal Equivalents:
Metal equivalents have been reported in respect of mineral resources for the Exploradora Prospect based on the following
parameters:
Cut-off grade Exploradora CuEq% = 0.8%
Formula:
CuEq(%) = Cu(%) + Zn (%) *0.25180 +Pb(%)*0.13489 +Ag(ppm)*0.01660 +Au(ppm) *0.61955
ZnEq(%) = Cu(%)*3.971 + Zn (%) +Pb(%)*0.536 +Ag(ppm)*0.066 +Au(ppm) *2.461
AgEq(ppm) =Cu(%)*60.256 + Zn (%) *15.172 +Pb(%)*8.128 +Ag(ppm) +Au(ppm) *37.332
Assumed commodity prices: Copper (Cu) US$12,000/t; Zinc (Zn) US$3,000/t; Lead (Pb) US$1,800/t, Silver (Ag) US$70/ozt; Gold
(Au) US$3,000/ozt.
Assumed metallurgical recoveries: Copper (Cu) 97.3%; Zinc (Zn) 98.0%; Lead (Pb) 87.50%; Silver (Ag) 86.1%; Gold (Au) 75%.
The metallurgical recoveries used in the metal equivalent calculations are the average metallurgical recoveries determined
through preliminary metallurgical test work undertaken at the Ciclón and Exploradora Prospects. A program of 7 rougher
metallurgical tests has been completed at a conceptual engineering stage level (Ciclón = 4, Exploradora = 3). Sample pulp
material (70% passing 2mm) was utilised for one test, with the remainder using crushed drill samples (85% passing 75 microns).
It is the Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be
recovered and sold.
Please refer to the Company’s ASX announcement dated 19 June 2026 for full details regarding the Ciclón Project
Mineral Resource Estimate.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Norfolk Metals Limited
ABN Quarter ended (“current quarter”)
38 652 438 385 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (49) (49)
(e) administration and corporate costs (116) (116)
1.3 Dividends received (see note 3) - -
1.4 Interest received 1 1
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(164) (164)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (1,815) (1,815)
(c) property, plant and equipment - -
(d) exploration & evaluation (601) (601)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(2,416) (2,416)
3. Cash flows from financing activities
20 20
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings 1,906 1,906
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) –
receipt/(payment) of insurance funding
facility
- -
3.10 Net cash from / (used in) financing
activities
1,926 1,926
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
808 808
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(164) (164)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(2,416) (2,416)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,926 1,926
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
155 155
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 155 808
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (Corporate Credit Card) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
155 808
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
47
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
14
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 1,906 1,906
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 1,906 1,906
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
The Company has an unsecured term loan facility with Anthina Nominees Pty Ltd, an entity
related to Anthony McClure. As at 30 September 2026, A$1,905,903 had been fully
advanced. Interest accrues daily at 8% per annum and is capitalised monthly.
Repayment is due on the earliest of: 10 Business Days after shares are issued under the
prospectus offer; the Company having sufficient available capital to repay the loan; or 15
October 2027, subject to any extension agreed under the loan agreement.
The loan agreement allows additional tranches for project costs, working capital and
acquisition completion costs at the lender’s sole discretion. No maximum limit of additional
funding is specified.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (164)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(601)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (765)
8.4 Cash and cash equivalents at quarter end (item 4.6) 155
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 155
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.20
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: On 11 June 2026 the Company announced the transformative acquisition of the
Ciclon Project and one of the conditions precedent is the completion of a public
offer pursuant to a Prospectus to fund the acquisition, exploration of the Ciclon
Project and the Company’s other operations. On 19 October 2026 the Company
provided a transaction update noting that the minimum capital raising commitment
to complete the Ciclon Project is $75 million.
Subsequent to the quarter, the Company announced it had entered into a loan
agreement with Anthina Nominees Pty Ltd (Anthina), an entity controlled by Mr
Anthony McClure (Anthina Loan Agreement), under which Anthina has provided the
Company with an unsecured loan facility to assist with operational costs and
working capital.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Based on the answers to questions 8.8.1 and 8.8.2, yes.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 October 2026
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.