Half Year Financial Report
Released
Released
Announcement PDF
A B N 3 8 6 5 2 4 3 8 3 8 5
INTERIM FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2025
INTERIM FINANCIAL REPORT
for the half-year ended 31 December 2025
CORPORATE DIRECTORY ................................................................................................1
DIRECTORS’ REPORT......................................................................................................2
AUDITOR’S INDEPENDENCE DECLARATION .....................................................................9
INDEPENDENT AUDITOR’S REVIEW REPORT.................................................................. 10
DIRECTORS’ DECLARATION ..........................................................................................11
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME ............................................................................................12
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION .............................13
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ..............................14
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS ..........................................15
NOTES TO THE INTERIM FINANCIAL STATEMENTS........................................................16
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 1
CORPORATE DIRECTORY
DIRECTORS
Ben Phillips (Executive Chairman)
Leonardo Pilapil (Technical Director)
Patrick Holywell (Non-Executive Director)
David Fowler (Non-Executive Director)
COMPANY SECRETARY
Arron Canicais
REGISTERED OFFICE
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
POSTAL ADDRESS
PO BOX 156
Bull Creek WA 6149
PRINCIPAL PLACE OF BUSINESS
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
CONTACT INFORMATION
Tel: + (08) 6255 8625
info@norfolkmetals.com.au
AUDITORS
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Road
Subiaco WA 6008
SHARE REGISTRY
Automic Share Registry
Level 5, 191 St Georges Terrace
Perth WA 6000
1300 288 664 (Local)
+61 2 9698 5414 (International)
www.automic.com.au
BANKER
Australia and New Zealand Banking Group Limited
464 Hay Street,
Subiaco WA 6008
SECURITIES EXCHANGE LISTING
Australian Securities Exchange (ASX)
Level 40, Central Park
152-158 St George's Terrace
Perth WA 6000
ASX CODE: NFL
NFLO
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 2
DIRECTORS’ REPORT
The directors of Norfolk Metals Limited (ASX:NFL) (Company or Norfolk) present their report, together with
the financial statements of the consolidated entity consisting of Norfolk and its controlled entities for the half-
year ended 31 December 2025 (Period) and the auditor’s review report thereon. The Interim Financial Report
has been prepared in accordance with AASB 134 Interim Financial Reporting.
It is recommended that the Directors’ Report be read in conjunction with the annual financial statements for the
year ended 30 June 2025 and considered together with any public announcement made by the Company during
the Period and up to the date of this report.
DIRECTORS
The names and particulars of the directors of the Company in office during the Period and until the date of this
report are as follows. Directors were in office for the entire Period unless otherwise stated.
Director Position
Ben Phillips Executive Chairman (Appointed 30 July 2021)
Leonardo Pilapil Technical Director (Appointed 30 July 2021)
Patrick Holywell Non-Executive Director (Appointed 8 October 2021)
David Fowler Non-Executive Director (Appointed 3 October 2025)
The name of the secretary in office at any time during or since the end of the year are:
Company Secretary Position
Arron Canicais Company Secretary (Appointed 19 August 2021)
OPERATING RESULTS
The Company has incurred a net loss after tax for the half-year ended 31 December 2025 of $1,058,306 (31
December 2024: $348,921).
REVIEW OF OPERATIONS
Norfolk Metals currently holds the Orroroo Uranium Project in South Australia and the Roger River Gold/Copper
Project in Tasmania and an option over the Carmen Copper Project in Chile.
Highlights of reporting period as well as milestones post period end
- Maiden Drill Campaign Phase #1 RC completed at the Carmen Copper Project (See announcement 11th
December 2025 and 14th
January 2026)
HIGHER GRADE DRILLING INTERCEPTS:
o CCRC-25-030 - 53m (30.9m TW) @ 1.1% Cu from 62m; incl. 4m @ 1.3% Cu from 64m,
and 13m @ 1.9% Cu from 85m; and 13m @ 1.6% Cu from 100m
o CCRC-25-033 - 32m (19.9m TW) @ 1.3% Cu from 97m; incl. 9m @ 2.2% Cu from 99m,
4m @ 1.8% Cu from 113m; 2m @ 1.9% Cu from 119m; and 3m @ 2.1% Cu from 125m
o CCRC-25-034 - 26m (21.9m TW) @ 0.8% Cu from 37m; incl. 6m @ 1.3% Cu from 39m;
and 4m @ 2.2% Cu from 52m
o CCRC-25-020 - 22m (19.2 TW) @ 0.5% Cu from 0m; incl. 6m @ 1.0% Cu from 12m
o CCRC-25-035 - 18m (15.6m TW) @ 0.5% Cu from 40m; incl. 5m @ 0.9% Cu from 52m
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 3
o CCRC-25-036 - 12m (10.3m TW) @ 0.8% Cu from 79m; incl. 3m @ 1.3% Cu from 79m
o CCRC-25-027 - 17m (13.7 TW) @ 0.9% Cu from 14m; incl. 3m @ 1.4% Cu from 16m and
5m @ 1.5% Cu from 24m
- A$3.0m spend commitment reached at the Carmen Copper Project (See announcement 24th
December
2025)
- A$3.5m capital raising completed including commitments from Norfolk Board (See announcement 28th
July 2025)
- Successful capital raise of $2,100,000 (which includes $100,000 in director participation subject to
shareholder approval) including sophisticated resource investors who approached the Company as a
cornerstone (See announcement 14th
January 2026)
- Strong capital position at December 31st
2025 of A$2.14m in cash (with additional $2.0m in funds secured
subsequently via placement see release 14th
January 2026)
- Mr. David Fowler appointed to Norfolk Board of Directors (see release October 3rd
2025)
Phase #1 drilling complete at the Carmen Copper Project
Subsequent to the reporting period Norfolk Metals Ltd (Norfolk or the Company) reported the assay results
from the final six RC holes of the Maiden Drill Campaign totalling 945m which completes Phase #1 of the 2025
Maiden Drill Campaign with 37 RC holes drilled totalling 3,401m with no personal safety, process safety or
environmental incidents incurred (Figure 1).
The RC drilling Phase #1 concentrated on the Carmen Main target area, which hosts a foreign copper oxide
mineral resource estimate of 5.6Mt at 0.6% Cu reported in accordance with the Canadian National Instrument
43-101 (the Carmen NI 43-101 MRE1, 2
(See Annexure A and 31st
March 2025 ASX release)). The RC Phase
of drilling focused on targets along strike of the Carmen-Tabaco Thrust Fault (Carmen Tabaco Thrust or CT
Thrust or CTTF) system and confirmation of known mineralisation within the historical resource area, with some
twinning of important historical drill holes.
1
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January
2027 (Carmen NI 43-101 MRE).
2
The Carmen NI 43-101 MRE is a historical foreign estimate (within the meaning of the ASX Listing Rules) and is not reported in accordance
with the JORC Code and a Competent Person (within the meaning of the JORC Code) has not done sufficient work to classify the foreign
estimates as Mineral Resources in accordance with the provisions of the JORC Code. It is uncertain that following evaluation and further
exploration work that the foreign estimates will be able to be reported as Mineral Resources in accordance with the provisions of the JORC
Code.
Maiden Drill Campaign Results
Phase #1 of the Maiden Drilling Campaign has been completed consisting of 37 RC holes drilled totalling 3,401m.
The results of the higher grade intersections from the drill program have been summarised below (Table 1).
Refer to Table 4 for further details of the results of Phase #1 drilling.
Table 1: Carmen Main Higher Grade Intercepts
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 4
Overall, the RC drilling results validated the historical Cu Oxide and Cu Sulphide intersections used in the Carmen
NI 43-101 MRE and confirmed the higher grades contained within the sulphide mineralisation. Drilling along
the downdip margins of the CT Thrust has confirmed the continuity of the Cu oxide ore data used
in the historic Carmen NI 43-101 MRE, and indicates mineralisation remains open at depth,
outlining the potential to identify resources in the oxide and sulphide section of the ore body.
Figure 1: Carmen Cu Project Carmen Main Maiden Drill Campaign RC Phase #1
Spend Commitment Completed at Carmen Copper
On 24th of December 2025, the Company announced that it had solely funded $A3,000,000 in exploration
expenditure on the Project. A General Meeting of shareholders is planned for Q2 2026 to issue the shares and
performance rights to complete the transaction.
Board Appointment
Mr. David Fowler was appointed to the Norfolk board of directors as a Non-Executive Director in October 2025.
Mr Fowler brings 35 years of financial & mining industry experience with a decade of operational experience in
Chile; also speaking fluent Spanish. In Mr Fowler’s role as the CFO at Merdeka Copper Gold, Mr Fowler has been
instrumental in funding the growth of the group from a single asset gold project into a multi-commodity business
with an enterprise value of US$9 Billion in 2024. He has led debt & equity funding processes to raise more than
US$400m in equity and US$4B in debt funding during this time. Mr Fowler has worked in numerous other
executive roles including CEO of Orosur Mining, a South American focused gold company producing 100,000
ounces of gold per annum and Finders Resources Limited that operated the 20,000-tonne per annum Wetar
copper heap leach project.
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 5
$3.5m Capital Raise Completed
28th
July 2025 saw the Company announce it had received firm commitments to raise $3.5 million (before costs)
towards funding the Transaction and the continually expanding exploration plans of the Project (July
Placement). Norfolk board and existing shareholders participated in the July Placement. The 29th
September
2025 saw the successful completion of the July Placement post the EGM held on the 25th
September 2025 (see
ASX news releases from these respective dates.
The July Placement comprised the issue of 28,000,000 new shares in the Company (Shares) using the
Company’s existing placement capacity pursuant to ASX Listing Rules 7.1 (7,806,140 Shares) and 7.1A (5,204,093
Shares), totalling 13,010,233 via Tranche 1 and 14,989,767 via Tranche 2. Refer to the Company’s Appendix 3B
lodged 28 July 2025, for further details.
The July Placement issue price of $0.125 represented a 14.3% discount to the 15-day volume weighted average
price (VWAP) of $0.14. JP Equity Partners acted as Lead Manager to the July Placement.
$2.1m Capital Raise Completed
Subsequent to the period, the Company completed a capital raise with support from sophisticated resource
investors as cornerstones, existing shareholders and directors to raise $2,100,000 (before costs) through a
placement of up to a total of 21,000,000 fully paid ordinary shares at an issue price of $0.10 each (Placement
Shares), together with one free attaching unquoted option for every Placement Share subscribed for
(Placement Options) (the January Placement) (director commitments subject to shareholder approval). The
Placement Shares will represent approximately 25% of the Company’s existing shares on issue.
The issue price represented a 4.76% discount to the last traded price of $0.105 on 13 January 2026, and a
3.85% discount to the 15-day volume weighted average price (VWAP) of $0.104.
The Placement Shares (excluding the Director Placement Shares referred to below) were issued under the
Company’s available placement capacity under Listing Rule 7.1 (11,919,886 Shares) and Listing Rule 7.1A
(8,080,114 Shares). The Placement Options will have an exercise price of $0.15 each and will expire 3 years from
the date of issue (subject to shareholder approval).
The Board has committed to subscribe for 1,000,000 Placement Shares ($100,000) (Director Placement
Shares) and 1,000,000 free attaching Options on the same terms as other participants in the Placement
(together, the Director Placement Securities). This amount forms part of the total $2,100,000 (before costs)
to be raised under the Placement. JP Equity Partners acted as Lead Manager to the January Placement.
Overview – Carmen Copper Project historical work
The Carmen Copper Project is in the Huasco Province, Atacama Region in Chile. The Project encompasses twenty-
two contiguous exploration and exploitation licenses totalling 46.6km2
.
The Project hosts multiple mineralised targets over an extensive 15km plus strike length (over two regional belts)
with intensive copper mineralisation from surface. Only 16km to the northeast of the CCP is the Nueva Unión
joint venture between Teck and Newmont. Nueva Unión is currently developing the multi-billion-dollar Relincho
and Fortuna (previously called El Morro) porphyry deposits (Figure 2).
The Carmen Copper Project contains 149 historical holes of reverse circulation (RC) and diamond drilling (DD)
totalling 10,513.35 metres. From the late 1800’s to 1960’s there was small scale high-grade artisanal copper
mining in the area. Between 1962 and 1964, Minera Metalmine Ltda. (MML) drilled 56 shallow percussion holes
for 1,680 metres to evaluate leachable copper resources for open pit mining.
In 2002, Minera IPBX Chile Limitada (MIPBX) of International PBX Ventures Limited (IPBX) explored the Project.
Work by IPBX initially included 29 km of ground magnetics and 30 km of induced polarization (IP), defining a
NE striking, elongated chargeability anomaly 100 - 300 metres wide and 2,400 metres long in the area drilled by
MML. In mid-2003, IPBX drilled 25 RC and DD holes, to investigate the IP chargeability anomaly over Carmen,
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 6
with two holes also into Tabaco for 3,685.95m. Most Carmen holes intersected some copper bearing sulphides,
and several returned promising Cu grades in oxides.
In early 2004, mapping and additional soil sampling by IPBX confirmed the extent of the copper oxide zone over
the chargeability anomaly and delineated further Cu + Au anomalies to the west and stratigraphically up section.
In 2006, IPBX completed 67 DD holes for 4,650.2 metres, and infilled ~600 metres of strike at Carmen at ~ 50m
spacing, with step out holes over a further 400 metres of strike, plus a few scout holes on the northern hanging
wall of the Carmen-Tabaco thrust fault and at the Tabaco project area. At Carmen, thick sulphide zones were
confirmed in several holes, but not all holes testing areas of known oxide confirmed the historic work that had
returned results previously.
In January 2007, SRK delivered the Carmen NI 43-101 MRE (See announcement 31st
March 2025)
Existing project developments in the reporting period
Both the Orroroo Uranium Project and the Roger River Project remain as assets of the Company since Norfolk’s
listing in March 2022, with future exploration and reporting obligations addressed; however, the focus was limited
during the period due to drilling execution at the Carmen Copper Project.
Norfolk has previously announced the intention to consider further geophysics for target generation at the
Orroroo Uranium Project (Figure 2). The Company continues to work with Orroroo stakeholders via the
Company’s local correspondent to build a data base of existing water wells that have the potential to be accessed
with a geophysical probe (gamma) without interrupting or damaging the water infrastructure services the wells
provide.
Figure 2: Orroroo Uranium Project
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2, located approximately 274km northwest of the capital city of Adelaide, South Australia,
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide.
It consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidian basement.
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 7
The Roger River Project (Figure 3) comprises of the granted exploration license EL20/2020, which covers 26km2
,
located 410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold and copper
as indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the Roger River
Fault along with carbonate-rich host rocks.
Revised expenditure commitments were previously established for Tasmanian permits EL20/2020, and proposals
were prepared for future drilling upon receipt of all required approvals. Planning for future drill testing of priority
targets continues with the resubmission of a previously approved drilling plan to Mineral Resources Tasmania
(MRT) in December 2025.
Figure 3: Roger River Project
CAPITAL MANAGEMENT
The Company maintains 80,801,141 fully paid ordinary shares on issue and $2,134,565 in cash as at 31 December
2025.
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
The directors are not aware of any matters or circumstances that have arisen since the end of the financial year
which significantly affected or may significantly affect the operations of the Company, the results of those
operations, or the state of affairs of the Company in future financial years, except for:
On 14 January 2026, the Company received firm commitments from sophisticated resource investors as
cornerstones, existing shareholders and directors to raise $2,100,000 (before costs) through a placement of up
to a total of 21,000,000 fully paid ordinary shares at an issue price of $0.10 each (Placement Shares), together
with one free attaching unquoted option for every Placement Share subscribed for (Placement Options). The
Board has committed to subscribe for 1,000,000 Placement Shares ($100,000) (Director Placement Shares) and
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 8
1,000,000 free attaching Options on the same terms as other participants in the Placement (together, the Director
Placement Securities). This amount forms part of the total $2,100,000 (before costs) to be raised under the
Placement. On 16 January 2026, the Company issued and allotted 20,000,000 shares under the private placement
to sophisticated and professional investors, raising a total of $2,000,000 (before costs). The issue of Director
Placement Securities and all of the Placement Options are subject to shareholder approval at a general meeting.
RISK MANAGEMENT
The half-year financial report does not include all risk management information and disclosures required in the
Annual Report and, as such, should be read in conjunction with the Group’s 2025 Annual Report.
SIGNIFICANT CHANGE IN THE STATE OF AFFAIRS
There were no significant changes in the state of affairs of the Group other than as referred to elsewhere in this
consolidated half-year report and in the accounts and notes attached thereto.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditors’ independence declaration as required under Section 307C of the Corporations Act 2001
in relation to the review for the half-year is set out on page 9 of this report.
This report is presented in accordance with a resolution of the Board of Directors and is signed for and on behalf
of the directors by:
Ben Phillips
Executive Chairman
Perth, Western Australia this 11th
day of March 2026
To the Board of Directors,
AUDITOR’S INDEPENDENCE DECLARATION UNDER SECTION 307C OF THE
CORPORATIONS ACT 2001
As lead audit director for the review of the financial statements of Norfolk Metals Limited and its controlled
entities for the period ended 31 December 2025, I declare that to the best of my knowledge and belief, there
have been no contraventions of:
• the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
• any applicable code of professional conduct in relation to the review.
Yours Faithfully
HALL CHADWICK WA AUDIT PTY LTD MARK DELAURENTIS CA
Director
Dated this 11th day of March 2026
Perth, Western Australia
INDEPENDENT AUDITOR’S REVIEW REPORT
TO THE MEMBERS OF NORFOLK METALS LIMITED
Conclusion
We have reviewed the accompanying half-year financial report of Norfolk Metals Limited (“the Company”)
and Controlled Entities (“the Consolidated Entity”) which comprises the condensed consolidated statement of
financial position as at 31 December 2025, the condensed consolidated statement of profit or loss and other
comprehensive income, condensed consolidated statement of changes in equity and condensed
consolidated statement of cash flows for the half-year ended on that date, a summary of material accounting
policies and other selected explanatory notes, and the directors’ declaration.
Based on our review, which is not an audit, we have not become aware of any matter that makes us believe
that the half-year financial report of Norfolk Metals Limited and Controlled Entities does not comply with the
Corporations Act 2001 including:
a. Giving a true and fair view of the Consolidated Entity’s financial position as at 31 December 2025 and
of its performance for the half-year ended on that date; and
b. Complying with Accounting Standard AASB 134: Interim Financial Reporting and Corporations
Regulations 2001.
Basis for Conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by the
Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s Responsibilities
for the Review of the Financial Report section of our report. We are independent of the Company in
accordance with the auditor independence requirements of the Corporations Act 2001 and the ethical
requirements of the Accounting Professional and Ethical Standards Board’s APES 110 Code of Ethics for
Professional Accountants that are relevant to our audit of the annual financial report in Australia. We have
also fulfilled our other ethical responsibilities in accordance with the Code.
We confirm that the independence declaration required by the Corporations Act 2001 which has been given
to the directors of the Company, would be in the same terms if given to the directors as at the time of this
auditor’s review report.
Responsibility of the Directors for the Financial Report
The directors of the Company are responsible for the preparation of the half-year financial report that gives a
true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001 and for
such control as the directors determine is necessary to enable the preparation of the half-year financial
report that gives a true and fair view and is free from material misstatement, whether due to fraud or error.
Auditor’s Responsibility for the Review of the Financial Report
Our responsibility is to express a conclusion on the half-year financial report based on our review. ASRE
2410 requires us to conclude whether we have become aware of any matter that makes us believe that the
half-year financial report is not in accordance with the Corporations Act 2001 including giving a true and fair
view of the Consolidated Entity’s financial position as at 31 December 2025 and its performance for the half-
year ended on that date, and complying with Accounting Standard AASB 134 Interim Financial Reporting
and the Corporations Regulations 2001.
A review of a half-year financial report consists of making enquiries, primarily of persons responsible for
financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards and
consequently does not enable us to obtain assurance that we would become aware of all significant matters
that might be identified in an audit. Accordingly, we do not express an audit opinion.
HALL CHADWICK WA AUDIT PTY LTD MARK DELAURENTIS CA
Director
Dated 11th day of March 2026
Perth, Western Australia
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 12
DIRECTORS’ DECLARATION
The directors declare that the interim financial statements and notes are in accordance with the Corporations Act
2001:
(a) Comply with Accounting Standard AASB 134: Interim Financial Reporting and the Corporations
Regulations 2001, and other mandatory professional reporting requirements;
(b) As stated in Note 1.1, the financial statements also comply with International Financial Reporting
Standards; and
(c) Give a true and fair view of the financial position of the entity as at 31 December 2025 and of its
performance for the half year ended on that date.
In the directors’ opinion there are reasonable grounds to believe that Norfolk Metals Limited will be able to pay
its debts as and when they become due and payable.
This declaration is made in accordance with a resolution of the directors pursuant to section 303(5)(a) of the
Corporations Act 2001.
For, and on behalf of, the Board of the Company,
Ben Phillips
Executive Chairman
Perth, Western Australia this 11th
day of March 2026
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 13
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR
LOSS AND OTHER COMPREHENSIVE INCOME
for the half-year ended 31 December 2025
Note
Half-Year
Ended
31 Dec 2025
$
Half-Year
Ended
31 Dec 2024
$
Interest Income 20,075 50,624
Expenses
Administration costs (36,963) (34,474)
Director fees (159,000) (123,000)
Professional costs (109,144) (81,521)
Marketing and investor relations costs (107,515) (21,677)
Exploration expenditure written off (3,835) (81,608)
Depreciation expense - (1,649)
Finance expenses (25) (766)
Legal and compliance expenses (64,953) (51,402)
Gain/ (loss) on disposal of PPE - (3,648)
Share based payment expense 5 (596,946) -
Foreign Currency income - 200
Loss before tax (1,058,306) (348,921)
Income tax (benefit)/expense - -
Loss after tax from continuing operations (1,058,306) (348,921)
Other comprehensive loss for the period, net of tax - -
Total comprehensive loss net of tax for the Period (1,058,306) (348,921)
Basic and diluted loss per share ($) (0.015) (0.009)
The Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in
conjunction with the accompanying notes, which form an integral part of the interim financial report.
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 14
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL
POSITION
as at 31 December 2025
Note
As At
31 Dec 2025
$
As At
30 June 2025
$
Current assets
Cash and cash equivalents 2 2,134,565 2,103,456
Trade and other receivables 50,459 280,767
Total current assets 2,185,024 2,384,223
Non-Current assets
Other assets 59,000 59,000
Exploration Assets 3 7,143,216 4,090,592
Plant and Equipment - -
Total Non-Current assets 7,202,216 4,149,592
Total assets 9,387,240 6,533,815
Current liabilities
Trade and other payables 166,780 367,187
Financial liability - 6,178
Total current liabilities 166,780 373,365
Total liabilities 166,780 373,365
Net assets 9,220,460 6,160,450
Equity
Issued capital 4 10,767,938 7,754,328
Reserve 5 2,265,448 1,160,742
Accumulated losses (3,812,926) (2,754,620)
Total Equity 9,220,460 6,160,450
The Condensed Consolidated Statement of Financial Position should be read in conjunction with the
accompanying notes, which form an integral part of the interim financial report.
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 15
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN
EQUITY
for the half-year ended 31 December 2025
Note
Issued
Capital
$
Option
Reserve
Accumulated
Losses
$
Total
Equity
$
Opening balance 1 July 2024 6,740,113 1,198,865 (2,067,386) 5,871,592
Other Comprehensive loss - - - -
Loss for the Period - - (348,921) (348,921)
Total comprehensive loss for the Period - - (348,921) (348,921)
Adjustment of contingent consideration - (70,000) - (70,000)
Balance at 31 December 2024 6,740,113 1,128,865 (2,416,307) 5,452,671
Opening balance 1 July 2025 7,754,328 1,160,742 (2,754,620) 6,160,450
Other Comprehensive loss - - - -
Loss for the Period - - (1,058,306) (1,058,306)
Total comprehensive loss for the Period - - (1,058,306) (1,058,306)
Shares issued during the year 3,500,000 - - 3,500,000
Capital raising costs (597,146) - - (597,146)
Share based payments 110,756 1,104,706 - 1,215,462
Balance at 31 December 2025 10,767,938 2,265,448 (3,812,926) 9,220,460
The Condensed Consolidated Statement of Changes in Equity should be read in conjunction with the
accompanying notes, which form an integral part of the interim financial report.
NORFOLK METALS LIMITED | 2025 INTERIM FINANCIAL REPORT Page 16
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
for the half-year ended 31 December 2025
Note
Half-Year
Ended
31 Dec 2025
$
Half-Year
Ended
31 Dec 2024
$
Cash flows from operating activities
Payments to suppliers and employees (575,644) (347,737)
Interest received 34,290 55,429
Net cash (used in) operating activities (541,354) (292,308)
Cash flows from investing activities
Payment for exploration activities (2,671,946) (144,664)
Proceeds from sale of plant and equipment - 5,000
Net cash (used in) investing activities (2,671,946) (139,664)
Cash flows from financing activities
Proceeds from issue of shares 3,500,000 -
Payment of equity issue costs (249,387) -
Proceeds from other liability - 29,580
Payment of other liability (6,204) (6,205)
Net cash generated by financing activities 3,244,409 23,375
Net decrease in cash and cash equivalents 31,109 (408,597)
Cash and cash equivalents at the beginning of the Period 2,103,456 3,069,724
Cash and cash equivalents at the end of the Period 2 2,134,565 2,661,127
The Condensed Consolidated Statement of Cash Flow should be read in conjunction with the accompanying
notes, which form an integral part of the interim finan
Share your feedback
Discover