RC assays confirm Carmen Copper shallow mineralisation
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX:NFL 11th
December 2025
RC assays confirm Carmen Copper shallow mineralisation
Norfolk releases first assays from Maiden Drill Campaign targeting
the significant resource potential of the Carmen Copper Project, Chile
HIGHER GRADE DRILLING INTERSECTIONS INCLUDE:
• CCRC-25-030 - 53m (46m TW#
) @ 1.1% Cu from 62m; incl. 4m @ 1.3% Cu from 64m, and 13m
@ 1.9% Cu from 85m; incl. 4m @ 2.8% Cu from 85m, and 13m @ 1.6% Cu from 100m
• CCRC-25-027 - 17m (13.7m TW) @ 0.9% Cu from 14m; incl. 3m @ 1.4% Cu from 16m and 5m @
1.5% Cu from 24m
• CCRC-25-020 - 22m (19.2m TW) @ 0.5% Cu from 0m; incl. 6m @ 1.0% Cu from 12m
• CCRC-25-031 - 13m (11.9m TW) @ 0.6% Cu from 76m; incl. 5m @ 1.3% Cu
• CCRC-25-028 - 9m (7.7m TW) @ 0.6% Cu from 18m; incl. 4m @ 0.9% Cu from 23m
• CCRC-25-029 - 4m (3.2m TW) @ 1.5% Cu from 15m; incl. 3m @ 1.8% Cu from 15m
• Current assays received for the RC (Phase #1) drilling program (including CCRC-25-030 and CCRC-25-
031) confirm the shallow presence of Cu Oxide and primary Cu Sulphide mineralisation within the
Carmen Main area reinforcing the potential for JORC compliant copper resource.
• The RC (Phase #1) drilling program consisting of 37 drill holes has been completed; the rig has been
successfully demobilised with no safety issues or accidents to report.
• This announcement includes partial assay results from Phase #1 with further results pending. The
assays for the final 6 holes are yet to be received with results expected in January 2026
• Approximately 1,000m of historical DDH core displaying mineralisation has been quarter-cut and
submitted for assay analysis with results also expected back in January 2026. This mineralised core will
be critical in the Company ability to model and report a JORC compliant resource in the near future.
The Project hosts a historical copper oxide mineral resource estimate of 5.6Mt at 0.6% Cu reported
in accordance with Canadian National Instrument 43-101 (Carmen NI 43-101 MRE).1 2
• Step out drilling in the NNW hanging wall of the Carmen Tabaco Thrust Complex has indicated the
potential for resource expansion outside the known mineralised Carmen Main area.
• Exploration work in the SSE footwall has given new insights into the geological characteristics of the
project area, including clarification of host rock units and structural controls for the deposit. This will
enhance targeting of potential extensions to known Carmen mineralisation and future drill planning.
• The Diamond Program (Phase #2) will proceed following the completion of further field mapping and
#
True width(s) (TW) have been calculated using method as outlined in“Orientation of data in relation to geological structure”in JORC Table 1
at rear of announcement.
1
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January
2007 (Carmen NI 43-101 MRE).
2
This is a foreign estimate not reported in accordance with the JORC Code. The supporting information required by Listing Rule 5.12 was first
disclosed to ASX on 31 March 2025 and has not materially changed. The Carmen NI 43-101 mineral resource estimate is a foreign estimate
and is not reported in accordance with the JORC Code. A Competent Person has not yet undertaken work to classify the foreign estimate as a
Mineral Resource in accordance with the JORC Code. It is uncertain whether further evaluation will result in the estimate being able to be
reported as a Mineral Resource under the JORC Code. It is uncertain that following evaluation and further exploration work that the foreign
estimates will be able to be reported as Mineral Resources in accordance with the provisions of the JORC Code.
2
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
drill target refinement once the complete results of Phase #1 have been received and interpreted.3
• In addition to the step out drilling, several exciting regional IP and geochemical anomalies remain
untested.
Norfolk Chairman Ben Phillips commented “These initial results from the Maiden Drill Campaign at Carmen
confirm the highly prospective nature of this project in conjunction with the shallow mineralisation. We have some
very strong results validating the copper oxide zone within the historical resource area while also showing
significant grade tenor and continuity in sulphides, which are starting as shallow as 50m from beneath the oxide
surface blanket. The additional assays for the 6 RC holes and circa 1,000m of historical diamond core yet to be
received are expected to further our understanding of the mineralisation and allow the team to prepare an
optimised diamond drilling plan for 2026.”
InvestorHub
Investors are also encouraged to join and engage through the Norfolk Metals InvestorHub, post questions and
feedback through the Q&A function accompanying each piece of content, and engage directly with the Norfolk
team.
Maiden Drill Campaign
Phase #1 of the 2025 Maiden Drill Campaign has been completed with 37 RC holes drilled totalling 3,401m. There
are 6 holes (5 from Carmen Main and 1 from the Higueritas Prospect) that are awaiting assay results, expected in
January 2026 (Figure 1).
Image 1: Carmen Cu Project Carmen CCRC-25-033 vertical hole on 10,000mNE section
3
Statements regarding exploration potential, mineralisation trends and future drilling outcomes are forward-looking and subject to
geological and operational risks.
3
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Approximately 20 Diamond Drill Holes (DDH) totalling up to 2,380m are in planning to follow the RC drilling as
Phase #2 of the Maiden Drill Campaign. Interim field mapping planned for early 2026 will assist to refine the final
Phase #2 component of the Maiden Drill Campaign. (Figure 1).
The Maiden Drill Campaign at the Carmen Copper Project was planned to focus on three main objectives. These
objectives were:
1. Validate Copper Oxide Zone (COZ) mineralisation contained within the historic Carmen NI 43-101 MRE
by twinning historical drill holes and local shallow infill drilling.
2. Explore the vertical potential for Cu Sulphide mineralisation of the Carmen NI 43-101 MRE within the
COZ deeper in section along the Carmen Tabaco Thrust (CT Thrust).
3. Step out drilling on the periphery of the historic Carmen NI 43-101 MRE to explore for Cu Oxide
mineralisation to the NE and NW in the Hanging wall of the CT Thrust as well as to the SE and SW in the
Footwall of the CT Thrust.
Figure 1: Carmen Cu Project Carmen Main Maiden Drill Campaign RC Phase #1
The Company confirms that it has not excluded any material information relating to the exploration results.
4
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Results To Date4
Phase #1 RC drilling has been completed and the company can confirm that initial drilling (twinning and infill)
within the Carmen Main area has been successful in intercepting both Cu Oxide at shallow levels and Cu Sulphide
mineralisation deeper in section within the historical Carmen NI 43-101 MRE limits. The drilling has been
successful in identifying upside potential for Cu Oxide mineralisation hosted in meta-sediments higher in section
typically between surface and 45m depth to the NE and NW of the CT Thrust within in the Hanging wall of the
system over 400m to the west and along strike to the NE and SW over approximately 500m.
In line with the drilling objectives, the results to date suggest the following:
1. Selected twin holes showed reasonable correlation with the historical IPBX holes (Table 1)
Section Line NFL Drill Hole Intersection IPBX Hole Intersection
10,000NE CCRC-25-030 53m @ 1.13 % Cu TAB-031 50m @ 0.92 Cu
10,200NE CCRC-25-028 9m @ 0.63 % Cu TAB-040 8.25m @ 0.53 Cu
10,550NE CCRC-25-027 17m @ 0.89 % Cu TAB-055B 19m @ 0.94 Cu
10,350NE CCRC-25-036 Results are pending TAB-067 12m @ 0.79 Cu
Table 1: Results comparison of twin holes
Historical TAB-series drill results are sourced from the NI 43-101 technical report prepared
by SRK Consulting (25 January 2007).
Twinning of several historic diamond drill holes and additional exploration infill drilling concentrated along the near
Hanging wall of the CT Thrust between Sections 10000NE and 10650NE has resulted in a positive validation of
historic Cu Oxide intercepts at shallower depths, as well as confirmation of important Cu Sulphide mineralisation
deeper in section.
The RC (Phase #1) drill campaign concentrated on the near Hanging Wall across more than 700m of strike in an
attempt to accurately definethe CT Thrust Fault plane as well as the sub-parallel Carmen and Tabaco Fault planes.
Drilling to date, as well as preliminary structural mapping and initial analysis has suggested that these fault
structures and other secondary NNW, N/S, and NNE striking faults are likely part of a complex structurally
controlled mineralisation along the CT Thrust.
2. Deeper RC holes on section 10,000mNE (Figure 2) confirmed Cu sulphide potential at depth
Significant intercepts of Cu Oxide mineralisation are typical from surface to 40-45m depth with Cu Sulphide
mineralisation starting from 45m depth and below. The deeper RC drilling on the 10,000mNE section confirmed
the potential of Cu sulphide mineralisation with wide mineralisation intersected at depth (Figure 2). The
mineralisation is open at depth and will be a prime target for the Phase #2 diamond drilling program.
Drill holes CCRC-25-030, and CCRC-25-031, were drilled on and slightly off Section line 10,000NE. The two drill
holes were drilled to test Cu Oxide mineralisation associated with meta-sediments higher in section in the Hanging
wall of the CT Thrust and Cu Sulphide mineralisation along the Hanging wall contact, as well as a N/S striking
structure within the immediate Hanging wall of the CT Thrust in the SW sector of Carmen Main
Drill hole CCRC-25-033 was drilled vertically as partial infill and confirm the mineralisation between holes TAB
01A (historical hole) and CCRC-25-030. The hole intersected strong mineralisation (Image 1) and is awaiting
assays.
4
The information in this announcement that relates to exploration results, is based on, and fairly represents, information and supporting
documentation prepared by Mr Leo Pilapil, a competent person who is a member of the Australasian Institute of Mining and Metallurgy. Mr
Pilapil has a minimum of five years’ experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore Reserves Committee
Australasian Code for Reporting of Exploration Results, MineralResources and Ore Reserves.Mr Pilapil is a related party of the Company, being
the Technical Director, and holds securities in the Company. Mr Pilapil has consented to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
5
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 2: Carmen Main Section 10,000mNE
3. Step Out Drilling confirms further investigation required
Several holes were drilled along the hangingwall and footwall of Carmen Main. The four holes drilled in the Carmen
West Hangingwall area were successful in intersecting anomalous Cu Oxide mineralisation from surface that
requires further ground investigation and follow-up drilling (see Appendix A).
Holes drilled in the footwall andesites, targeting historical soil anomalies, returned low-grade mineralisation that
did not meet the Company’s reporting thresholds. Follow-up work has been proposed next year to determine the
source of the anomalies and likely relevance to and potential copper ore deposits. A more detailed compilation of
the results will be compiled in the next announcement when all results from ALS have been received.
The table of higher-grade intersections has been included in Appendix of the JORC Table.
Subsequent work streams at Carmen Copper
In parallel with the recently completed RC drilling program at the Carmen Copper Project, Norfolk has been
progressing other project related workstreams in planning for potential future delineation of a JORC complaint
resource. Should an economically viable JORC compliant resource be defined; this will likely require additional
drilling permits, environmental approvals and a subsequent industrial water supply for the proposed potential
heap leach processing operations as previously highlighted in ASX news releases (31st March 2025 - Norfolk to
earn-into Chilean Copper Project). Norfolk will update the market on these workstreams in January 2026 or earlier.
6
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Carmen Copper Project
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses (Figure 4) totalling 46.6km2
. There are
multiple mineralised targets over an extensive strike length with intensive copper mineralisation from surface.
Figure 3: Carmen Cu Project Location in Huasco Province of Atacama Region in northern Chile
(See Annexure A for resource references in Figure 1)
Copper is essential for various sectors, including electric vehicles, renewable energy, and infrastructure, all of
which are seeing significant growth. Some analysts have already predicted US$12,000 per tonne this year, a price
which is almost within reach today (https://www.mining.com/copper-price-touches-new-high-as-traders-predict-12000/).
The CCP is in the Huasco Province, Atacama Region in Chile, which is currently the world's largest copper
producing nation (https://www.nasdaq.com/articles/top-10-copper-producers-country).
Only 16km to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión
is currently developing the multi-billion-dollar Relincho and Fortuna deposits (Figure 3) with proven and probable
mineral reserves classified in accordance with NI 43-101 totalling approximately 16.6 billion pounds of copper, 8.9
million ounces of gold, and 464 million pounds of molybdenum (See Annexure A and https://www.teck.com/news/news-
releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile).
Whilst the CCP currently presents as a copper oxide project with highly soluble copper oxide mineralisation from
surface; it also hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant
further investigation and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as
a low-cost, high-margin, value-accretive copper heap leaching operation producing copper cathode at the mine
gate.
7
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 4: Carmen Cu Project Concession Package consisting of 46.6km²
The Carmen-Tabaco Belt (Figure 5) is approximately 8.5km long and most Cu-Ag±Au mineralisation is spatially
related to NE/SW, N/S and NW trending structures and fractured meta-sedimentary host rocks at surface, and in
the old workings. Cu Oxide mineralisation is mainly hosted in calc-silicate altered and locally skarnified meta-
sediments and found as fracture coatings. Cu Sulphide mineralisation has been intercepted in both meta-
sediments and locally andesite host rocks in the Hanging wall of the CT Thrust, as well as in dacite porphyritic
bodies found deeper in the vertical section spatially associated with the CT Thrust plane. Cu-Sulphide
mineralisation is found as disseminated and clotty, and locally veinlet style mineralisation and includes copper +
silver ± gold mineralisation.
A younger epithermal style of quartz-sericite alteration and copper-gold locally overprints the Meta-sediments,
hornfels and hematised andesite in the vicinity of the Tabaco, Carmen and Dolores Sectors. In these areas, high-
grade poly-metallic veins & shears occur in the historic workings, which are generally 1-3m wide.
The Higueritas Belt (Figure 5) is approximately 7.5km long, from 0.5 to 1km wide and sub parallels the Carmen-
Tabaco Belt. Sporadic old workings are known from this area, but no drilling is available, with data limited to
geophysics, and some rock samples.
Locally, around Carmen area, copper is mainly hosted within a banded calc-silicate hornfels + skarn unit
containing three prominent chalcopyrite-magnetite-pyrite bands, and in epidote and calc-silicate altered
sedimentary and volcanic units. The lowermost calc-silicate band hosts most copper occurrences including the
COZ. Silicified volcanics and quartz-feldspar porphyritic rhyolite units also host significant copper locally (Figure
6).
In January 2007, SRK delivered a resource estimate in accordance with Canadian National Instrument 43-101 for
the COZ located within Carmen Main with a combined Mineral Resource Estimate (MRE) (Oxide and Secondary
Enrichment; Indicated + Inferred) of 5.6Mt at 0.6% Cu, as shown in Table 3.
8
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Table 2: Carmen NI 43-101 MRE
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in Table 2:
• The Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
• A competent person has not done sufficient work to classify the foreign estimate as a mineral resource in
accordance with the JORC Code; and
• It is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able
to be reported as mineral resources in accordance with the JORC Code.
Within the Carmen Tabaco Belt, the Carmen NI 43-101 MRE has been defined over 600m of strike, to a depth of
30m in the COZ. The Carmen NI 43-101 MRE excludes historic higher-grade drilling and covers no more than 20%
of the COZ. The COZ presents as potentially continuous between drill holes and sections along structural and
lithology-controlled zones, which are mainly sub-parallel to the Tabaco Thrust.
Figure 5: Carmen Cu Project Regional Geology
Tonnage
(kilotonnes)
Copper
grade (%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Measured - - - - - -
Indicated 1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2298.22
Total
Measured and
Indicated
1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2,298.22
Inferred 836.1 0.59 493.30 1,191.90 0.49 584.03 2,028.00 0.53 1077.33
Total
Resources
2,663.90 0.59 1,571.70 2,934.50 0.61 1803.85 5,598.40 0.60 3,375.55
Resource
Classification
Note: reported at a cut-off grade of 0.2% Cu, not capped
Oxide Zone Secondary Enrichment Total Resource (Oxide+Secondary)
9
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 6: Carmen Cu Project Local Geology
END
This announcement has been authorised for release by the Directors of Norfolk Metals Ltd
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2
. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, high-
margin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2
, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
The Roger River Project comprises the granted exploration license EL20/2020, which covers 26km2
, located 410km
northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold and copper as indicated by
the intense silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault along with
carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au
10
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Competent Person Statement
The information in this announcement that relates to exploration results, is based on, and fairly represents,
information and supporting documentation prepared by Mr Leo Pilapil, a competent person who is a member of
the Australasian Institute of Mining and Metallurgy. Mr Pilapil has a minimum of five years’ experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore Reserves Committee
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Pilapil is a related
party of the Company, being the Technical Director, and holds securities in the Company. Mr Pilapil has consented
to the inclusion in this announcement of the matters based on his information in the form and context in which it
appears.
The announcement references material from the below prior ASX releases:
31st
March 2025 - Norfolk to earn-into Chilean Copper Project
12th
May 2025 - Carmen Copper Project Maiden Drill Campaign Update
30th
October 2025 - RC Drilling Expanded and New Targets Identified
Forward Looking Statements
This announcement includes “forward looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward looking statements can be identified by the use of forward looking terminology, including,
without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”,
“goals”,“targets”,“aims”,“outlook”,“guidance”,“forecasts”,“may”,“will”,“would”,“could”or“should”or, in each
case, their negative or other variations or comparable terminology. These forward looking statements include all
matters that are not historical facts. By their nature, forward looking statements involve known and unknown risks,
uncertainties and other factors because they relate to events and depend on circumstances that may or may not
occur in the future and may be beyond the Company’s ability to control or predict which may cause the actual
results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements. Forward looking statements are based on assumptions and are not
guarantees or predictions of future performance. No representation is made that any of these statements or
projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness
or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements
may be based are reasonable. Forward looking statements speak only as at the date of this release and the
Company and its affiliates, related bodies corporate (as that term is defined in the Corporations Act) and its
directors, employees, officers, representatives, agents, partners, consultants and advisers disclaim any
obligations or undertakings to release any update of, or revisions to, any forward-looking statements in this
announcement.
Disclaimers
This announcement has been prepared by Norfolk Metals Limited (ACN 652 438 385) (the Company). The
information contained in this release is for information purposes only. This release may not be reproduced,
disseminated, quoted or referred to, in whole or in part, without the express consent of the Company. The
information contained in this release is not investment or financial product advice and is not intended to be used
as the basis for making an investment decision. Please note that, in providing this release, the Company has not
considered the objectives, financial position or needs of any particular recipient. The information contained in this
release is not a substitute for detailed investigation or analysis of any particular issue and does not purport to be
all of the information that a person would need to make an assessment of the Company or its assets. Current and
potential investors should seek independent advice before making any investment decisions in regard to the
Company or its activities.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
11
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release.
This release does not constitute an invitation, offer or recommendation to apply for or purchase securities and
does not contain any application form for securities. This release does not constitute an advertisement for an
offer or proposed offer of securities. Neither this release nor anything contained in it shall form the basis of any
contract or commitment and it is not intended to induce or solicit any person to engage in, or refrain from engaging
in, any transaction.
Compliance Statements (information required by ASX Listing Rule 5.13)
The Mineral Resource Estimate at the Carmen Copper Project is a foreign estimate prepared in accordance with
Canadian National Instrument 43-101 and is not reported in accordance with the JORC Code 2012. A competent
person has not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the
JORC Code 2012, and it is uncertain whether further evaluation and exploration will result in an estimate
reportable under the JORC Code 2012.
The Company initially announced the foreign estimate for the Carmen Copper Project on 31 March 2025 in
accordance with ASX Listing Rule 5.12. The Company confirms that the supporting information included in the
announcement of 31 March 2025 continues to apply and has not materially changed.
Norfolk confirms that it is not in possession of any new information or data relating to the foreign estimate that
materially impacts on the reliability of the estimates or the Norfolk’s ability to verify the foreign estimates as
mineral estimates in accordance with Appendix 5A (JORC Code).
It is the Company’s intention to validate the results of the foreign estimate through re-logging of historical drill
holes and completion of the proposed Maiden Drill Campaign. The results of the Maiden Drill Campaign (including
twinning of historical holes) will determine the next phase of drilling to facilitate the course towards the Company’s
aim to construct a 2012 JORC Resource estimate. In addition, it is also the intent of the Company to use the rejects
(remaining samples not sent for analysis) from the RC drilling to conduct additional metallurgical studies to
confirm the leaching results of the previous study and possibly determine a more suitable/economic leaching
strategy.
12
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Annexure A – NI 43-101 - Mineral Resources and Reserves
Fortuna (NI 43-101)
Category
Gold Copper
Tonnes (Millions)
Gold grade
(g/t)
Contained Metal
(Mozs)
Copper grade
(%)
Contained Metal
(Mlbs)
Proved 321.81 0.56 5.82 0.55 3876.59
Probable 277.24 0.35 3.10 0.43 2626.36
Total Reserves 599.05 0.46 8.92 0.49 6502.95
Measured 19.79 0.53 0.34 0.51 223.33
Indicated 72.56 0.38 0.88 0.39 630.00
Inferred 678.07 0.30 6.45 0.35 5,190.00
Total Resources 770.42 0.31 7.67 0.36 6,043.33
Total Reserves +
Resources
1,369.47 0.38 16.59 0.42 12,546.28
Source: https://www.teck.com/news/news-releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
Relincho (NI 43-101)
Category
Copper Molybdenum
Tonnes
(Millions)
Copper
grade (%)
Contained
Metal (Mlbs)
Molybdenum
grade (%)
Contained Metal (Mlbs)
Proved 435.30 0.38 3646.75 0.016 153.55
Probable 803.80 0.37 6556.70 0.018 318.97
Total Reserves 1,239.10 0.37 10,106.65 0.017 464.36
Measured 79.90 0.27 475.60 0.009 15.85
Indicated 317.10 0.34 2376.89 0.012 83.89
Inferred
Share your feedback
Discover