Board Appointment and Project Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX:NFL 3 October 2025
Board Appointment and Project Update
Norfolk continues to strengthen corporate capabilities and jurisdictional experience
with new board appointment as Maiden Drill Program progresses
• Mr David Fowler has been appointed to Norfolk board cementing Norfolk capabilities to operate in
Chile at the Carmen Copper Project
• 20 of 50 planned drill collars have been completed at the Carmen Copper Project with assays
expected in the coming month and continuing throughout Q4
• Earn-in of Carmen Copper Project rapidly progresses towards Norfolk 100% ownership of Carmen
Copper Project option agreement
• Transcendence Mining Jason Greive to be appointed to Norfolk board upon Norfolk moving to 100%
ownership of Carmen Copper Project option agreement
Board Appointment
Norfolk Metals Ltd (ASX:NFL; “Norfolk” or the “Company”) is pleased to advise Mr. David Fowler has been
appointed to the Norfolk board of directors as a Non-Executive Director. Mr Fowler is a director of Transcendence
Mining Pty Ltd (“Transcendence”), the option vendors and project operators of the Carmen Copper Project
(“Carmen”), in Chile. Mr Fowler brings 35 years of financial & mining industry experience with a decade of
operational experience in Chile; also speaking fluent Spanish.
As the CFO at Merdeka Copper Gold, Mr Fowler has been instrumental in funding the growth of the group from a
single asset gold project into a multi-commodity business with an enterprise value of US$9 Billion in 2024. He has
led debt & equity funding processes to raise more than US$400m in equity and US$4B in debt funding during this
time. Mr Fowler has worked in numerous other executive roles including CEO of Orosur Mining, a South American
focused gold company producing 100,000 ounces of gold per annum and Finders Resources Limited that operated
the 20,000-tonne per annum Wetar copper heap leach project.
Carmen Copper Drilling Update
Since the program commenced mid-August 2025, there have been 20 successfully completed holes out of the up
to 50 planned drill collars. The exploration team have been working through the strategically planned RC collars
targeting extensions and validation of the known mineralisation between the Carmen Main NI43-101 resource area
(see Annexure A) and the Tobaco Prospect to the south west (Figure 1). Several holes located in the hanging wall
of the Carmen-Tobaco Fault and one hole to the south east (footwall side) towards the Higueritas Belt have been
completed. The drill rig is currently operating at the north eastern end of the known Carmen Main area. Samples
have been regularly transported to ALS and as assays are received and the QAQC procedures completed, Norfolk
will report these results to the market along with sections and other geological interpretation.
Earn In Agreement
As the Company rapidly progresses the Maiden Drilling Campaign at Carmen, we expect to achieve the 100%
ownership of the Carmen Copper option agreement (see “Norfolk to earn-into Chilean Copper Project” release
March 31st
2025) in the near term which will see further commitment and partnership with Transcendence. Upon
Norfolk acquiring 100% ownership of the Carmen Copper option agreement Transcendence will move to appoint
Jason Greive to Norfolk board of directors.
2
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 1: Maiden Drill Program Status Plan
Ben Phillips the Executive Chairman of Norfolk comments; “Having worked with Dave and the Transcendence
team since Norfolk was introduced to the Carmen Copper Project, we are delighted to welcome Dave to the board
of Norfolk. Norfolk and Transcendence have been aligned in our vision and work throughout 2025 and the official
appointment of Dave will further strengthen where we are heading as we drill Carmen and continue to review
copper opportunities in Chile. We look forward to releasing news on the Maiden Drill Campaign results in the
coming weeks.”
InvestorHub
Investors are also encouraged to join and engage through the Norfolk Metals InvestorHub, post
questions and feedback through the Q&A function accompanying each piece of content, and engage
directly with the Norfolk team.
Indicative Next steps and Key Milestone Events
Q3 2025
• Drilling permit granted by authorities in Chile (SERNAGEOMIN) – see ASX release July 21st
2025
• Finalise all stakeholder engagements and contractor inductions – see ASX release August 7th
2025
• Commence Maiden Drill Campaign – see ASX release 13th
August 2025
• Shareholder Meeting to approve Tranche 2 placement – see ASX release 25th
September 2025
3
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
Q4 2025
• Appoint a Transcendence Mining director to Norfolk board – see ASX release today
• As the Maiden Drilling Campaign progresses the company will release drilling results
• Commence Diamond Drilling at Carmen Copper Project
• Commence the re-assay of historical drill core for gold analysis
• Subsequent drill permitting submitted to authorities in Chile (SERNAGEOMIN)
• Commence historical metallurgical test work on copper oxides
END.
This announcement has been authorised by the board of directors of Norfolk Metals.
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2
. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, high-
margin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2
, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
The Roger River Project comprises two granted exploration licenses, EL20/2020, and EL17/2021, which together
cover 74km2
, located 410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold
and copper as indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the
Roger River Fault along with carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au
Competent Person Statement
The information in this announcement that relates to exploration results, is based on, and fairly represents,
information and supporting documentation prepared by Mr Leo Pilapil, a competent person who is a member of
the Australasian Institute of Mining and Metallurgy. Mr Pilapil has a minimum of five years’ experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore Reserves Committee
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Pilapil is a
related party of the Company, being the Technical Director, and holds securities in the Company. Mr Pilapil has
consented to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Forward Looking Statements
This announcement includes “forward looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward looking statements can be identified by the use of forward looking terminology, including,
4
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”,
“goals”,“targets”,“aims”,“outlook”,“guidance”,“forecasts”,“may”,“will”,“would”,“could”or“should”or, in each
case, their negative or other variations or comparable terminology. These forward looking statements include all
matters that are not historical facts. By their nature, forward looking statements involve known and unknown risks,
uncertainties and other factors because they relate to events and depend on circumstances that may or may not
occur in the future and may be beyond the Company’s ability to control or predict which may cause the actual
results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements. Forward looking statements are based on assumptions and are not
guarantees or predictions of future performance. No representation is made that any of these statements or
projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness
or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements
may be based are reasonable. Forward looking statements speak only as at the date of this release and the
Company and its affiliates, related bodies corporate (as that term is defined in the Corporations Act) and its
directors, employees, officers, representatives, agents, partners, consultants and advisers disclaim any
obligations or undertakings to release any update of, or revisions to, any forward-looking statements in this
announcement.
Disclaimers
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release. The Company will not update or keep current the information contained in this release or to correct any
inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any
opinions express in this release are subject to change without further notice.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release.
This release does not constitute an invitation, offer or recommendation to apply for or purchase securities and
does not contain any application form for securities. This release does not constitute an advertisement for an
offer or proposed offer of securities. Neither this release nor anything contained in it shall form the basis of any
contract or commitment and it is not intended to induce or solicit any person to engage in, or refrain from engaging
in, any transaction.
5
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
Annexure A
Table: Carmen NI 43-101 MRE
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in the Table:
• The Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
• A competent person has not done sufficient work to classify the foreign estimate as a mineral resources in
accordance with the JORC Code; and
• It is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able
to be reported as mineral resources in accordance with the JORC Code.
Within the Carmen Tabaco Belt, the Carmen NI 43-101 MRE has been defined over 600m of strike, to a depth of
30m in the Carmen Oxide Zone (COZ). The Carmen NI 43-101 MRE excludes historic higher-grade drilling and
covers no more than 20% of the COZ. The COZ presents as potentially continuous between drill holes and sections
along structural and lithology-controlled zones, which are mainly sub-parallel to the Tabaco Thrust.
Compliance Statements (information required by ASX Listing Rule 5.13)
The Mineral Resource Estimate at the Carmen Copper Project is a foreign estimate prepared in accordance with
Canadian National Instrument 43-101 and is not reported in accordance with the JORC Code 2012. A competent
person has not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the
JORC Code 2012, and it is uncertain whether further evaluation and exploration will result in an estimate
reportable under the JORC Code 2012.
The Company initially announced the foreign estimate for the Carmen Copper Project on 31 March 2025 in
accordance with ASX Listing Rule 5.12. The Company confirms that the supporting information included in the
announcement of 31 March 2025 continues to apply and has not materially changed.
Norfolk confirms that it is not in possession of any new information or data relating to the foreign estimate that
materially impacts on the reliability of the estimates or the Norfolk’s ability to verify the foreign estimates as
mineral estimates in accordance with Appendix 5A (JORC Code).
It is the Company’s intention to validate the results of the foreign estimate through re-logging of historical drill
holes and completion of the proposed maiden drilling program. The results of the maiden drill program (including
twinning of historical holes) will determine the next phase of drilling to facilitate the course towards the Company’s
aim to construct a 2012 JORC Resource estimate. In addition, it is also the intent of the Company to use the rejects
(remaining samples not sent for analysis) from the RC drilling to conduct additional metallurgical studies to
confirm the leaching results of the previous study and possibly determine a more suitable/economic leaching
strategy.
Tonnage
(kilotonnes)
Copper
grade (%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Measured - - - - - -
Indicated 1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2298.22
Total
Measured and
Indicated
1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2,298.22
Inferred 836.1 0.59 493.30 1,191.90 0.49 584.03 2,028.00 0.53 1077.33
Total
Resources
2,663.90 0.59 1,571.70 2,934.50 0.61 1803.85 5,598.40 0.60 3,375.55
Resource
Classification
Note: reported at a cut-off grade of 0.2% Cu, not capped
Oxide Zone Secondary Enrichment Total Resource (Oxide+Secondary)
Share your feedback
Discover