Presentation NWR Virtual Copper Conference
Released
Released
Announcement PDF
Carmen Copper Project
“Wired for Growth”
Virtual
Copper
Conference
Transformational Project
Tier 1 Jurisdiction
Proven Team
Investor Presentation
September 2025
ASX:NFL
norfolkmetals.com.au
Disclaimer
Presentation: This presentation has been prepared and issued by Norfolk Metals Limited (ASX: NFL, Norfolk or the Company) to provide general information about the Company. The information in
this document is in summary form and should not be relied upon as a complete and accurate representation of any matters that a reader should consider in evaluating the Company. While
management has taken every effort to ensure the accuracy of the material in this presentation, the Company and its advisers have not verified the accuracy or completeness of the material contained in
this presentation.
Forward-looking statements: This presentation contains forward looking information about the Company and its operations. In certain cases, forward looking information may be identified by such
terms as "anticipates", "believes", “should”, "could", "estimates", “target”, “likely”, “plan”, "expects", "may", “intend”, "shall", "will", or "would". These statements are based on information currently
available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward looking statements are subject to risk factors associated with the
Company’s business, many of which are beyond the control of the Company. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of
variables and changes in underlying assumptions which could cause actual results or trends to differ materially from those expressed or implied in such statements. There can be no assurance that
actual outcomes will not differ materially from these statements.
Not financial product advice: This presentation is not financial product nor investment advice or a recommendation to acquire securities in the Company. It has been prepared without taking into
account the objectives, financial situation or needs of individuals Before making any investment decision, prospective investors should consider the appropriateness of the information having regard to
their own objectives, financial situation and needs and seek legal and taxation advice
No offer: This presentation and its contents are not an invitation, offer, solicitation or recommendation with respect to the purchase or sale of any securities in the Company in any jurisdiction and must
not be distributed, transmitted, or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that
or any other jurisdiction. This presentation is not a prospectus or any other offering document under Australian law (and will not be lodged with the Australian Securities and Investments Commission)
or any other law.
INVESTOR PRESENTATION
Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this presentation will be achieved or proved correct. Except for statutory liability
which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of
the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any
information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission
which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.
Competent Person Statement: The information is extracted from announcements entitled ‘Norfolk to earn-into Chilean Copper Project’ created on 31 March 2025, ‘Carmen Copper Project Maiden
Drill Campaign Update’ created on 12th May 2025, ‘Norfolk to proceed with Stage 1 Earn-in at Carmen Copper’ created 13th June 2025, ‘ Carmen Copper Project Drilling Permit Granted’ created 21st July
2025 and ‘RC Drilling Commenced at Carmen Copper’ created 13th August 2025 which are available to view on https://norfolkmetals.com.au/asx-announcements/. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Authorisation: This presentation is authorised for release by Norfolk’s board of directors.
All currency amounts are in Australian dollars unless otherwise specified.
Presentation cover image: View when driving into site via road from Alto del Carmen Operations Camp.
2
Carmen Copper Project objective
INVESTOR PRESENTATION
“Our objective is to define a copper oxide resource
of sufficient scale to support a low-cost, high-margin heap
leaching operation while simultaneously unlocking the
substantial shallow sulphide potential below the oxide cap”
3
Copper powers progress
Copper is the backbone of electrification and global growth; it is pivotal to the green energy
transition and growing AI data centre requirements. Supply gaps are driving long-term upside.
Copper now included in draft “2025 List of Critical Minerals” as of 25th August 2025
US Department of Interior announce draft “2025 List of Critical Minerals” including copper
Copper Firms Up Near Record High
Copper futures edged up to around US$5.73 per pound on Wednesday 23rd July 2025
(TradingView - https://www.tradingview.com/news/te_news:471954:0-copper-firms-up-near-record-high/)
INVESTOR PRESENTATION
(https://www.doi.gov/pressreleases/department-interior-releases-draft-2025-list-critical-minerals)
Energy Transition
Investment would need to average $5.6 trillion each year from 2025 to 2030,
in order to get on track for global net zero by 2050, in line with the Paris Agreement
(Global Investment in the Energy Transition Exceeded $2 Trillion for the First Time in 2024, https://about.bnef.com/insights/finance/global-investmentin-the-energy-transition-exceeded-2-trillion-for-the-first-time-in-2024-according-to-bloombergnef-report/)
Copper Supply Gap
Current copper mine project pipeline points to a 30% supply deficit by 2035
(2025 edition of the IEA’s annual Global Critical Minerals Outlook, https://www.iea.org/news/diversification-is-the-cornerstone-of-energy-security-yet-criticalminerals-are-moving-in-the-opposite-direction)
4
Board and Project Operators
Ben Phillips
Jason Greive
Director – Transcendence Mining
Carmen Copper JV Operators
Mr Greive is an experienced mining executive and project
development professional with over 30 years of corporate,
operational and project development experience in gold, copper,
iron ore and base metals. Mr Greive has worked for several
multinational mining houses such as Barrick Gold, Placer Dome,
Rio Tinto, North Ltd and Evolution Mining across numerous
jurisdictions including Sweden, South Africa, Tanzania, Indonesia
and The Philippines. In his more recent roles with Evolution Mining
as General Manager of the Cowal Gold Mine (NSW) and Red 5 as
Chief Operating Officer, he was instrumental in the initiation,
navigation, leadership and delivery of significant expansion and
greenfield development projects at Cowal and King of the Hills
operations.
Leo Pilapil
Patrick Holywell
Non-Exec Technical Director – Norfolk Metals
Independent, Non-Exec Director – Norfolk Metals
David Fowler
Alex Raab
Director - Transcendence Mining
Carmen Copper JV Operators
Mr Fowler is a finance professional with over 35 years of
financial & mining industry experience. As the CFO at Merdeka
Copper Gold, he has been instrumental in funding the growth
of the group from a single asset gold project into a multicommodity business with an enterprise value of US$9 Billion in
2024. He has led debt & equity funding processes to raise
more than US$400m in equity and US$4B in debt during this
time. Mr Fowler has worked in numerous other executive roles
including CEO of Orosur Mining, a South American focused
gold company producing 100,000 ounces of gold per annum
and Finders Resources Limited that operated the 20,000-tonne
per annum Wetar copper heap leach project.
INVESTOR PRESENTATION
Executive Chair – Norfolk Metals
Carmen Copper SPA
General Manager - Exploration
Mr Raab has over 30 years exploration and project development
experience in Latin America and North America. He has worked for
several major & junior mining - exploration companies including:
Homestake Mining, Kennecott Minerals, MIM Exploration, Farwest
Mining, Chapleau Resources, Uruguay Minerals, Orosur Mining, Golden
Rim Resources, Challenger Gold and others. His experience includes;
epithermal Au-Ag/poly-metallic, sediment-hosted Au, shear zone
hosted lode-gold, Au-Cu, and Au porphyry; IOCG deposits, magnetite,
and other industrial commodities. In 2020, Alex took an Exploration
Manager position with Challenger Gold (formally Challenger Exploration)
managing exploration in Ecuador which resulted in two separate maiden
MRE´s within 4 years on the AuCu-Ag-Mo Porphyry Deposits.
5
Key messages & value proposition
(https://www.mining-technology.com/marketdata/five-largest-copper-mines-chile/?cf-view)
(https://discoveryalert.com.au/news/chile-copper-production-record-2025-global-impact/)
2. Strong development potential with a proven team
Historical shallow resource (refer to Annexure A) over ~5% of mineralised strike open in all directions with
oxide ore metallurgy and other project characteristics conducive to low cap-ex heap leaching methodology.
The Transcendence Mining team bring an experienced resource and project development team with incountry experience. The sulphide mineralisation potential below the oxide cap provides significant upside.
INVESTOR PRESENTATION
1. Copper and Chile is the right commodity at the right address
Chile is the world leader in copper production and known deposits. More than 60 copper mines in Chile with
more than 2 dozen heap leach operations providing a proven platform for Norfolk objectives at the Carmen
Copper Project.
3. Company is fully funded and moving fast
The maiden drilling campaign is underway with drilling and exploration activities fully funded for the
remainder of 2025 with assay results and steady news flow expected.
6
Project overview
Mantos Blancos
82km from the historic mining town of Vallenar with a readily
available workforce
▪
Located in an easily accessible, rolling plateau
region between the elevations of 1950m-2150m
▪
Semi-arid with typical summer temperatures between 10-25°C and
winter temperatures between 0-15°C
Mantoverde Project
▪
12km from the national electrical grid and within 180km of three
industrial ports
▪
Large scale 46.6km2 concession package within the regionally
extensive north-trending San Felix Fault system, host to numerous
copper and gold bearing systems
▪
Historical copper-oxide resource of 5.6Mt @ 0.6% has been
outlined from surface to 30m which remains open in all directions1
▪
Strong potential for a material copper oxide resource
▪
Sulphide copper resource potential below the oxide zone
▪
Over 10,000m historical drilling by previous owners and operators
2.34bt @ 0.37% Cu
8.58mt contained Cu
Candelaria Complex
622mt @ 0.47% Cu
2.1mt contained Cu
INVESTOR PRESENTATION
▪
445mt @ 0.58% Cu
2.59mt contained Cu
1. Carmen NI 43-101 MRE. The mineral resource is a historical foreign estimate (within the meaning of the
ASX Listing Rules) and is not reported in accordance with the JORC Code and a Competent Person (within
the meaning of the JORC Code) has not done sufficient work to classify the foreign estimates as Mineral
Resources in accordance with the provisions of the JORC Code. It is uncertain that following evaluation and
further exploration work that the foreign estimates will be able to be reported as Mineral Resources in
accordance with the provisions of the JORC Code.
Please refer to Annexure A for information relating to the mineral resources and reserves classifications for
each of the Mantos Blancos Mine, Mantoverde Project and Candelaria Copper Mining Complex which have
been previously reported in accordance with NI 43-101 standards.
7
Project location
▪ Established Operations Camp in
town of Alto del Carmen
approximately 1h drive from site
(25 km)
▪ Altitude and precipitation allows
year-round access and operations
▪ All required services are available
at Alto del Carmen or Vallenar
INVESTOR PRESENTATION
▪ Industrial water supply for drilling
available at Operations Camp
8
Project highlights
August 2025 Norfolk commenced drilling up to 5,100m RC and DD
Maiden Drill Campaign at the Carmen Copper Project in Chile with
Transcendence Mining as Operators
Heap
Leachable
The project objective is to define a copper oxide resource of sufficient
scale to support a low-cost, high-margin heap leaching operation whilst
simultaneously unlocking the substantial sulphide potential
Copper heap leaching projects typically have lower capital development
costs making them suitable for a junior company, several characteristics
of the Carmen Copper project are conducive to this approach
The project hosts a historical copper oxide mineral resource reported in
accordance with NI 43-101 standards of 5.6Mt at 0.6% Cu**
Low Strip
Carmen
COPPER PROJECT
INVESTOR PRESENTATION
The project has significant copper oxide and copper sulphide
exploration potential with over 15km of strike across two mineralised
belts within a large-scale 46.6km2 concession package
Highly
Scalable
Amenable to
Low CapEx
Company is funded and drilling for the remainder of 2025 with
consistent drilling updates and assays results expected
**Historical foreign estimate (within the meaning of the ASX Listing Rules) and is not reported in accordance with the JORC Code and a Competent Person (within the meaning
of the JORC Code) has not done sufficient work to classify the foreign estimates as Mineral Resources in accordance with the provisions of the JORC Code. It is uncertain that
following evaluation and further exploration work that the foreign estimates will be able to be reported as Mineral Resources in accordance with the provisions of the JORC
Code. Refer to Annexure A for the NI 43-101 mineral resource classification.
9
Resource expansion potential
▪ The Carmen Copper Project historical resource
is contained within approx. 5% of the total
15km plus potential strike length of two major
geological belts within the project area.
INVESTOR PRESENTATION
▪ The Carmen-Tabaco Belt is over 7.5km long
and hosts the historical resource within
mineralisation from surface and old workings.
Mineralisation is mainly hosted in calc-silicate
altered and locally skarnified volcanics,
sediments and dacitic-rhyolitic porphyritic.
▪ The Higueritas Belt is approximately 7.5km long
and sub parallel to the Carmen-Tabaco Belt.
Sporadic old workings are known from this
area, but no drilling is available, with data
limited to geophysics and rock chip samples.
10
Carmen Copper Project – IP Chargeability (250m depth) with Targets
*
identified over the Carmen-Tabaco Belt & the Higueritas Belt
SW view over partial 7.5km of strike from Carmen Main towards Dolores
INVESTOR PRESENTATION
11
Oxide mineralisation
INVESTOR PRESENTATION
▪ The known* copper oxide
mineralization at Carmen Main is at
least 2.8 km long and 400-800m
wide - with less than 20% of this
strike length drilled
▪ The Carmen Main copper
oxide/enriched zone forms a
blanket from the surface to around
40m depth.
▪ The shallow & soluble copper oxide
mineralisation in the project area is
potentially amenable to a low strip,
low-cost open pit mining and heap
leaching operation
*Interpreted from geophysics, historical drilling, old
workings, surface exposures and soil anomalies (please
refer to the ASX announcement 31st March 2025).
Carmen Copper Project – Representative Cross Section
12
Exceptional oxide grades from surface
Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Higher Grade Intersections
Higher grade oxide intervals inside the Carmen NI 43-101 MRE
include;
INVESTOR PRESENTATION
TAB 33: 27.5m @ 1.12% Cu (from 1.5m), incl. 11.5m @ 1.88% Cu
TAB 55B: 19m @ 0.93% Cu (from 9m)
TAB 77: 8m @ 2.10% Cu (from surface)
TAB 82: 2m @ 7.22% Cu (from 20m)
Higher grade oxide intervals outside the Carmen NI 43-101 MRE
include;
CMM 56: 41m @ 2.46% Cu (from surface),
includes 4m @ 17.37% (Tabaco mineralisation)
CMM 35: 39m @ 1.48% Cu (from surface)
CMM 31: 29m @ 1.25% Cu (from surface)
CMM 53: 14.9m @ 1.82% Cu (from 8.1m)
Historic IPBX Drill Core re-logging carried out during the recent site
visits to the Carmen Copper Project
13
Oxide test work
Column 2
Column 3
Total Cu
1.29
0.33
0.95
Soluble Cu
1.22
0.28
0.82
Total Cu
1.33
0.33
0.93
Soluble Cu
1.14
0.29
0.82
kg/t
37.67
26.83
34.67
kg/kg Cu
3.9
9.89
4.62
Soluble Cu
84.69
93.24
91.63
Total Cu%
72.39
82.22
81.02
1/2 inch
1/2 inch
1/2 inch
Irrigation rate {Vhr/m3)
8
8
8
Leach Time Days
28
28
28
UGT-1100%
U GT-3 1 00%
UGT-1 45%
UGT -2 10%
UGT-345%
Head Grade Analysed
Head Grade Calculated
Acid Consumption
Recovery
Parameters
Crush size
Sample composition
Historical column heap leach test work commissioned by IPBX
at CIMM Laboratories in Antofagasta, Chile.
▪ Historical column test work performed on 3 samples of
the oxidized metasediments collected from trenches in
the vicinity of 4 drillholes and varying in weight from 105
to 166kg. All samples were subjected to simple column
tests using 5% dilute sulfuric acid over a 48-hour
period on mineralized rock crushed to 100% passing ½”
in columns 1m high and 6” wide.
▪ The metallurgical results obtained in the column tests
returned Cu extractions of between 72.39 and 82.22%.
▪ Other favourable project development factors at the CCP
consist of its modest altitude and ease of site
accessibility using major road networks, proximity to
grid power and other infrastructure.
INVESTOR PRESENTATION
Column 1
▪ These Heap-Leach results will be the basis for
confirmatory work conducted on oxide ore post the
Maiden Drill Campaign completion.
14
Shallow sulphide opportunity
Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Higher Grade Intersections
Higher grade sulphide intervals below the Carmen NI 43-101 MRE;
INVESTOR PRESENTATION
TAB 031 – Flow banded metasediment containing mainly of Cu sulphides (chalcopyrite) and minor pyrite1
TAB 83: 69m @ 1.37% Cu (from 43m), incl. 24m @ 2.15% Cu & 14m @ 1.77% Cu
TAB 031: 52m @ 0.92% Cu (from 66m)
TAB 01A: 28m @ 1.46% Cu (from 136m), incl. 14m @ 2.27% Cu
▪ Historical Drill intercepts were not assayed for precious metals
▪ 4 significant large geophysical targets identified at depth
1.
The assay grade represented in the image are from the 2m composite half-core sample interval submitted to ALS-Chemex Coquimbo, Chile. Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Significant Intersections.
15
Maiden Drill
Campaign Progress
ASX:NFL
norfolkmetals.com.au
Maiden drill campaign
Drilling Matrix – 50 Proposed Collars
Oxide Targeted RC & DD Holes
20 drill holes with 71m average target depth
INVESTOR PRESENTATION
Oxide/Sulphide Targeted RC Holes
1 drill hole with 90m targeted depth
Oxide/Sulphide Targeted DD Holes
1 drill hole with 225m targeted depth
Oxide/Sulphide Twinning RC & DD Holes
4 drill holes with 59m average target depth
Stepout RC & DD Holes
21 drill holes with 77m average target depth
Scout Sulphide Target DD Holes
4 drill holes with 400m average target depth
17
Carmen Copper Project – Initial RC Drilling Phase inside Blue Oval
Corporate snapshot
Top 20 own ~43% of
shares on issue,
697 shareholders
(as at 29th August
2025)
Transformational
earn in commenced
in prime commodity
and jurisdiction with
favourable deal terms
Tight capital
structure leveraged
for exploration and
development
success
Pro Forma Capital Structure (ASX: NFL)
INVESTOR PRESENTATION
Share Price (Last trade 29th August 2025)
$0.18
Proposed Shares to be issued post Sept 2025 EGM3
14,989,767
Shares on issue
65,051,165
Proposed Options1
27,089,808
Market capitalisation (undiluted)
$14,407,368
Cash2, 3
$5,394,000
Enterprise value (EV)2, 3
$9,013,368
1. Options on issue at strike prices ranging from 20c to 30c and expiry dates ranging 29/06/2026 to 14/3/2027. Total includes 3,500,000 options to
Lead Manager of raise and 2,100,000 options to Norfolk board yet to be issued and subject to shareholder approval at September 2025 EGM
2. June 30th 2025 Quarterly Report of $2,104,000 plus proposed capial raise of $3,500,000 minus costs of the offer
3. Firm commitments for placement of $3.5m announced 28th July
18
Carmen Cu Project Old workings along dominant structural
corridors trending NE 050° and NNW 340°
Key messages & value proposition
(https://www.mining-technology.com/marketdata/five-largest-copper-mines-chile/?cf-view)
(https://discoveryalert.com.au/news/chile-copper-production-record-2025-global-impact/)
2. Strong development potential with a proven team
Historical shallow resource (refer to Annexure A) over ~5% of mineralised strike open in all directions with
oxide ore metallurgy and other project characteristics conducive to low cap-ex heap leaching methodology.
The Transcendence Mining team bring an experienced resource and project development team with incountry experience. The sulphide mineralisation potential below the oxide cap provides significant upside.
INVESTOR PRESENTATION
1. Copper and Chile is the right commodity at the right address
Chile is the world leader in copper production and known deposits. More than 60 copper mines in Chile with
more than 2 dozen heap leach operations providing a proven platform for Norfolk objectives at the Carmen
Copper Project.
3. Company is fully funded and moving fast
The maiden drilling campaign is underway with drilling and exploration activities fully funded for the
remainder of 2025 with assay results and steady news flow expected.
19
Thank you
Contact:
Phone: +61 8 6255 8625
Email: info@norfolkmetals.com.au
Web: www.norfolkmetals.com.au
ASX:NFL
norfolkmetals.com.au
Annexure A - NI 43-101 - Mineral Resources and Reserves
Carmen NI 43-101 MRE
Oxide Zone
Resource
Classification
-
Copper
grade (%)
Contained
Metal
-
Indicated
1,827.80
0.59
1078.40
Total
Measured and
1,827.80
0.59
1078.40
Indicated
Inferred
836.1
0.59
493.30
Total
2,663.90
0.59
1,571.70
Resources
Note: reported at a cut-off grade of 0.2% Cu, not capped
Tonnage Copper grade
(kilotonnes)
(%)
-
Total Resource (Oxide+Secondary)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
-
-
Contained
Metal
1,742.60
0.7
1219.82
3,570.40
0.64
2298.22
1,742.60
0.7
1219.82
3,570.40
0.64
2,298.22
1,191.90
0.49
584.03
2,028.00
0.53
1077.33
2,934.50
0.61
1803.85
5,598.40
0.60
3,375.55
INVESTOR PRESENTATION
Measured
Tonnage
(kilotonnes)
Secondary Enrichment
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January 2027 (Carmen NI 43-101
MRE).
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding the Carmen NI 43-101 MRE shown in Table 1:
•
•
•
the Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
a competent person has not done sufficient work to classify the foreign estimate as a mineral resources in accordance with the JORC Code; and
it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to be reported as mineral resources in accordance
with the JORC Code.
21
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
22
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
23
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
24
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
25
Annexure B - Transcendence Mining - previous project involvement
Carmen Copper Operators – project experience matrix
Project
Status
Nickel
Producing
Acid, Iron, Copper, Gold
Producing
Wetar Copper Heap Leach (lndo)
Copper
Producing
Tujuh Bukit Gold Heap Leach (lndo)
Gold
Producing
Tujuh Buikt Copper (lndo)
Copper
Feasibility
Pani (lndo)
Gold
Construction
King of the Hills (AUS/WA)
Gold
Producing
Lake Cowal Gold Mine (AUS/NSW)
Gold
Producing
North Mara (Tanz)
Gold
Producing
Copper (Au)
Producing
Kanowna Belle Gold Mine (AUS/WA)
Gold
Producing
San Gregorio (Uruguay)
Gold
Producing
SCM Nickel Mine (lndo)
Acid Iron and Metals (lndo)
Palabora Copper (South Africa)
Exploration
Feasibility
Development
Financing
INVESTOR PRESENTATION
Commodity
26
Annexure C - Carmen Cu Project Historical Drill Holes – Significant Intersections
Minimum intercept width 4m, except for over known veins Intercepts calculated using 0.2% Cu cutoff and allowing up to 4m of internal waste
Coordinates based on WGS84, UTM zone 19S
RL is taken from best fit to EOS surface
Hole_ID
Easting
Dip
Azim
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CMM 1
CMM 2
CMM 3
CMM 4
CMM 4
CMM 5
CMM 6
CMM 6
CMM 7
CMM 8
CMM 9
CMM 10
CMM 11
CMM 11
CMM 12
CMM 12
CMM 13
CMM 14
CMM 15B
CMM 16B
CMM 16B
CMM 17
CMM 18
CMM 19
CMM 20
CMM 21
CMM 22B
CMM 23
CMM 24
CMM 24
CMM 25
CMM 25
CMM 26
CMM 27
CMM 27
CMM 29
CMM 30
CMM 31
CMM 31
CMM 34
CMM 35
CMM 36
CMM 36
CMM 37
CMM 38
CMM 39
CMM 39
CMM 40
363356
363379
363301
363371
Northing RL_Terrain
6826850
6826875
6826890
6826805
2020
2018
2031
2029
-90
-90
-45
-90
0
0
315
0
Total Depth (m) From (m)
35
46
26
36
363416
363496
6826800
6826855
2031
2007
-90
-90
0
0
42
76
363511
363546
363576
363616
363601
6826880
6826880
6826940
6826925
6826895
2004
2004
2003
1996
2003
-60
-60
-55
-60
-60
45
50
75
170
160
43
24.5
23.1
14
31
363561
6826855
2012
-60
155
29
363546
363466
363541
363581
6826855
6826750
6826760
6826765
2009
2041
2043
2054
-60
-90
-60
-60
155
0
105
135
16.3
29.1
17
32
363601
363606
363616
363581
363596
363601
363571
363601
6826735
6826775
6826770
6826815
6826840
6826790
6826835
6826685
2065
2053
2056
2032
2021
2047
2021
2078
-90
-60
-90
-90
-60
-90
-90
-90
0
170
0
0
95
0
0
0
28
26
15
31
16
16
33
41
363571
6826920
2002
-90
0
41
363341
363276
6826870
6826895
2023
2035
-90
-90
0
0
33
44
363536
363406
363386
6826600
6826650
6826725
2086
2069
2054
-90
-90
-90
0
0
0
23
16.1
37
363821
364001
363916
6827030
6827045
6827115
2025
2083
2073
-60
-55
-90
135
135
0
23
39
36
363951
363971
363896
6827125
6827155
6827155
2084
2086
2079
-90
-90
-90
0
0
0
35
22
33
363876
6827000
2025
-90
0
31
0
0
0
0
29.1
0
2
73
0
0
0
0
0
12
0
15
0
0
2.2
0
28
0
0
0
0
0
0
0
0
23
0
25
0
0
23
0
0
0
29
0
0
0
33
0
0
0
28
0
To (m)
35
46
26
29.1
36
42
73
76
43
24.5
23.1
12.3
12
31
6.2
29
16.3
28
17
28
32
28
23
12
31
16
16
33
23
41
25
41
33
23
44
15
16.1
29
37
23
39
33
36
35
22
28
33
31
Width (m) Cu Tot% Cu (Sol)%
35
46
26
29.1
6.9
42
71
3
43
24.5
23.1
12.3
12
19
6.2
14
16.3
28
14.8
28
4
28
23
12
31
16
16
33
23
18
25
16
33
23
21
15
16.1
29
8
23
39
33
3
35
22
28
5
31
0.97
1.37
2.02
1.39
0.73
1.50
1.15
0.78
1.37
1.19
1.89
0.77
0.95
1.33
2.45
0.73
2.03
1.09
1.01
1.15
0.66
1.45
0.75
0.45
1.57
0.50
0.82
1.40
0.85
0.63
0.66
0.99
1.80
1.78
0.89
0.76
0.21
1.25
0.73
0.39
1.48
0.93
1.10
1.07
0.65
0.94
0.65
1.00
0.90
1.27
1.87
1.29
0.68
1.39
1.06
0.72
1.27
1.11
1.75
0.71
0.88
1.23
2.27
0.68
1.88
1.01
0.93
1.06
0.61
1.35
0.69
0.42
1.45
0.46
0.76
1.30
0.78
0.58
0.61
0.91
1.67
1.65
0.82
0.70
0.19
1.16
0.68
0.36
1.37
0.86
1.02
0.99
0.60
0.87
0.60
0.92
Description
OXIDE + LEACHED
OXIDE
OXIDE
OXIDE + LEACHED
TRACE SULPHIDE
OXIDE + LEACHED
OXIDE
TRACE SULPHIDE
OXIDE + LEACHED
OXIDE + LEACHED
OXIDE
OXIDE
OXIDE
TRACE SULPHIDE
OXIDE
OXIDE
OXIDE
OXIDE + LEACHED
OXIDE
OXIDE
TRACE SULPHIDE
OXIDE
OXIDE
OXIDE
OXIDE + LEACHED
OXIDE
OXIDE
OXIDE
OXIDE + LEACHED
SULPHIDE
OXIDE
SULPHIDE
OXIDE
OXIDE
TRACE SULPHIDE
OXIDE + LEACHED
OXIDE
OXIDE + LEACHED
TRACE SULPHIDE
OXIDE
OXIDE + LEACHED
OXIDE
TRACE SULPHIDE
OXIDE
OXIDE
OXIDE
TRACE SULPHIDE
OXIDE+ LEACHED
INVESTOR PRESENTATION
Project
Included intercepts calculated using 1.0% Cu cutoff and allowing up to 4m of internal waste
Back Calculated from Soluble Cu assuming 92% Soluble
27
Annexure C - Carmen Cu Project Historical Drill Holes – Significant Intersections
Minimum intercept width 4m, except for over known veins Intercepts calculated using 0.2% Cu cutoff and allowing up to 4m of internal waste
Coordinates based on WGS84, UTM zone 19S
RL is taken from best fit to EOS surface
Hole_ID
Easting
Dip
Azim
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
TABACO
TABACO
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARM
Share your feedback
Discover