QUARTERLY ACTIVITIES REPORT
FOR THE QUARTER ENDED 31 MARCH 2024
Date: 30 April 2024
ASX Code: NFL
Norfolk Metals Limited (ASX:NFL) (Norfolk or the Company) is pleased to report on
its activities during the 3-month period ended 31 March 2024.
Capital Structure
Ordinary Shares: 40,915,932
Unlisted Options: 9,590,000
Listed Options: 10,999,808
Performance Shares: 1,400,000
Current Share Price: 14.5c
Market Capitalisation: $5.93m
Cash: $2.91m (31 Mar 2024)
Debt: Nil
Directors
Ben Phillips
Executive Chairman
ORROROO URANIUM PROJECT
• Maiden drill campaign completed successfully delineating uranium in 10 of
17 holes drilled
•
Exploration continuing with land access engagements, geophysics and
subsequent drill program(s) planning in progress
•
Additional permit EL6948 granted expanding project area to 723km² total of
100% owned exploration tenure
ROGER RIVER GOLD PROJECT
• Soil study completed with successful reanalysis of historical samples
Leo Pilapil
Technical Director
Patrick Holywell
Non-Executive Director
Arron Canicais
Company Secretary
CORPORATE UPDATE (including activities subsequent to quarterly period end)
• Exclusivity and due diligence deed executed for Las Alteras uranium project
in Argentina
•
Contact Details
Unit 10,
85-87 Forrest Street
Cottesloe WA 6011
Strong financial position with $2.91m cash at March 2024 quarter end which
was increased subsequently through a strategic placement of $415,746
Phone: +61 8 6255 8625
norfolkmetals.com.au
Orroroo Uranium Project, South Australia
Norfolk Metals Ltd (Norfolk or the Company) is pleased to advise the maiden drill program
was completed with a further 5 holes drilled across EL6552 being drilled in Phase 2 of the
program in January 2024, taking the total number of holes completed in the maiden
program to seventeen (17) (Figure 1). Phase 2 of the program sought to test the
palaeochannel model at the Wongway Creek Target (formerly Target 1) where suitable drill
access was available. A total of three (3) holes were drilled along the river traverse of the
Wongway Creek Target testing both upstream and downstream regions. One (1) hole was
drilled downstream of the No Name Creek Target (formerly Target 3) as well as the Rankin
Rd Target (formerly Target 4). The completion of the maiden drill program has successfully
delineated uranium in ten (10) of the seventeen (17) holes providing data for the Company
to further develop a geological model of the Walloway Basin (Figure 3). Most importantly,
the interpreted uranium bearing floodplain intersected upstream of Wongway Creek gives
Norfolk confidence in the palaeochannel model and future exploration efforts can be
planned accordingly. Peak grade of 796ppm pU308 was intersected in ORMR007.
*peak grade(s) noted are the direct detection of pU308 over a 0.02m interval by Prompt Fission Neutron
downhole logging within a composite intersection with a cut-off grade greater than 100ppm pU308.
Norfolk Metals Limited I ABN: 38 652 438 385
1
www.norfolkmetals.com.au
ASX:NFL
Figure 1. All drill collars completed in maiden drill program with Section A-A reference for Figure 3
Floodplain Interpretation
The pre-drilling model was targeting the presence of prospective palaeochannels
approximately 100 to 150 metres to the south of the modern-day creeks associated with
uranium intersected in historical Linc Energy Wells. Drilling results from Phase 1 indicated that
the uranium in the Linc Energy Wells appeared to be associated with a secondary
permeability created by downward displacement of the sediments resulting from basement
faulting or soft sediment deformation. Phase 2 drilling continued to test the targeted
prospective palaeochannels located to the south of the modern-day creeks at closer than
expected distance of 50m. Younger palaeochannels were seen south of the modern-day
creeks in ORMR004 (Walloway Creek Target) and ORMR016 (Rankin Rd Target) at the base
of the regolith. This further supports the model of palaeochannels occurring south of the
modern-day creeks due to a change in regional slope.
Drillhole ORMR015A was drilled 50m south of the modern-day creek at Wongway Creek
Target. Drilling upstream from previous holes enabled easier location of the targeted
prospective and potentially wider palaeochannel. This hole encountered what appears to
be a silt dominated floodplain with minor gravel and two elevated gamma anomalies
signifying uranium towards the top of this unit as well as the base of this unit (Figure 2). This
unit appears to be the middle section of a palaeochannel between the sand and gravel
dominated incising part of a palaeochannel and the clay dominated edge of a floodplain.
Norfolk Metals Limited I ABN: 38 652 438 385
2
www.norfolkmetals.com.au
ASX:NFL
Figure 2: Wongway Creek Target cross section with interpreted floodplain and associated gamma
spikes delineating uranium
Most importantly, this interpreted floodplain unit was seen directly below a kaolinitic clay
marker bed (10m thick on average) which is located in all drillholes across the Walloway
Basin. The kaolinitic clay unit appears to be a transitional unit from deepwater lake sediments
to an exposure surface where the water has evaporated and kaolinite is able to precipitate
at the surface under sub-tropical conditions (Figure 3). Above this marker bed is further deepwater lake type sediments. If there was to be a time period where a palaeochannel was
able to form in the Walloway Basin it would potentially be directly below the kaolinite clay
marker bed as was seen in ORMR015A. Drillhole ORMR017 was drilled 70m north-west from
ORMR015A with the aim of intersecting the incising part of the palaeochannel. A deep
incising palaeochannels was not intersected however, an elevated gamma response
around 132 metres depth coincided with the top of the floodplain in ORMR015A suggesting
that the palaeochannel is possibly located within metres of the targeted region.
Norfolk Metals Limited I ABN: 38 652 438 385
3
www.norfolkmetals.com.au
ASX:NFL
Figure 3: Orroroo Project Regional Cross Section
*Please note that some drill holes deliberately omitted for illustration only (scale)
Continued Exploration Throughout 2024
The completion and interpretation of the maiden drill program at Orroroo has further
increased the understanding and potential of the project while providing valuable data
along with additional district scale targets concluding the below:
•
Orroroo project value proposition as a potential new uranium district known as the
Walloway Basin in Australia's favoured uranium state has been further proven and
de-risked;
•
Norfolk has embarked on the future planning and approvals for Orroroo with a focus
on the potential close proximity of a uranium-bearing floodplains to the floodplain
interpreted near the Wongway target while remaining aware of the district scale
opportunities; and,
•
Future planning using various geophysical techniques and stakeholder
engagements will endeavour to ensure flexibility in follow-up drill program(s).
Norfolk Metals Limited I ABN: 38 652 438 385
4
www.norfolkmetals.com.au
ASX:NFL
Roger River Gold/Copper Project, Tasmania
Norfolk completed a soil program at the Roger River Project (Tasmania) to obtain a better
understanding of the copper and gold mineralisation to guide the next exploration phase
and potential drilling. The program focus was to provide a lateral vector or a possible surface
trend or strike to the native copper (Cu) mineralization intersected in hole 22RRD-001 at
Anomaly 2 (A2). The soil program consisted of new surface samples and the re-analyses of
selected historical samples (not previously sampled for Cu) being submitted for Cu (multielements) analysis.
New surface samples were collected on a 200 x 100m grid around A2 with a total of 98
samples collected covering an area of approximately 1.2km x 1.5km over the interpreted
splay from the Roger River Fault. The results revealed a maximum of 11 ppb for gold (Au),
221ppm for copper (Cu) and 35 ppm for arsenic (As). Gridding and plotting of both gold
and arsenic results revealed linear anomalies that are coincident with the interpreted main
structures (splays) considered as potential conduits for the mineralizing fluids in the Roger
River epithermal system (Figure 4).
Figure 4: Soil study new and historical sample locations
Norfolk Metals Limited I ABN: 38 652 438 385
5
www.norfolkmetals.com.au
ASX:NFL
The re-analysis program involved selecting preferred historical soil samples for the entire
EL20/2020 tenement. The samples were attained from the Mineral Resources Tasmania (MRT)
storage Facility in Hobart. The sample locations were selectively chosen over the Roger River
Fault (RRF) and along possible interpreted splays off the RRF. The samples were re-analysed
for Cu and other multi-elements. In all, the Company submitted 148 pulp soil samples for
multi-element analyses to ALS in Burnie, Tasmania. The results show a continuous Cu anomaly
around A4 and A5 prospects located along the interpreted fault splay from the RRF (Figure
5). This anomaly trend has coincident lead (Pb), zinc (Zn) and molybdenum (Mo) anomalies.
The RRF also shows a strong continuous As anomaly over the 4km strike length (Figure 6).
Gold mineralisation is mainly associated with iron and arsenic minerals such as pyrite and
arsenopyrite. During the oxidation process the arsenic is the more mobile element, moves
further away from the source and therefore becomes a useful geochemical pathfinder for
gold mineralization
Figure 5: Cu soil contour with the interpreted splays
Norfolk Metals Limited I ABN: 38 652 438 385
6
www.norfolkmetals.com.au
ASX:NFL
Figure 6: As soil contour with continuous anomaly over the RRF structure
Corporate Update
Resource references:
¹Meseta Central
https://www.uramerica.co.uk/assets
NI43-101 Technical Report for a Mineral Resource Estimate (‘MRE’) totalling 27.9 million tonnes with an average grade of 310 ppm
eU3O8 for a contained 19.1M lb of eU3O8 using a cut- off grade of 200 ppm
Norfolk Metals Limited I ABN: 38 652 438 385
7
www.norfolkmetals.com.au
ASX:NFL
²Cerro Solo
https://unece.org/DAM/energy/images/UNFC_Reserv/publications/1919051_E_ECE_ENERGY_109_WEB.pdf
4,420 tU ≤ USD 130/kgU
³Laguna Salada
https://www.isoenergy.ca/portfolio/argentina/laguna-salada
NI43-101 10.1m lbs U308 Indicated 6.3M lbs & Inferred 3.8M lb
*Cautionary Statement: the estimate of mineralisation in respect of Meseta Central (NI 43-101), Cerro Solo (NEA/IAEA) and Laguna
Salada³ (NI 43-101), reported in this announcement are “foreign estimates” for the purposes of the ASX Listing Rules, and
accordingly: the estimate is not reported in accordance with the JORC Code; a competent person has not done sufficient work
to classify the foreign estimates as mineral resources or ore reserves in accordance with the JORC Code; and it is uncertain that
following evaluation and/or further exploration work that the foreign estimates will be able to be reported as mineral resources or
ore reserves in accordance with the JORC Code. In relation to Cerro Solo deposit the conversion of 4,420 tU to U308 in lbs is as per
1 MT U in U3O8 = 2,599.79 lbs. U3O8; please see conversion table via: https://www.uranium.info/unit_conversion_table.php
See Classification of Uranium Resources by IAEA here: https://www-pub.iaea.org/MTCD/Publications/PDF/te_1035_prn.pdf
Subsequently to the reporting period Norfolk executed an Exclusivity and Due Diligence
Deed with Green Shift Commodities Ltd (GCOM), a company incorporated in Canada, to
acquire 100% of the Las Alteras uranium project in Chubut, Argentina (Las Alteras). The
successful acquisition will position Norfolk as a multinational, multi-project uranium
exploration company. This is an important step towards Norfolk’s plans to accumulate high
value exploration projects in proven regions while maintaining a favourable company
structure and cash reserves.
Las Alteras uranium project is surrounded by non-JORC foreign estimates* at URAmerica’s
Meseta Central deposit (19.1Mlbs eU308¹), CNEA’s Cerro Solo deposit (11.49Mlbs U308²), ISO
Energy’s Laguna Salada deposit (10.1Mlbs U308³) along with the Cerro Condor and Los
Adobes historical uranium mines. As the uranium market continues to evolve globally, it is
Norfolk’s view that the Chubut region of the San Jorge Basin hosting the renowned
government owned Cerro Solo deposit presents an exceptional opportunity to diversify and
grow the Company. The addition of the Las Alteras project suite will allow Norfolk to progress
the appointment of Key Management Personnel and advisors.
Please see the Company presentation regarding the Las Alteras uranium project released
on the ASX on the 18th of April 2024.
Subsequent to the reporting period, Norfolk has also completed a placement to strategic
professional and sophisticated investors to raise $415,746.45 (before costs) through the issue
of 2,771,643 fully paid ordinary shares (New Shares) at an issue price of A$0.15 per New Share
under capacity of Listing Rule 7.1.
The cash flows relating to the quarter included $515k in exploration and evaluation spend
on the Company’s Roger River and Orroroo projects and $112k in staff and admin costs
managing the corporate requirements of the Company.
The Company had a closing cash balance of $2.91 million.
For the purposes of section 6 of the Appendix 5B, all payments made to related parties are
for director and consulting fees.
Norfolk Metals Limited I ABN: 38 652 438 385
8
www.norfolkmetals.com.au
ASX:NFL
Tenement Status
The Company confirms that all of its tenements remain in good standing. The Company has
not disposed of any tenements during the quarter.
Tenement
ID
EL20/2020
Holder/Applicant
Roger River Resources Pty Ltd
Interest
(%)
100%
EL17/2021
Roger River Resources Pty Ltd
100%
EL6552
Black Lake Pty Ltd
100%
EL6814
Black Lake Pty Ltd
100%
EL6948
Black Lake Pty Ltd
100%
Norfolk Metals Limited I ABN: 38 652 438 385
9
www.norfolkmetals.com.au
ASX:NFL
END
This announcement has been authorized by the board of directors of Norfolk.
About Norfolk Metals
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814
and EL6948, which together cover 723km2, located approximately 274km northwest of the
capital city of Adelaide, South Australia within the Walloway Basin, which is an elongate
Tertiary Basin approximately 50km long and up to 15km wide. It consists of Tertiary and
Quaternary sediments unconformably underlain by Adelaidian basement.
The Roger River Project comprises two granted exploration licenses, EL20/2020, and
EL17/2021, which together cover 261km2, located 410km northwest of the capital city of
Hobart, Tasmania. The Project is prospective for gold and copper as indicated by the intense
silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault
along with carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au.
Competent Persons Statement
The information in this announcement that relates to exploration results, is based on, and
fairly represents, information and supporting documentation prepared by Mr Leo Pilapil, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy.
Norfolk Metals Limited I ABN: 38 652 438 385
10
www.norfolkmetals.com.au
ASX:NFL
Mr Pilapil has a minimum of five years’ experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore
Reserves Committee Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Pilapil is a related party of the Company, being the
Technical Director, and holds securities in the Company. Mr Pilapil has consented to the
inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Norfolk Metals Limited I ABN: 38 652 438 385
11
www.norfolkmetals.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Norfolk Metals Limited
ABN
Quarter ended (“current quarter”)
38 652 438 385
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(52)
(169)
(e) administration and corporate costs
(60)
(354)
-
-
15
78
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(97)
(445)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(515)
(886)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
33
33
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(482)
(853)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
1,110
(c) property, plant and equipment
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(106)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material) –
receipt/payment of insurance funding facility
-
(8)
3.10
Net cash from / (used in) financing
activities
-
996
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,487
3,210
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(97)
(445)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(482)
(853)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
996
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
2,908
2,908
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
658
1,237
5.2
Call deposits
2,250
2,250
5.3
Bank overdrafts
-
-
5.4
Other (Corporate Credit Card)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,908
3,487
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
24
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(97)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(515)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(612)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,908
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2,908
4.75
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Not applicable
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Not applicable
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Not applicable
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 April 2024
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover