Operations Camp Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX: NFL
25 June 2025
Operations Camp Update
Norfolk is pleased to report further progress at the Carmen Copper Project in Chile as logistics
progress prior to the Maiden Drill Campaign planned for Q3, 2025.
•
Established Operations Camp contracted at Alto del Carmen to accommodate the Exploration Team
including Geologists, Field Assistants and Drilling Contractors with approximate 1 hour commute to the
Carmen Copper Project (Carmen).
•
Offices and core processing facilities also stationed at the Operations Camp with industrial water
supply for drilling sourced from this location.
•
Alto del Carmen is a small interior town located only 12 linear kilometres from the Carmen Copper
Project and serves as the gateway to several large mining projects in the high Cordillera of the 3rd region
(Atacama).
•
Drill rig mobilisation and fuel transport will utilize the 80km long municipal maintained road from
Vallenar from the north of Carmen. The daily commute for the Exploration Team, Drilling Contractors
and Water Transport will utilize the 22km access road from Operations Camp accessing Carmen from
the south.
Ben Phillips the Executive Chairman of Norfolk comments; “Norfolk and Transcendence are pleased
to ramp up activities at the Carmen Copper Project. The Maiden Drill Campaign has been planned to
support the ambition in delineating a shallow copper oxide resource of sufficient magnitude to develop a
low-cost, high-margin, value-accretive heap leaching operation producing copper cathode at the mine
gate. Prospective drill holes targeting known sulphide mineralisation will also provide further
understanding of prospects beneath the surface oxides. I expect a busy second half of 2025 for Norfolk
and our shareholders as we commence planned works and continue to update the market.”
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 1: Township of Alto del Carmen viewed from the north along access roads to the Carmen Copper
Project. Yellow oval shows Carmen Copper Operations Camp location.
Alto del Carmen; Operations Camp, Core Processing Facility and Core Shack Secured
An established facility has been contracted as the Carmen Copper Operations Camp located in the town of Alto
de Carmen with full accommodations for the Exploration Team and Drilling Contractors as well as the logging and
processing Core Shack.
The town Alto del Carmen is a small, town-oriented community located approximately 1 hour from the Carmen
Copper Project and 1 hour from Vallenar (mining town with all services) via a sealed road.
Alto de Carmen offers all basic services and the company has organised to contract an establish camp with fullservice accommodation for employees and sub-contractors. Supermarkets, restaurants, local public services,
hardware stores, medical post and police services are available locally.
The camp features cabin style lodging with modern plumbing, kitchenettes, and sanitary facilities. A mess and
food service for 20 persons will service the team and contractors 24 hours/day. The Core Shack has full 380V three
phase electric power and water sources.
An industrial water source for drilling is also located in Alto de Carmen, and the company has secured an
agreement for sourcing the water required for the Maiden Diamond Drilling Program at the Carmen Copper Project.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
2
ASX ANNOUNCEMENT
Tobaco
Carmen Main
Dolores
Ops Camp
Figure 2: Location of Alto del Carmen, where the company has secured an Exploration Base Camp and
offices
Figure(s) 3: Villas at Carmen Copper Operations Camp located at Alto de Carmen
This announcement has been authorised by the directors of Norfolk Metals Ltd
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
3
ASX ANNOUNCEMENT
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km 2. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, highmargin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
The Roger River Project comprises two granted exploration licenses, EL20/2020, and EL17/2021, which together
cover 74km2, located 410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold
and copper as indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the
Roger River Fault along with carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au
Forward Looking Statements
This announcement includes “forward looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward looking statements can be identified by the use of forward looking terminology, including,
without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”,
“goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would”, “could” or “should” or, in each
case, their negative or other variations or comparable terminology. These forward looking statements include all
matters that are not historical facts. By their nature, forward looking statements involve known and unknown risks,
uncertainties and other factors because they relate to events and depend on circumstances that may or may not
occur in the future and may be beyond the Company’s ability to control or predict which may cause the actual
results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements. Forward looking statements are based on assumptions and are not
guarantees or predictions of future performance. No representation is made that any of these statements or
projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness
or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements
may be based are reasonable. Forward looking statements speak only as at the date of this release and the
Company and its affiliates, related bodies corporate (as that term is defined in the Corporations Act) and its
directors, employees, officers, representatives, agents, partners, consultants and advisers disclaim any
obligations or undertakings to release any update of, or revisions to, any forward-looking statements in this
announcement.
Disclaimers
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release. The Company will not update or keep current the information contained in this release or to correct any
inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any
opinions express in this release are subject to change without further notice.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
4
Share your feedback
Discover