Carmen Copper Maiden Drilling Presentation
Released
Released
Announcement PDF
2025 Maiden Drill Campaign
Investor Presentation
July 2025
ASX:NFL
norfolkmetals.com.au
Disclaimer
Presentation: This presentation has been prepared and issued by Norfolk Metals Limited (ASX: NFL, Norfolk or the Company) to provide general information about the Company. The information in
this document is in summary form and should not be relied upon as a complete and accurate representation of any matters that a reader should consider in evaluating the Company. While
management has taken every effort to ensure the accuracy of the material in this presentation, the Company and its advisers have not verified the accuracy or completeness of the material contained in
this presentation.
Forward-looking statements: This presentation contains forward looking information about the Company and its operations. In certain cases, forward looking information may be identified by such
terms as "anticipates", "believes", “should”, "could", "estimates", “target”, “likely”, “plan”, "expects", "may", “intend”, "shall", "will", or "would". These statements are based on information currently
available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward looking statements are subject to risk factors associated with the
Company’s business, many of which are beyond the control of the Company. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of
variables and changes in underlying assumptions which could cause actual results or trends to differ materially from those expressed or implied in such statements. There can be no assurance that
actual outcomes will not differ materially from these statements.
Not financial product advice: This presentation is not financial product nor investment advice or a recommendation to acquire securities in the Company. It has been prepared without taking into
account the objectives, financial situation or needs of individuals Before making any investment decision, prospective investors should consider the appropriateness of the information having regard to
their own objectives, financial situation and needs and seek legal and taxation advice
No offer: This presentation and its contents are not an invitation, offer, solicitation or recommendation with respect to the purchase or sale of any securities in the Company in any jurisdiction and must
not be distributed, transmitted, or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that
or any other jurisdiction. This presentation is not a prospectus or any other offering document under Australian law (and will not be lodged with the Australian Securities and Investments Commission)
or any other law.
INVESTOR PRESENTATION
Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this presentation will be achieved or proved correct. Except for statutory liability
which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of
the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any
information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission
which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.
Competent Person Statement: The information is extracted from announcements entitled ‘Norfolk to earn-into Chilean Copper Project’ created on 31 March 2025, Carmen Copper Project Maiden Drill
Campaign Update created on 12th May 2025, Norfolk to proceed with Stage 1 Earn-in at Carmen Copper created 13th June 2025 and Carmen Copper Project Drilling Permit Granted created 21st July 2025
which are available to view on https://norfolkmetals.com.au/asx-announcements/. The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates
in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcement.
Authorisation: This presentation is authorised for release by Norfolk’s board of directors.
All currency amounts are in Australian dollars unless otherwise specified.
Presentation cover image: View when driving into site via road from Alto del Carmen Operations Camp.
2
Copper Commodity Highlights
Copper is the fundamental metal for existing energy infrastructure, future energy transitions and
growing AI data centre requirements. Supply gaps are presenting; copper prices are rising.
(TradingView - https://www.tradingview.com/news/te_news:471954:0-copper-firms-up-near-record-high/)
Energy Transition
Investment would need to average $5.6 trillion each year from 2025 to 2030,
in order to get on track for global net zero by 2050, in line with the Paris Agreement
INVESTOR PRESENTATION
Copper Firms Up Near Record High
Copper futures edged up to around US$5.73 per pound on Wednesday 23rd July 2025
(Global Investment in the Energy Transition Exceeded $2 Trillion for the First Time in 2024, https://about.bnef.com/insights/finance/global-investmentin-the-energy-transition-exceeded-2-trillion-for-the-first-time-in-2024-according-to-bloombergnef-report/)
Copper Supply Gap
Current copper mine project pipeline points to a 30% supply deficit by 2035
(2025 edition of the IEA’s annual Global Critical Minerals Outlook, https://www.iea.org/news/diversification-is-the-cornerstone-of-energy-security-yet-criticalminerals-are-moving-in-the-opposite-direction)
3
Chilean Copper Production and Reserves
Location
Mining
Sentiment
The country's copper reserves are estimated at
around 200 million metric tons, representing
nearly 23% of the world's known copper deposits.
Chile's copper production has reached a
significant milestone in May 2025, recording the
highest monthly output of the year at 486,574
metric tons. This represents a substantial 9.4%
year-on-year increase compared to May 2024.
Infrastructure
INVESTOR PRESENTATION
Chile maintains its status as the world's largest
copper producer, accounting for approximately
25% of global copper ore production. This
dominant position gives the country significant
influence over global supply dynamics.
Workforce
(Discovery Alert - https://discoveryalert.com.au/news/chilecopper-production-record-2025-global-impact/)
4
Carmen Copper Highlights
June 2025 Norfolk commenced earn-in at the Carmen Copper
Project with Transcendence Mining as Operators
Large-scale 46.6km2 concession package located 82km from the
major mining centre of Vallenar in the Huasco Province, Atacama
Region in Chile.
Heap
Leachable
The Project has significant copper oxide and copper sulphide
exploration potential with over 15km of strike.
In-country capability with Alex Raab appointed General Manager Exploration, bringing over 30 years exploration and resource
development experience in Latin America
Low Strip
Carmen
COPPER PROJECT
INVESTOR PRESENTATION
The Project hosts a historical copper oxide mineral resource reported
in accordance with NI 43-101 standards of 5.6Mt at 0.6% Cu**
Highly
Scalable
Maiden Drill Campaign to commence Q3 2025 with permitting
received July 2025 from Servicio Nacional de Geología y Minería
(SERNAGEOMIN, National Geology and Mining Services)
Company vision to delineate a shallow copper oxide resource of
sufficient magnitude to develop a low-cost, high-margin, valueaccretive heap leaching operation producing copper cathode
**Historical foreign estimate (within the meaning of the ASX Listing Rules) and is not reported in accordance with the JORC Code and a Competent Person (within the meaning
of the JORC Code) has not done sufficient work to classify the foreign estimates as Mineral Resources in accordance with the provisions of the JORC Code. It is uncertain that
following evaluation and further exploration work that the foreign estimates will be able to be reported as Mineral Resources in accordance with the provisions of the JORC
Code. Refer to Annexure A for the NI 43-101 mineral resource classification.
Amenable to
Low CapEx
5
Corporate Snapshot
Top 20 own ~47% of
shares on issue,
623 shareholders
(as at 27th July 2025)
Transformational
earn in commenced
in prime commodity
and jurisdiction with
favourable deal terms
Tight capital
structure leveraged
for exploration and
development
success
Pro Forma Capital Structure (ASX: NFL)
INVESTOR PRESENTATION
Capital Raise Price
$0.125
Proposed Shares to be issued via Capital Raise
28,000,000
Current Shares on issue
52,040,932
Options1
24,989,808
Market capitalisation (undiluted)
$10,005,117
Cash2, 3
$5,394,000
Enterprise value (EV)2, 3
$4,611,117
1. Options on issue at strike prices ranging from 20c to 30c and expiry dates ranging 29/06/2026 to 14/3/2027. Total includes 3,500,000 options to
be issued to Lead Manager of raise announced on ASX 28th July 2025 subject to shareholder approval.
2. Unaudited cash as of June 30th 2025 balance of $2,104,000 plus proposed raise of $3,500,000 minus costs of the offer
3. Firm commitments for placement of $3.5m announced 28th July
6
Carmen Cu Project Old workings along dominant structural
corridors trending NE 050° and NNW 340°
Board of Directors
Leo Pilapil
Patrick Holywell
Mr Phillips has over 15 years’ experience in commercial
negotiations with a broad spectrum of industries including
Oil and Gas, Resources, Medical technology, SaaS
and Defence.
Mr Pilapil has over 30 years’ experience as a
Geoscientist and three years as a Financial Planner.
Mr Holywell has over 20 years of experience in accounting,
finance and corporate governance, including employment
at Deloitte and Patersons (now Canaccord Genuity) as well
as various director, company secretary, advisory and CFO
roles. He is a Chartered Accountant and a Fellow of the
Governance Institute of Australia with experience in
resources, technology, health and financial sectors.
Executive Chair
Mr Phillips previously held a Non-Executive Director
position at Bronson Group (ASX:BGR) and subsequently
Mandrake Resources (ASX:MAN). Mr. Phillips is NonExecutive Chair of Mount Hope Mining (ASX:MHM) and
Non-Executive Director of Many Peaks Minerals (ASX: MPK)
His position as a Corporate Executive at Ironside Capital
is focused on sourcing, structuring, funding and
management requirements for small-cap companies
both private and public.
Non-Executive, Technical Director
As a geoscientist, he has held director positions for
several junior companies in Australia, Africa and
Turkey, mainly responsible for technical project
evaluations, project acquisitions, project
management and business development.
Mr Pilapil has established drilling companies in
Turkey and Lao PDR servicing several major
exploration and mining companies to complement
the acquisition of his own personal projects.
Independent, Non-Executive Director
INVESTOR PRESENTATION
Ben Phillips
Most recent involvements include roles with De Grey
Mining Limited (ASX:DEG), Si6 Metals Ltd (ASX:Si6),
Redcastle Resources Ltd (ASX:RC1) and Coppermoly Ltd
(ASX:COY). Mr Holywell has completed a Bachelor of
Commerce at UWA, a Graduate Diploma of Chartered
Accounting with the Institute of Chartered Accountants
and the Company Directors Course with the Australian
Institute of Company Directors.
7
Management Team – JV Operators
Please refer to Annexure B - Operator Capability Matrix
David Fowler
Alex Raab
Mr Greive is an experienced international mining executive
and project development professional with over 30 years
of corporate, operational and project development
experience in gold, copper, iron ore and base metals. He
specializes in building high performance teams and
providing the leadership and strategic navigation required
to develop new mining projects into successful operations.
Mr Greive has worked for several multinational mining
houses such as Barrick Gold, Placer Dome, Rio Tinto,
North Ltd and Evolution Mining across numerous
jurisdictions including Sweden, South Africa, Tanzania,
Indonesia and The Philippines. In his more recent roles
with Evolution Mining as General Manager of the Cowal
Gold Mine (NSW) and Red 5 as Chief Operating Officer, he
was instrumental in the initiation, navigation, leadership
and delivery of significant expansion and greenfield
development projects at Cowal and King of the Hills
operations.
Mr Fowler is a finance professional with over 35 years
of financial & mining industry experience. As the CFO
at Merdeka Copper Gold, he has been instrumental in
funding the growth of the group from a single asset
gold project into a multi-commodity business with an
enterprise value of US$9 Billion in 2024. He has led
debt & equity funding processes to raise more than
US$400m in equity and US$4B in debt during this
time. Mr Fowler has worked in numerous other
executive roles including CEO of Orosur Mining, a
South American focused gold company producing
100,000 ounces of gold per annum and Finders
Resources Limited that operated the 20,000-tonne
per annum Wetar copper heap leach project.
Mr Raab has over 30 years exploration and project
development experience in Latin America and North America.
He has worked for several major & junior mining - exploration
companies including: Homestake Mining, Kennecott Minerals,
MIM Exploration, Farwest Mining, Chapleau Resources,
Uruguay Minerals, Orosur Mining, Golden Rim Resources,
Challenger Gold and others. His experience includes;
epithermal Au-Ag/poly-metallic, sediment-hosted Au, shear
zone hosted lode-gold, Au-Cu, and Au porphyry; IOCG
deposits, magnetite, and other industrial commodities.
Director – Transcendence Mining
Carmen Copper JV Operators
Director - Transcendence Mining
Carmen Copper JV Operators
Carmen Copper SPA
General Manager - Exploration
INVESTOR PRESENTATION
Jason Greive
In 2020, Alex took an Exploration Manager position with
Challenger Gold (formally Challenger Exploration) managing
exploration in Ecuador which resulted in two separate maiden
MRE´s within 4 years on the AuCu-Ag-Mo Porphyry Deposits.
8
Carmen
Copper Project
ASX:NFL
norfolkmetals.com.au
9
Introduction to Carmen Copper Project
Mantos Blancos
82km from the historic mining town of Vallenar with a readily
available workforce
▪
Located in an easily accessible, rolling plateau
region between the elevations of 1950m-2150m
▪
Semi-arid with typical summer temperatures between 10-25°C and
winter temperatures between 0-15°C
Mantoverde Project
▪
12km from the national electrical grid and within 180km of three
industrial ports
▪
Large scale 46.6km2 concession package within the regionally
extensive north-trending San Felix Fault system, host to numerous
copper and gold bearing systems
▪
Historical copper-oxide resource of 5.6Mt @ 0.6% has been
outlined from surface to 30m which remains open in all directions1
▪
Strong potential for a material copper oxide resource
▪
Sulphide copper resource potential below the oxide zone
▪
Over 10,000m historical drilling by previous owners and operators
2.34bt @ 0.37% Cu
8.58mt contained Cu
Candelaria Complex
622mt @ 0.47% Cu
2.1mt contained Cu
INVESTOR PRESENTATION
▪
445mt @ 0.58% Cu
2.59mt contained Cu
1. Carmen NI 43-101 MRE. The mineral resource is a historical foreign estimate (within the meaning of the
ASX Listing Rules) and is not reported in accordance with the JORC Code and a Competent Person (within
the meaning of the JORC Code) has not done sufficient work to classify the foreign estimates as Mineral
Resources in accordance with the provisions of the JORC Code. It is uncertain that following evaluation and
further exploration work that the foreign estimates will be able to be reported as Mineral Resources in
accordance with the provisions of the JORC Code.
Please refer to Annexure A for information relating to the mineral resources and reserves classifications for
each of the Mantos Blancos Mine, Mantoverde Project and Candelaria Copper Mining Complex which have
been previously reported in accordance with NI 43-101 standards.
10
Introduction to Carmen Copper Project
▪ Established Operations Camp in
town of Alto del Carmen
approximately 1h drive from site
(25 km)
▪ Altitude and rainfall allows work to
operate all year around
▪ Between Vallenar and Alto del
Carmen all required services are
available
INVESTOR PRESENTATION
▪ Industrial water for drilling
available at Operations Camp
11
Operations Camp
Alto del Carmen Operations Camp
INVESTOR PRESENTATION
Alto del Carmen Core Shed
Alto del Carmen Accommodation
12
Carmen Copper Project – Regional Geology – Over 15km of strike
The Carmen Copper Project historical resource is contained
within approx. 5% of the total 15km plus potential strike
length of two major geological belts within the project area.
The project also hosts multiple historical workings where high
grade visible mineralisation has been observed.
▪
The Carmen-Tabaco Belt is over 7.5km long and hosts the
historical resource within mineralisation from surface and
old workings. Mineralisation is mainly hosted in calc-silicate
altered and locally skarnified volcanics, sediments and daciticrhyolitic porphyritic.
▪
The Higueritas Belt is approximately 7.5km long and sub
parallel to the Carmen-Tabaco Belt. Sporadic old workings are
known from this area, but no drilling is available, with data
limited to geophysics, and some rock chip samples.
▪
The Relincho copper-moly porphyry project (2.25Bt @ 0.37%
Cu, 0.015% Mo) 1 is approximately 16km to the north-northeast
of the Project. The Fortuna (El Morro) copper-gold porphyry
project (1.37Bt @ 0.42% Cu, 0.38g/t Au)1 is located
approximately 45km to the east of the Project. The Relincho and
Fortuna projects are jointly held by Teck and Newmont as part of
the Nueva Unión joint venture.
1.
Please refer to Annexure A for information relating to the mineral resources and reserves classifications for the Relincho and
Fortuna Projects which have been previously reported in accordance with NI 43-101 standards.
INVESTOR PRESENTATION
▪
Carmen Copper Project Regional Geology and Tenement Location
13
South West view over partial 7.5km of strike from Carmen Main towards Dolores
INVESTOR PRESENTATION
14
Carmen Main – Oxide Mineralisation
INVESTOR PRESENTATION
▪ The Carmen Main copper
oxide/enriched zone forms a
blanket from the surface to around
the 30-40m depth, which is
potentially amenable to a low stripratio, low cost, shallow open pit
mining operation
▪ The known copper oxide
mineralization at Carmen Main is
interpreted from drilling, old
workings, surface exposures and
soil anomalies to be at least 2.8 km
long and 400-800m wide, with less
than 20% of this drilled
Carmen Copper Project – Representative Cross Section
15
Carmen Historical Drilling – Exceptional Oxide Grades from Surface
Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Higher Grade Intersections
Higher grade oxide intervals inside the Carmen NI 43-101 MRE
include;
INVESTOR PRESENTATION
TAB 33: 27.5m @ 1.12% Cu (from 1.5m), incl. 11.5m @ 1.88% Cu
TAB 55B: 19m @ 0.93% Cu (from 9m)
TAB 77: 8m @ 2.10% Cu (from surface)
TAB 82: 2m @ 7.22% Cu (from 20m)
Higher grade oxide intervals outside the Carmen NI 43-101 MRE
include;
CMM 56: 41m @ 2.46% Cu (from surface),
includes 4m @ 17.37% (Tabaco mineralisation)
CMM 35: 39m @ 1.48% Cu (from surface)
CMM 31: 29m @ 1.25% Cu (from surface)
CMM 53: 14.9m @ 1.82% Cu (from 8.1m)
Historic IPBX Drill Core re-logging carried out during the recent site
visits to the Carmen Copper Project
16
Shallow Sulphide Opportunity at Carmen
Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Higher Grade Intersections
Higher grade sulphide intervals below the Carmen NI 43-101 MRE;
INVESTOR PRESENTATION
TAB 031 – Flow banded metasediment containing mainly of Cu sulphides (chalcopyrite) and minor pyrite1
TAB 83: 69m @ 1.37% Cu (from 43m), incl. 24m @ 2.15% Cu & 14m @ 1.77% Cu
TAB 031: 52m @ 0.92% Cu (from 66m)
TAB 01A: 28m @ 1.46% Cu (from 136m), incl. 14m @ 2.27% Cu
▪ Historical Drill intercepts were not assayed for precious metals
▪ 4 significant large geophysical targets identified at depth
1.
The assay grade represented in the image are from the 2m composite half-core sample interval submitted to ALS-Chemex Coquimbo, Chile. Please refer to Annexure C - Carmen Cu Project Historical Drill Holes – Significant Intersections.
17
Maiden Drill
Campaign
ASX:NFL
norfolkmetals.com.au
Maiden Drill Campaign – Drill Collars and Objectives
2025-2026 objectives :
Delineate a substantive copper oxide resource through
extensions to known mineralisation within the Carmen
Main Area
▪
Delineate further sulphide potential beneath Carmen
Main and additional resources from regional targets
INVESTOR PRESENTATION
▪
Maiden Drill Campaign focus on Carmen Main (Q3 2025):
▪
Test the outer limits of the Carmen Main oxide and
sulphide mineralisation
▪
Verify the known mineralisation with twinning of historical
drill holes
▪
Confirm the width and grades of possible high-grade
structures and consequently determine the style and
structural controls on the mineralisation
▪
Up to 50 holes (from 40 drill pads) based on 3,500m of RC
and/or Diamond drilling at Carmen Main, and 1,600m of
Diamond drilling on regional IP targets along the CarmenTabaco Belt (3 holes)
Carmen Copper Project Potential – Proposed drill collars marked in red
19
Carmen Main - Targeting Oxide Resource Expansion
INVESTOR PRESENTATION
▪ Significant potential is recognised outside
of the Carmen Main area from surface soil
sampling with over 2.2km of strike to the
northeast and 3.5km of strike to the
southwest
▪ East of the Carmen Main area, untested Cu
soil anomalies with coincident Cu
mineralisation mapped on the surface will
be drilled as part of Maiden Drill Campaign
(drill collars shown as yellow dots inside
yellow boundary on image right)
20
Kriged Cu in-soil anomalies in the Carmen Main Exploration target area with historic
1962-64 and 2003-2008 drill holes and Norfolk’s proposed drill holes in yellow
Targeting – Regional Resource Expansion
INVESTOR PRESENTATION
▪ Outside of Carmen Main, Induced
Polarization (IP) regional targets (within black
outlines on image) will be explored by
conducting surface sampling, mapping and
drilling to delineate potential copper and/or
gold mineralisation
▪ Maiden Drill Campaign planned for up to 50
holes (from 40 drill sites)
▪ 3,500m of RC and/or Diamond drilling at
Carmen Main
▪ 1,600m of Diamond drilling targeting
regional IP on the Carmen-Tabaco Belt
(targets A, C and D on image right) and 1
target (E) in the Higueritas Belt below known
copper workings and elevated geochemistry
21
Carmen Copper Project Regional Targets
Heap-Leach Column Test Work to Confirm post Drilling
Column 2
Column 3
Total Cu
1.29
0.33
0.95
Soluble Cu
1.22
0.28
0.82
Total Cu
1.33
0.33
0.93
Soluble Cu
1.14
0.29
0.82
kg/t
37.67
26.83
34.67
kg/kg Cu
3.9
9.89
4.62
Soluble Cu
84.69
93.24
91.63
Total Cu%
72.39
82.22
81.02
1/2 inch
1/2 inch
1/2 inch
Irrigation rate {Vhr/m3)
8
8
8
Leach Time Days
28
28
28
UGT-1100%
U GT-3 1 00%
UGT-1 45%
UGT -2 10%
UGT-345%
Head Grade Analysed
Head Grade Calculated
Acid Consumption
Recovery
Parameters
Crush size
Sample composition
Historical column heap leach test work commissioned by PBX
at CIMM Laboratories in Antofagasta, Chile.
▪ Historical column test work performed on 3 samples of
the oxidized metasediments collected from trenches in
the vicinity of 4 drillholes and varying in weight from 105
to 166kg. All samples were subjected to simple column
tests using 5% dilute sulfuric acid over a 48-hour
period on mineralized rock crushed to 100% passing ½”
in columns 1m high and 6” wide.
▪ The metallurgical results obtained in the column tests
returned Cu extractions of between 72.39 and 82.22%.
▪ Other favourable project development factors at the CCP
consist of its modest altitude and ease of site
accessibility using major road networks, proximity to
grid power and other infrastructure.
INVESTOR PRESENTATION
Column 1
▪ These Heap-Leach results will be the basis for
confirmatory work conducted on oxide ore post the
Maiden Drill Campaign completion.
22
Indicative Milestones / News flow
Q3 2025
Drilling permit granted by authorities in Chile (SERNAGEOMIN) – see ASX release July 21st 2025
•
Finalise all stakeholder engagements and contractor inductions
•
Appoint a Transcendence Mining director to Norfolk board
•
Commence Maiden Drill Campaign
•
Shareholder Meeting to approve Tranche 2 placement
INVESTOR PRESENTATION
•
Q4 2025
•
All assays reported from Maiden Drill Campaign
•
Exploration planning and subsequent drill permitting
•
Confirm historical metallurgical test work on copper oxides
23
Thank you
Contact:
Phone: +61 8 6255 8625
Email: info@norfolkmetals.com.au
Web: www.norfolkmetals.com.au
ASX:NFL
norfolkmetals.com.au
Annexure A - NI 43-101 - Mineral Resources and Reserves
Carmen NI 43-101 MRE
Oxide Zone
Resource
Classification
-
Copper
grade (%)
Contained
Metal
-
Indicated
1,827.80
0.59
1078.40
Total
Measured and
1,827.80
0.59
1078.40
Indicated
Inferred
836.1
0.59
493.30
Total
2,663.90
0.59
1,571.70
Resources
Note: reported at a cut-off grade of 0.2% Cu, not capped
Tonnage Copper grade
(kilotonnes)
(%)
-
Total Resource (Oxide+Secondary)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
-
-
Contained
Metal
1,742.60
0.7
1219.82
3,570.40
0.64
2298.22
1,742.60
0.7
1219.82
3,570.40
0.64
2,298.22
1,191.90
0.49
584.03
2,028.00
0.53
1077.33
2,934.50
0.61
1803.85
5,598.40
0.60
3,375.55
INVESTOR PRESENTATION
Measured
Tonnage
(kilotonnes)
Secondary Enrichment
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January 2027 (Carmen NI 43-101
MRE).
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding the Carmen NI 43-101 MRE shown in Table 1:
•
•
•
the Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
a competent person has not done sufficient work to classify the foreign estimate as a mineral resources in accordance with the JORC Code; and
it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to be reported as mineral resources in accordance
with the JORC Code.
25
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
26
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
27
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
28
Annexure A - NI 43-101 - Mineral Resources and Reserves
INVESTOR PRESENTATION
29
Annexure B - Transcendence Mining - Operator Capability Matrix
Carmen Copper Operators – Combined project experience matrix
Project
Status
Nickel
Producing
Acid, Iron, Copper, Gold
Producing
Wetar Copper Heap Leach (lndo)
Copper
Producing
Tujuh Bukit Gold Heap Leach (lndo)
Gold
Producing
Tujuh Buikt Copper (lndo)
Copper
Feasibility
Pani (lndo)
Gold
Construction
King of the Hills (AUS/WA)
Gold
Producing
Lake Cowal Gold Mine (AUS/NSW)
Gold
Producing
North Mara (Tanz)
Gold
Producing
Copper (Au)
Producing
Kanowna Belle Gold Mine (AUS/WA)
Gold
Producing
San Gregorio (Uruguay)
Gold
Producing
SCM Nickel Mine (lndo)
Acid Iron and Metals (lndo)
Palabora Copper (South Africa)
Exploration
Feasibility
Development
Financing
INVESTOR PRESENTATION
Commodity
30
Annexure C - Carmen Cu Project Historical Drill Holes – Significant Intersections
Minimum intercept width 4m, except for over known veins Intercepts calculated using 0.2% Cu cutoff and allowing up to 4m of internal waste
Coordinates based on WGS84, UTM zone 19S
RL is taken from best fit to EOS surface
Hole_ID
Easting
Dip
Azim
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CARMEN
CMM 1
CMM 2
CMM 3
CMM 4
CMM 4
CMM 5
CMM 6
CMM 6
CMM 7
CMM 8
CMM 9
CMM 10
CMM 11
CMM 11
CMM 12
CMM 12
CMM 13
CMM 14
CMM 15B
CMM 16B
CMM 16B
CMM 17
CMM 18
CMM 19
CMM 20
CMM 21
CMM 22B
CMM 23
CMM 24
CMM 24
CMM 25
CMM 25
CMM 26
CMM 27
CMM 27
CMM 29
CMM 30
CMM 31
CMM 31
CMM 34
CMM 35
CMM 36
CMM 36
CMM 37
CMM 38
CMM 39
CMM 39
CMM 40
363356
363379
363301
363371
Northing RL_Terrain
6826850
6826875
6826890
6826805
2020
2018
2031
2029
-90
-90
-45
-90
0
0
315
0
Total Depth (m) From (m)
35
46
26
36
363416
363496
6826800
6826855
2031
2007
-90
-90
0
0
42
76
363511
363546
363576
363616
363601
6826880
6826880
6826940
6826925
6826895
2004
2004
2003
1996
2003
-60
-60
-55
-60
-60
45
50
75
170
160
43
24.5
23.1
14
31
363561
6826855
2012
-60
155
29
Share your feedback
Discover