Uranium Bearing Floodplain Intersected at Orroroo Project
Released
Released
Announcement PDF
ASX:NFL
Uranium Bearing Floodplain
Intersected at Orroroo Project
Date: 7 February 2024
ASX Code: NFL
Capital Structure
Ordinary Shares: 38,000,000
Unlisted Options: 9,990,000
Listed Options: 10,999,808
Performance Shares: 1,400,000
Current Share Price: 18.5c
Market Capitalisation: $7.03m
Cash: $3.49m (31 Dec 2023)
Debt: Nil
Directors
Ben Phillips
Executive Chairman
Leo Pilapil
Technical Director
Patrick Holywell
Non-Executive Director
Phase 2 drilling completed with a further 5 holes drilled in
January 2024
Drilling identified prospective uranium-bearing floodplain
50m south of the modern-day creek at Wongway Creek Target
(formerly Target 1)
Primary target model considered to be similar to the
Beverly uranium mine model where the highest grades of
uranium are expected to be located at the base of the incising
part of the palaeochannel
Heavy rain and a malfunctioning PFN tool caused delays
however gamma probe continued to delineate uranium
Norfolk progressing exploration with additional land
access, drill permitting and geophysics being considered
Arron Canicais
Company Secretary
Contact Details
Suite 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 1: Wongway Creek Target cross section with interpreted floodplain and
associated gamma spikes delineating uranium
Norfolk Metals Limited I ABN: 38 652 438 385
1
www.norfolkmetals.com.au
ASX:NFL
Commenting on Norfolk Metals, Executive Chairman, Ben Phillips, states:
“It is clear the Orroroo Project has reached a critical value point having further derisked the project at the completion of the maiden drill program post a successful
capital raise in late 2023. There is a clear path for exploration upside in this wellfunded and well-structured uranium explorer with an abundance of permitted
ground hosting drill targets. There is no better place in the world to be a junior
uranium explorer in the current market and Norfolk has the support and capital to
see the job through. The recent results further confirm the east west creeks as sound
targets opening the door for north south orientated passive seismic and/or detailed
ground magnetics as possibilities. We could also elect to go straight into subsequent
drilling given the non-cost prohibitive operations and welcoming local community.”
Maiden Drill Program Completed
Norfolk Metals Ltd (Norfolk or the Company) is pleased to advise that Phase 2 drilling has
been completed with a further 5 holes drilled across EL6552, taking the total number of holes
completed in the maiden program to seventeen (17) (Figure 2). Phase 2 of the program
sought to test the palaeochannel model at the Wongway Creek Target where suitable drill
access was available. A total of three (3) holes were drilled along the river traverse of the
Wongway Creek Target testing both upstream and downstream regions. One (1) hole was
drilled downstream of the No Name Creek Target (formerly Target 3) as well as the Rankin
Rd Target (formerly Target 4). The completion of the maiden drill program has successfully
delineated uranium in ten (10) of the seventeen (17) holes providing data for the Company
to further develop a geological model of the Walloway Basin (Figure 3). Most importantly,
the interpreted uranium bearing floodplain intersected upstream of Wongway Creek gives
Norfolk confidence in the palaeochannel model and future exploration efforts can be
planned accordingly. Phase 2 encountered delays due to both weather issues and a
malfunctioning Prompt Fission Neutron (PFN) tool resulting in the final holes of the program
being successfully logged with a gamma probe only.
Norfolk Metals Limited I ABN: 38 652 438 385
2
www.norfolkmetals.com.au
ASX:NFL
Figure 2: Phase 1 and Phase 2 Drill Location Plan and cross section reference
PFN and Gamma logging
Post maiden drill program, the gamma probe was calibrated at the Australian Mineral
Development Laboratories (AMDL) in South Australia deeming accuracy and functionality.
Where PFN data was available, the gamma results indicate the close relationship between
the position of the gamma anomalies and the pU3O8 recorded by the PFN tool (Table 1).
The malfunctioning PFN tool is disappointing however it is the Company’s view that the
exploration progress of the project is not overly affected. The Company reported multiple
peak uranium readings via PFN logging (pU308) across intervals of uranium occurrences on
21 December 2023. When reporting these peak uranium grades in December the Company
elected only to report PFN data supported with associated peaks in gamma logging results
as not to overstate the prospectivity of the program. This approach to the logging results
allowed Norfolk to interpret gamma spikes measured in counts per second (cps) throughout
Phase 2 of drilling as successful delineation of uranium occurrences where logs are
comparable to Phase 1 logs and the lithology of the basin supports such interpretation. Most
importantly the lack of PFN logging in Phase 2 did not hinder Norfolk’s exploration approach
by noting the elevated spikes from the gamma readings within the geologically important
marker kaolinite and khaki/limonite clay horizons.
Norfolk Metals Limited I ABN: 38 652 438 385
3
www.norfolkmetals.com.au
ASX:NFL
Depth
From
Depth
To
Thickness
Gamma
Spike
Peak
Grade
Gamma peak
within interval
(m)
(m)
(m)
(pU308)
(cps)
ORMR001
104.75
105.31
0.57
NA
160 @ 104.91m
No PFN data available
ORMR002
111.77
113.54
1.78
NA
189 @ 112.42m
No PFN data available
Hole ID
Comments
ORMR003
x
x
x
NA
NA
ORMR004
153.23
154.75
1.53
NA
321 @ 153.80m
No Significant Gamma, no PFN data available
ORMR005
x
x
x
NA
NA
No Significant Gamma, no PFN data available
No Significant Gamma, no PFN data available
No PFN data available
ORMR006
x
x
x
NA
NA
ORMR007
100.51
100.84
0.34
330ppm
245 @ 100.68m
ORMR007
116.11
116.44
0.34
796ppm
242 @ 116.28m
ORMR008
99.59
100.4
0.82
453ppm
510 @ 99.99m
ORMR009
121.95
122.51
0.57
538ppm
225 @ 122.25m
ORMR010
x
x
x
NA
NA
No Significant Gamma, no PFN data available
ORMR011
x
x
x
NA
NA
No Significant Gamma, no significant PFN
ORMR012
x
x
x
NA
NA
No Significant Gamma, no significant PFN
ORMR013
x
x
x
NA
NA
No Significant Gamma, no significant PFN
ORMR014
91.6
92.01
0.41
235ppm
135 @ 91.84m
Thickness reference pU308
ORMR015A
133.74
134.34
0.61
NA
270 @ 133.93m
No PFN data available
ORMR015A
139.45
139.79
0.35
NA
290 @ 139.59m
No PFN data available
ORMR016
89.23
89.96
0.74
NA
242 @ 89.67m
No PFN data available
ORMR017
132.39
132.63
0.25
NA
225 @ 132.47m
No PFN data available
ORMR017
141.57
142.11
0.55
NA
205 @ 141.78m
No PFN data available
ORMR017
146.8
147.16
0.37
NA
210 @ 146.85m
No PFN data available
Table 1: Down hole logging pU308 *Peak Grade and associated gamma log counts per second (cps)
delineating interpreted uranium bearing zones of lithology in holes unable to be logged with PFN tool
*Peak grade(s) noted are the direct detection of pU308 over a 0.02m interval by Prompt Fission
Neutron downhole logging within a composite intersection with a cut-off grade greater than 100ppm
pU308.
Phase 2 Floodplain Interpretation
The pre-drilling model was targeting the presence of palaeochannels approximately 100 to
150 metres to the south of the modern-day creeks associated with uranium intersected in
historical Linc Energy Wells. Drilling results from Phase 1 indicated that the uranium in the Linc
Energy Wells appeared to be associated with a secondary permeability created by
downward displacement of the sediments resulting from basement faulting or soft sediment
deformation. Phase 2 drilling continued to test the targeted prospective palaeochannels
located to the south of the modern-day creeks at closer than expected distance of 50m.
Younger palaeochannels were seen south of the modern-day creeks in ORMR004 (Walloway
Creek Target) and ORMR016 (Rankin Rd Target) at the base of the regolith. This further
supports the model of palaeochannels occurring south of the modern-day creeks due to a
change in regional slope.
Drillhole ORMR015A was drilled 50m south of the modern-day creek at Wongway Creek
Target. Drilling upstream from previous holes enabled easier location of the targeted
prospective and potentially wider palaeochannel. This hole encountered what appears to
be a silt dominated floodplain with minor gravel (Image 1) and two elevated gamma
anomalies signifying uranium towards the top of this unit as well as the base of this unit (Figure
Norfolk Metals Limited I ABN: 38 652 438 385
4
www.norfolkmetals.com.au
ASX:NFL
1). This unit appears to be the middle section of a palaeochannel between the sand and
gravel dominated incising part of a palaeochannel and the clay dominated edge of a
floodplain.
Image 1 – Drill samples from ORMR015A showing the kaolonitic clay marker unit from 121-130m and
floodplain silt from 130-137m.
Most importantly, this floodplain unit was seen directly below a kaolinitic clay marker bed
(10m thick on average) which is located in all drillholes across the Walloway Basin. The
kaolinitic clay unit appears to be a transitional unit from deepwater lake sediments to an
exposure surface where the water has evaporated and kaolinite is able to precipitate at the
surface under sub-tropical conditions (Figure 3). Above this marker bed is further deep-water
lake type sediments. If there was to be a time period where a palaeochannel was able to
form in the Walloway Basin it would potentially be directly below the kaolinite clay marker
bed as was seen in ORMR015A.
Drillhole ORMR017 was drilled 70m north-west from ORMR015A with the aim of intersecting
the incising part of the palaeochannel. A deep incising palaeochannels was not intersected
however, an elevated gamma response around 132 metres depth coincided with the top
of the floodplain in ORMR015A suggesting that the palaeochannel is possibly located within
metres of the targeted region. Heavy rain whilst drilling ORMR017 unfortunately forced the
program to end prematurely and follow-up drilling to identify the incising part of the
palaeochannel was not possible.
Norfolk Metals Limited I ABN: 38 652 438 385
5
www.norfolkmetals.com.au
ASX:NFL
Figure 3: Orroroo Project Regional Cross Section
*Please note that some drill holes deliberately omitted for illustration only (scale)
Uranium mineralisation in the historic Linc Energy Wells appeared to be associated with a
secondary permeability created by downward displacement of the sediments resulting from
basement faulting or soft sediment deformation. Soft-sediment deformation is created in
deep basins where sediments towards the middle of the basin start to sink whilst sediments
near the edges of the basin are held up by the presence of basement and resist sinking. Softsediment deformations is seen as a series of concentric steps that appear as small fault
offsets.
As demonstrated in cross section A-A (Figure 3), the thickness of the regolith changes
dramatically across the basin whereas the sediments below the regolith retain similar
thicknesses. The effect of faulting and soft sedimentation is apparent when looking at the
kaolinitic clay marker bed which may have been deposited as a flat-lying unit. This marker
bed shows numerous up and down displacements. The age of the soft-sediment
deformation and faulting appears to be Quaternary due to the changes in thickness of the
regolith sediments.
Drilling completed around well 7P3 at the Wongway Creek Target had a noticeable 8m
throw in the sediments with a noticeable mustard coloured limonite rich fluid that appeared
to overprint the original clay samples. There was common uranium associated with this event.
Norfolk Metals Limited I ABN: 38 652 438 385
6
www.norfolkmetals.com.au
ASX:NFL
This same feature was seen at the Rankin Rd Target as shown in Image 2. Drilling has shown
that the limonite rich fluid can be a marker unit since it appears to be downthrown from
prospective uranium-bearing palaeochannels within a few hundred metres. The limonite rich
fluid appears to be moving along the permeable steps through the clay rich units created
by soft sediment deformation and faulting. Soft sediment deformation and faulting does not
explain how uranium has entered the clay dominant system and the palaeochannel model
remains the likely source of uranium into the Walloway Basin
Image 2: Drill samples from ORMR007 at the Rankin Rd Target showing the limonite rich fluid from 101104m with a small uranium zone occurring at 101m. The kaolinitic clay marker bed at 85-94m.
Several holes were drilled to test the regional areas away from the creek beds. However the
limonite rich fluids overprinting the khaki clays appear to become more distinguished
towards the creek beds. The gamma anomalies within the khaki/limonite clay units also
appear to get stronger and more pronounced towards the creek beds. In summary, there
appears to be a close spatial relationship between the intensity and thickness of the limonite
units and the gamma anomalies and close proximity to possible uranium bearing
palaeochannels. This is a significant observation and has provided a very important vector.
Overall, the drilling results suggests that the primary target model remains to be a Beverley
deposit type uranium model where the highest grades of uranium are expected to be
located at the base of the incising part of the palaeochannel with lower uranium grades
seen in the floodplains. It is the intent of the company to continue the exploration efforts
around the Wongway Creek Target by defining the uranium bearing palaeochannel
through either/both geophysics and close-spaced drilling.
The priority for this drilling program has been the Wongway Creek Target yet the likelihood
remains that if high grade uranium can be confirmed at the Wongway Creek Target then the
other targets (Walloway Creek, No Name Creek and Rankin Rd) may likely to contain similar
geology and uranium grades.
Norfolk Metals Limited I ABN: 38 652 438 385
7
www.norfolkmetals.com.au
H
ORMR002
P02
279097
6388646
130
H
ORMR003
P53
279051
6388636
138
H
ORMR004
P18
275791
6386143
161
ORMR005
P19
275840
6386150
ORMR006
P46
276719
ORMR007
P47
ORMR008
28/11/2023
0-90
29/11/2023 90-150
1
NK Hole ended @ 150m target reached
29/11/2023
0-72
30/11/2023 72-130
1
NK Hole ended @ 130m target reached
30/11/2023
0-108
1/12/2023 108-138
1
H
2/12/2023
0-125
3/12/2023 125-161
2
155
H
3/12/2023
0-119
4/12/2023 119-155
2
6382347
149
H
5/12/2023
0
5/12/2023
149
4
276725
6382330
149
H
5/12/2023
0-59
6/12/2023
59-149
4
D
279676
6388816
149
H
7/12/2023
0-121
8/12/2023 121-149
1
ORMR009
C
278363
6390067
149
H
9/12/2023
0
9/12/2023
149
reg
ORMR010
3
276342
6389690
149
H
10/12/2023
0
10/12/2023
149
reg
ORMR011
1
277329
6388049
149
H
12/12/2023
0
12/12/2023
149
reg
ORMR012
1.1
277330
6388150
149
H
13/12/2023
0
13/12/2023
149
reg
ORMR013
P16
277356
6383561
149
H
9/01/2024
0
9/01/2024
149
3
ORMR014
P18
279795
6389033
125
H
10/01/2024
0-95
ORMR015
P14
276177
6388521
11
A
11/01/2024
0
NK Hole ended @ 138m target reached
Drilled without 1m bit rod. Hole ended @ 161m
NK target reached
Drilled without 1m bit rod. Hole ended @ 155m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 149m
NK target reached
Drilled without 1m bit rod. Hole ended @ 125m
NK target reached
Cased 0-6m. Drilled without 1m bit rod. Hole
NK ended @ 149m target reached
Hole abandoned @ 11m due to gravels falling into
NK hole
Cased 0-22m. Drilled without 1m bit rod. Hole
NK ended @ 161m target reached
Drilled without 1m bit rod. Hole ended @ 137m
NK target reached
Cased 0-17.5m. Drilled without 1m bit rod. Hole
NK ended @ 155m target reached
ORMR015A
P14
276173
6388518
161
H
11/01/2024
0-11
ORMR016
P17
277429
6382111
137
H
15/01/2024
0
ORMR017
P55
276151
6388569
155
H
16/01/2024
0-59
11/01/2024 95-125
1
11/01/2024
1
11
13/01/2024 11-161
1
15/01/2024
4
137
18/01/2024 59-155
1
Comments
Driller
Reason_To_End
150
Target_Number
Max_Depth
6388669
Completed_Drill
Northing_GDA94
279095
Date_Completed
Easting_GDA94
P01
Start_Drill
Peg_ID
ORMR001
Date_Started
Hole_ID
ASX:NFL
Table 2. Phase 1 & 2 drill collars and status
END
This announcement has been authorised by the board of directors of Norfolk.
Competent Persons Statement
The information in this announcement that relates to exploration results, is based on, and
fairly represents, information and supporting documentation prepared by Mr Leo Pilapil, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy.
Mr Pilapil has a minimum of five years’ experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore
Reserves Committee Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Pilapil is a related party of the Company, being the
Technical Director, and holds securities in the Company. Mr Pilapil has consented to the
inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
About Norfolk Metals
The Roger River Project comprises two granted exploration licenses, EL20/2020, and
EL17/2021, which together cover 261km2, located 410km northwest of the capital city of
Hobart, Tasmania. The Project is prospective for gold and copper as indicated by the intense
silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault
along with carbonate-rich host rocks.
The Orroroo Uranium Project comprises two granted exploration licenses, EL6552, and
Norfolk Metals Limited I ABN: 38 652 438 385
8
www.norfolkmetals.com.au
ASX:NFL
EL6814, which together cover 659km2, located approximately 274km northwest of the
capital city of Adelaide, South Australia within the Walloway Basin, which is an elongate
Tertiary Basin approximately 50km long and up to 15km wide. It consists of Tertiary and
Quaternary sediments unconformably underlain by Adelaidian basement.
For further information please visit www.norfolkmetals.com.au.
Norfolk Metals Limited I ABN: 38 652 438 385
9
www.norfolkmetals.com.au
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code Explanation
Sampling
techniques
● Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
● Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or
systems used.
● Aspects of the determination of mineralisation that are Material to
the Public Report.
● In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases, more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
Drilling
techniques
● Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
Norfolk Metals Limited I ABN: 38652 438 385
Commentary
●
Rotary mud drilling was used to obtain 2m samples in
the non-target area and 1m mud /chip samples within
the target area.
●
Downhole wireline logging using a Prompt Fission
Neutron (PFN) tool was used to calculate pU3O8from
the ratio of epithermal and thermal neutrons.
●
The PFN used in this program was calibrated using
industry standard procedures at the Australian Mineral
Development Laboratories (AMDEL) calibration facility
(Adelaide).
●
Gamma tool was calibrated at the end of the drill
program. GeoData Instrument P/L had the Geovista
Gamma Tool complete test runs - 3 times in each of the
various U3O8 sample pits and in the hole size correction
factor pit. The calibration was also conducted at
AMDEL.
●
Gamma data (as counts per second) from calibrated
probes are converted into equivalent uranium values
(eU3O8) using appropriate calibration factor (K factor)
and all other applicable correction factors probe dead
times, drilling mud density, hole diameter)
•
All holes were drilled by Watson Drilling with typical hole
diameter being 6” (152.4mm).
All holes were drilled vertically and intersections
•
www.norfolkmetals.com.au
1
Criteria
JORC Code Explanation
Commentary
other type, whether core is oriented and if so, by what method, etc).
Drill sample
recovery
● Method of recording and assessing core and chip sample recoveries
and results assessed.
● Measures taken to maximise sample recovery and ensure
representative nature of the samples.
● Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
● Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
● Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
● The total length and percentage of the relevant intersections
logged.
Subsampling
techniques
and sample
preparation
● If core, whether cut or sawn and whether quarter, half or all core
taken.
● If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
● For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
● Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
● Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
● Whether sample sizes are appropriate to the grain size of the
material being sampled.
Norfolk Metals Limited I ABN: 38652 438 385
measured represent true thicknesses.
●
Caliper data show that borehole size increases in zones
of unconsolidated sands, hence all pU3O8grades were
calculated and corrected for borehole size from caliper
data taken every 5cm downhole using the equation
{2.737*({EPITHERM}/{THERMAL}-0.02)}*{-1*Power(10,06 )*Power({CAL},2)+0.0097*{CAL}-0.0313}
●
Rotary mud drilling was used to obtain 2m samples in
the non-target area and 1m mud /chip samples within
the target area.
●
All samples are geologically logged compliant with
industry standards which included lithology, mineralogy,
grain size/rounding/sorting, colour, redox.
●
All samples were photographed using a high-resolution
camera.
●
The depth of investigation of the PFN tool approximately
25-40 cm radius around the borehole to allow for
accurate measurement of the ratio of
epithermal/thermal neutrons for pU3O8 calculations.
●
QA/QC of pU3O8 data included repeatability checks
by regularly logging a fibreglass-cased calibration hole
onsite at Alligator Energy (ASX:AGE) (MRC002, 723703E,
6324350N (GDA94), depth 84.5m). MRC002 has sufficient
assay data in the target zone to compare/calibrate PFN
data.
www.norfolkmetals.com.au
2
Criteria
JORC Code Explanation
Quality of
assay data
and
laboratory
tests
● The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and
their derivation, etc.
● Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision have been
established.
Verification
of sampling
and
assaying
● The verification of significant intersections by either independent or
alternative company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
● Discuss any adjustment to assay data.
Norfolk Metals Limited I ABN: 38652 438 385
Commentary
●
Three geophysical tools were used:
●
Prompt Fission Neutron Tool (PFN) serial number 22
manufactured by Geoinstruments Inc, Nacogdoches,
Texas. Neutron generator 78-80kV, logging at
0.5m/minute.
●
Multisurvey tool (MST) serial number 24 manufactured by
Geoinstruments Inc, Nacogdoches, Texas. Measures
16Normal, 64Long borehole resistance, Point Resistance,
and Self Potential and uncalibrated natural gamma for
depth matching.
●
GeoVista 3-arm caliper, serial number 5589, measures
the bore-hole size in millimetres for the length of the
bore hole.
●
QA/QC of pU3O8data included repeatability checks by
regularly logging a fibreglass-cased calibration hole
onsite at Alligator Energy (ASX:AGE) (MRC002,723703E,
6324350N (GDA94), depth 84.5m). MRC002 has sufficient
assay data in the target zone to compare/calibrate PFN
data.
●
Natural gamma (on the caliper tool) was used for depth
matching the PFN.
●
No wireline stretch was observed during the program.
●
Downhole PFN/gamma data are provided as LAS files
by ULCAO. LAS files (a common industry space
delimited format for downhole geophysical data) were
viewed in WellCad (saved as WellCad .WCL files). These
were later uploaded to the geological database and
the database server is backed up regularly.
www.norfolkmetals.com.au
3
Criteria
JORC Code Explanation
Location of
data points
● Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
● Specification of the grid system used.
● Quality and adequacy of topographic control.
●
Drillholes are sited using a Garmin handheld GPS.
●
Grid System: GDA94 Projection 54H.
●
No downhole surveys were completed due to the
preliminary nature of the programme. All holes were
drilled vertically and the shallow drillhole depths relative
to wide drill spacing would have minimal effect on
potential misposition of mineralised intercepts.
● Data spacing for reporting of Exploration Results.
● Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
● Whether sample compositing has been applied.
●
Drill spacings chosen for the investigation were up to
kilometres apart (see Figure 2 of the Announcement).
●
Intercepts from the geophysics tools have been
reported for intervals >0.02m downhole thickness with
an average of >100ppm pU308 for the PFN tool.
●
The same parameters have been applied for the
aggregate intercepts. Internal dilution of continuous
zero readings no greater than 0.1m in downhole length
has been included in the composite calculations.
Data
spacing and
distribution
Commentary
Orientation
of data in
relation to
geological
structure
● Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
● If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
●
The mineralisation is interpreted to be contained in clay
sediments.
●
All drillholes are vertical which is appropriate for the
orientation of the mineralisation.
Sample
security
● The measures taken to ensure sample security.
●
All samples are kept under locked security while logging
is completed to then be stored at an adequate facility
in Adelaide.
Audits or
reviews
● The results of any audits or reviews of sampling techniques and data.
●
No audits or reviews undertaken of sampling techniques
to date.
Norfolk Metals Limited I ABN: 38652 438 385
www.norfolkmetals.com.au
4
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral
tenement and
land tenure
status
● Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
● The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
●
The Orroroo Project is located on exploration licenses
EL65
Share your feedback
Discover