Norfolk to earn-into Chilean Copper Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX:NFL
31st March 2025
Norfolk to earn-into Chilean copper project with significant
oxide and sulphide resource potential
Transformational acquisition opportunity with highly experienced
in-country team to expedite resource growth and development potential
•
Norfolk has entered into a binding earn-in agreement (Agreement) for the Carmen Copper Project (CCP
or Project) in the highly prospective Atacama Region in Chile.
•
Norfolk has the right to earn up to 100% of the issued capital of Transcendentia Mining Pty Ltd, which
holds an exclusive option over the Project, by funding A$3M of exploration expenditure over a three-year
period (Transaction).
•
CCP is complimentary to Norfolk’s existing assets with copper providing shareholders exposure to the
growing demand and favorable pricing for copper, driven by sectors like electric vehicles and renewable
energy, with pricing nearing record levels
•
Large-scale 46.6km2 concession package located 82km from the major mining centre of Vallenar in the
Huasco Province, Atacama Region in Chile.
•
The Project hosts a historical copper oxide mineral resource estimate of 5.6Mt at 0.6% Cu reported in
accordance with Canadian National Instrument 43-101 (Carmen NI 43-101 MRE). 1,2
•
High-grade oxide intervals inside the Carmen NI 43-101 MRE;
TAB 33: 27.5m @ 1.12% Cu (from 1.5m), incl. 11.5m @ 1.88% Cu
TAB 55B: 19m @ 0.93% Cu (from 9m)
TAB 77: 8m @ 2.10% Cu (from surface)
TAB 82: 2m @ 7.22% Cu (from 20m)
•
High-grade sulphide intervals below the Carmen NI 43-101 MRE;
TAB 83: 69m @ 1.37% Cu (from 43m), incl. 24m @ 2.15% Cu & 14m @ 1.77% Cu
TAB 31: 52m @ 0.92% Cu (from 66m)
TAB 01A: 28m @ 1.46% Cu (from 136m), incl. 14m @ 2.27% Cu
•
High-grade oxide intervals outside the Carmen NI 43-101 MRE;
CMM 56: 41m @ 2.46% Cu (from surface), includes 4m @ 17.37% Tabaco Vein
CMM 35: 39m @ 1.48% Cu (from surface)
CMM 31: 29m @ 1.25% Cu (from surface)
CMM 53: 14.9m @ 1.82% Cu (from 8.1m)
•
Experienced operators Transcendence Mining Pty Ltd to be appointed as CCP operators with the right to
appoint a board nominee to Norfolk. Transcendence brings a wealth of exploration, metallurgy,
engineering, financing and heap leach expertise.
1
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January
2027 (Carmen NI 43-101 MRE).
2
The Carmen NI 43-101 MRE is a historical foreign estimate (within the meaning of the ASX Listing Rules) and is not reported in accordance
with the JORC Code and a Competent Person (within the meaning of the JORC Code) has not done sufficient work to classify the foreign
estimates as Mineral Resources in accordance with the provisions of the JORC Code. It is uncertain that following evaluation and further
exploration work that the foreign estimates will be able to be reported as Mineral Resources in accordance with the provisions of the JORC
Code.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
•
Alex Raab to be appointed General Manager, Exploration, in Chile, bringing over 30 years exploration and
resource development experience in Latin America and North America.
•
The Project has significant copper oxide and copper sulphide exploration potential with over 7.5km of
untested strike length along prospective structures and favourable stratigraphy with significant
geochemical anomalism.
•
Test work has demonstrated high copper solubilities (~72-82%) within the copper oxide ore zone
conducive to proven and cost-effective heap-leaching processing methods and cost-effective
development. (See “Historical Heap-Leach Column Test Work and Amenability to Heap Leaching”)
•
Firm commitments for A$1m capital raising in support of the Transaction including commitments from
Transcendence Mining directors and Norfolk Board, subject to shareholder approval.
Norfolk’s Executive Chairman, Ben Phillips, comments;
“I am pleased to announce this transformational opportunity for Norfolk. We have secured the right to earn-in to a
highly prospective, scalable, value accretive and easily accessible copper project in one of the most prolific
copper producing areas in the world. The Project area is approximately 82 km to the South of Vallenar and only 16
km South of the Relincho copper project, which is held by the Nueva Unión joint venture between Teck and
Newmont Goldcorp. Outside of the known Carmen resource area, which is open along strike and at depth, there
is also 7.5km of highly anomalous untested strike length across the concession package hosting numerous
compelling drill-ready targets. The Project area is known to host both oxide and sulphide mineralisation as
evidenced by past drilling intercepts. With further drilling we are aiming to rapidly expand the oxide resource in the
near term, which is conducive to heap-leaching and amenable to efficient and cost-effective development. Aside
from the oxide resources, we believe there is also significant sulphide potential with several high-grade sulphide
intercepts worthy of follow-up drilling programs. We look forward to keeping our shareholders updated as we
progress our involvement in the Project in partnership with the Transcendence Mining team.”
Image 1: View looking south-west along Carmen Cu - Tabaco project Structural Trend
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
2
ASX ANNOUNCEMENT
Image 2: TAB 023 – Brecciated metasediment containing Cu oxides (atacamite, chrysocolla and
disseminated copper wad along fractures and clast rims)3
Image 3: TAB 031 – Flow banded metasediment containing mainly of Cu sulphides (chalcopyrite)
and minor pyrite3
Image 4: Team on site reviewing historical drill core
3
The assay grade represented in Images 2 & 3 are from the 2m composite half-core sample interval submitted to ALS-Chemex Coquimbo,
Chile. Please see Table 2 in the back of the JORC Table 1 for details.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
3
ASX ANNOUNCEMENT
Norfolk Metals Ltd (Norfolk or the Company) has entered into a binding earn-in agreement with Transcendence
Mining Pty Ltd (Transcendence) (Earn-in Agreement) to fund A$3 million in exploration expenditure over a threeyear period to acquire 70% of the issued capital of Transcendence’s subsidiary, Transcendentia Mining Pty Ltd
(Transcendentia), which holds an option over the Carmen Copper Project (CCP or the Project), whilst also
granted an option to acquire the remaining 30% on completion of the earn-in (Transaction).
The exploration and exploitation licences comprising the Project are held by several Chilean companies and
individuals (Owners). Transcendence’s subsidiary, Carmen Copper SpA (Carmen Chile), has entered into a
binding agreement under which Carmen Chile has the exclusive right to acquire 100% of the Project subject to
making certain annual option payments over a five-year period to the Owners (Option Agreement).
An interest in the Carmen Copper Project provides shareholders with exposure to the rising demand and current
favourable pricing environment for copper. Copper is essential for various sectors, including electric vehicles,
renewable energy, and infrastructure, all of which are seeing significant growth. Some analysts have already
predicted US$12,000 per tonne this year 4a, a price which is almost within reach today.
The Transaction will see Norfolk and Transcendence form a joint operating committee (2:2) to oversee and
coordinate implementation of targeted exploration programs at the Project over the initial 3-year term during which
Norfolk is required to fund A$3 million in exploration expenditure (Earn-in Period).
Jason Greive and David Fowler will be appointed as Transcendence’s operating committee members who,
together with their team, will bring in-country expertise to further exploration and development of the Project. The
Transcendence team will leverage their previous experience in Chile and their operating and project management
expertise.
During the Earn-in Period, it is proposed that the operating committee will develop annual exploration work
programmes and budgets as required to meet earn-in commitments at the Project which will be approved from
time to time by Norfolk. Subject to satisfying the A$3 million funding requirement within the Earn-in Period, Norfolk
is granted the right to acquire the remaining 30% of the issued capital of Transcendentia in consideration for
certain share-based payments to Transcendence.
Annexure A includes the material terms of the Earn-in Agreement and Option Agreement.
Overview – Carmen Copper Project
The Carmen Copper Project is in the Huasco Province, Atacama Region in Chile, which is currently the world's
largest copper producing nation.4b The Project encompasses twenty-two contiguous exploration and exploitation
licenses totalling 46.6km2 (Figure 1, Figure 2).
The Project hosts multiple mineralised targets over an extensive 7.5km strike length with intensive copper
mineralisation from surface.
Only 16km to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión
is currently developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) porphyry deposits
with proven and probable mineral reserves classified in accordance with NI 43-101 totalling approximately 16.6
billion pounds of copper, 8.9 million ounces of gold, and 464 million pounds of molybdenum. 5
Whilst the Project currently presents as a copper oxide project with highly soluble copper oxide mineralisation
from surface; it also hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant
further investigation and follow-up drilling programs.
4a
https://www.mining.com/copper-price-touches-new-high-as-traders-predict-12000/.
https://www.nasdaq.com/articles/top-10-copper-producers-country.
5
Refer to Annexure D for information relating to the Relincho and Fortuna mineral resources and reserves reported in accordance with NI 43101.
4b
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
4
ASX ANNOUNCEMENT
Norfolk has now completed two reconnaissance field trips to the Project to assess historical core, drill collars,
conduct mapping, review infrastructure including water and power access, exploration camp establishment,
meet with drilling contractors and stakeholders and assess permitting obligations. These trips have allowed
Norfolk, in consultation with the Vendors, to define multiple drill-ready target locations over the 7.5kms of strike,
which are expected to be further investigated this year.
Mantos Blancos
445mt @ 0.58% Cu
2.59mt contained Cu
Mantoverde Project
2.34bt @ 0.37% Cu
8.58mt contained Cu
Candelaria Complex
622mt @ 0.47% Cu
2.1mt contained Cu
Figure 1: Carmen Cu Project Location
Please refer to Annexure D for information relating to the mineral resources and reserves classifications for each
of the Mantos Blancos Mine, Mantoverde Project and Candelaria Copper Mining Complex which have been
previously reported in accordance with NI 43-101 standards.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
5
ASX ANNOUNCEMENT
Figure 2: Project tenure
Climate and topography – Carmen Copper Project
The Project can be accessed by road from the historic mining town of Vallenar, with a readily available workforce.
The nearest communities are located 12km south of the Project. The Project is located within a rolling plateau
region between the elevations of 1,950m to 2,250m above sea level. The local climate is semi-arid with summer
temperatures ranging from 10 to 25oC and winter temperatures ranging from 0 to 15oC. Rainfall within the Project
area is sparse.
The Project comprises thirteen exploitation and nine exploration contiguous concessions covering 4,663ha
(Figure 2). Exploitation concessions are of indefinite duration in Chile and overlapping exploitation leases are not
allowed.
The Project is 12km from the national electrical grid, which has three-phase power, and is within 180km of three
major ports.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
6
ASX ANNOUNCEMENT
Image 5: Carmen Copper Project - historical workings along dominant structural corridors trending NE 050°
and NNW 340°
Historical Work – Carmen Copper Project
The Carmen Copper Project contains 149 historical holes of reverse circulation (RC) and diamond drilling (DD)
totaling 10,513.35 meters. From the late 1800’s to 1960’s there was small scale high-grade artisanal copper mining
in the area.
Between 1962 and 1964, Minera Metalmine Ltda. (MML) drilled 56 shallow percussion holes for 1,680 meters to
evaluate leachable copper resources for open pit mining.
In 2002, Minera IPBX Chile Limitada (MIPBX) of International PBX Ventures Limited (IPBX) explored the Project.
Work by IPBX initially included 29 km of ground magnetics and 30 km of induced polarization (IP), defining a NE
striking elongated chargeability anomaly 100 - 300 meters wide and 2,400 meters long in the area drilled by MML.
In mid-2003, IPBX drilled 25 RC and DD holes, to investigate the IP chargeability anomaly over Carmen, with two
holes also into Tabaco for 3,685.95m. Most Carmen holes intersected some copper bearing sulphides, and several
returned promising Cu grades in oxides.
In early 2004, mapping and additional soil sampling by IPBX confirmed the extent of the copper oxide zone over
the chargeability anomaly and delineated further Cu + Au anomalies to the west and stratigraphically up section.
In 2006, IPBX completed 67 DD holes for 4,650.2 meters, and infilled ~600 meters of strike at Carmen at ~ 50m
spacing, with step out holes over a further 400 meters of strike, plus a few scout holes on the northern hanging
wall of the Carmen-Tabaco thrust fault and at the Tabaco project area. At Carmen, thick sulphide zones were
confirmed in several holes, but not all holes testing areas of known oxide confirmed the historic work that had
returned results previously.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
7
ASX ANNOUNCEMENT
In January 2007, SRK delivered the Carmen NI 43-101 MRE6 for the Carmen oxide zone (COZ) which delivered a
combined mineral resource estimate (Oxide and Secondary Enrichment; Indicated + Inferred) of 5.6Mt at 0.6% Cu,
as shown in Table 1 below.
Oxide Zone
Resource
Classification
Measured
Tonnage
(kilotonnes)
-
Copper
grade (%)
Secondary Enrichment
Contained
Metal
-
Indicated
1,827.80
0.59
1078.40
Total
Measured and
1,827.80
0.59
1078.40
Indicated
Inferred
836.1
0.59
493.30
Total
2,663.90
0.59
1,571.70
Resources
Note: reported at a cut-off grade of 0.2% Cu, not capped
Tonnage Copper grade
(kilotonnes)
(%)
-
Total Resource (Oxide+Secondary)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
-
-
Contained
Metal
1,742.60
0.7
1219.82
3,570.40
0.64
2298.22
1,742.60
0.7
1219.82
3,570.40
0.64
2,298.22
1,191.90
0.49
584.03
2,028.00
0.53
1077.33
2,934.50
0.61
1803.85
5,598.40
0.60
3,375.55
Table 1: Carmen NI 43-101 MRE
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in Table 1:
•
•
•
the Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
a competent person has not done sufficient work to classify the foreign estimate as a mineral resources in
accordance with the JORC Code; and
it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able
to be reported as mineral resources in accordance with the JORC Code.
The original MML (1962-1964) drill data was not available to be reviewed by SRK and therefore it was not included
in Carmen NI 43-101 MRE. The results of the step out holes to the NE and SW also were not considered in the
Carmen NI 43-101 MRE.
Between October 2012 and February 2013, QRS Spa on behalf of QRS Capital completed reconnaissance
mapping and rock sampling on the Carmen-Tabaco Trend. 43.2-line kilometers of time domain IP and 417.5-line
kilometers of magnetic surveys were carried out to verify the characteristics of the anomalies detected in previous
geophysics and to explore the entire area at reconnaissance level. This confirmed the Carmen-Tabaco copper,
silver and gold trend/belt has at least 8.5 kilometers of strike and defined at least 6 new exploration targets;
including one beneath Carmen, and an additional sub-parallel 7.5km long geophysical anomaly was identified in
the east.
6
Carmen NI 43-101 MRE. Information required by ASX Listing Rule 5.12 is included at Annexure B.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
8
ASX ANNOUNCEMENT
Image 6: Historic IPBX Drill Core re-logging carried out during the recent site
visits to the Carmen Copper Project
Regional Geology
The Carmen Copper Project is situated on the western flank of the prospective Pre-Cordillera of Chile within the
regionally extensive north trending San Felix Fault and Fold System (Figure 3). This belt hosts numerous copper,
gold and silver deposits in IOCG, Manto Cu, porphyry and epithermal systems, including Relincho and Fortuna
(El Morro).
The Relincho copper-moly porphyry project (2.25Bt @ 0.37% Cu, 0.015% Mo) is approximately 16km to the
north-northeast of the Project.7 The Fortuna (El Morro) copper-gold porphyry project (1.37Bt @ 0.42% Cu, 0.38g/t
Au) is located approximately 45km to the east of the Project.7 The Relincho and Fortuna projects are jointly held
by Teck and Newmont as part of the Nueva Unión joint venture.
7
Refer to Annexure D for information relating to the mineral resources and reserves classifications for the Relincho and Fortuna Projects
which have been previously reported in accordance with NI 43-101 standards.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
9
ASX ANNOUNCEMENT
Figure 3 – Carmen Copper Project Regional Geology and Tenement Location
Within the Project area, copper-silver workings occur along two main NE-SW trending belts in volcanosedimentary rocks:
1. The Carmen-Tabaco Belt is 8.5km long and hosts most mineralisation at surface, and in the old workings.
Mineralisation is mainly hosted in calc-silicate altered and locally skarnified volcanics, sediments and dacitic
porphyritic bodies and includes copper and silver (oxide and sulphide) accompanied by low-grade gold. A
younger epithermal style of quartz-sericite alteration and copper-gold overprints the banded hornfels and
hematised andesite in the vicinity of the Tabaco, Carmen and Dolores project Faults. In these areas, highgrade poly-metallic veins & shears occur in the historic workings, which are generally 1-3m wide.
2. The Higueritas Belt is 7.5km long, from 0.5 to 1km wide and sub parallels the Carmen-Tabaco Belt. Sporadic
old workings are known from this area, but no drilling is available, with data limited to geophysics, and some
rock samples.
Project Geology and Mineralisation
The main Carmen mineralisation is known from old workings, surface showings and soil anomalies to cover a
2.8km long portion of the Carmen-Tabaco belt and includes copper and silver and weak gold (oxide and sulphide).
In the north/northwest, the geology consists of a thick group of NW dipping Triassic sediments and feldspathic
andesite that are generally altered to banded calc-silicate hornfels and locally skarn. This group dips steeply to
the NW and is assigned to the Carmen-Tabaco-Unit. Feldspar porphyritic andesitic flows with minor sediment
overlie the banded hornfels. These are also hornfels, epidote-chlorite altered, and locally contain oxide copper
minerals (Figure 4).
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
10
ASX ANNOUNCEMENT
Figure 4: Carmen Copper Project Local Geology
The Triassic units are thrust over the underlying Jurassic sequences by the Tabaco Thrust. Around the Carmen
project, the thrust is intruded by quartz-feldspar rhyolite. Within the rhyolite, disseminated, fracture and veinrelated copper has been observed, often associated with late NNW to NNE trending structures.
In the south, the Jurassic footwall sequences are comprised of two, steeply NW dipping units. Immediately
beneath the Tabaco Fault banded meta-sediments similar to the Carmen-Tabaco-Unit are present. Porphyritic
andesitic to dacitic pyroclastics and lava flows underlie these units, and are generally unaltered, except near cross
cutting faults, and beneath the banded hornfels units.
At the Tabaco project, mineralisation is defined at surface by a NE-trending vein of crystalline quartz with hematite,
which is 0.5-1m wide, and traceable over ~200m. Mineralisation occurs in veinlets and disseminated within
hematised andesites. The vein has been worked by pits, shafts and underground (open stope) workings. Around
Carmen, copper is mainly hosted within a banded calc-silicate hornfels + skarn unit containing three prominent
chalcopyrite-magnetite-pyrite bands, and in epidote and calc-silicate altered sedimentary and volcanic units. The
lowermost calc-silicate band hosts most copper occurrences including the Carmen Oxide Zone (COZ). Silicified
volcanics and quartz-feldspar porphyritic rhyolite units also host significant copper locally.
In the central part of the COZ, the Project contains numerous pits, and underground workings, located on NS,
NNW, NNE and NE trending faults. The main poly-metallic vein-hosted high-grade ore occurs at the intersection
of these. Most of these veins are < 2-3m wide in the workings.
Recent drilling at Carmen has defined a modest grade copper-oxide deposit over approximately 600m strike, with
sporadic drill intercepts beyond this for an additional 400m of strike to the north and 100m to the south (Figure 5).
The oxide zone is quite continuous between drill holes and sections along structural and lithology-controlled
zones, which are sub-parallel to the Tabaco Thrust. The oxidized/enriched horizon is not constrained by rock types.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
11
ASX ANNOUNCEMENT
Figure 5: Carmen Copper Project Potential - Open in all directions
Copper oxide minerals mainly comprise chrysocolla, atacamite, brochanthite and copper wad or pitch. This
mineralisation occurs associated with sericitization and/or silicification in the Tabaco and Carmen structures.
Away from these structures in the COZ, copper minerals occur with cupriferous iron and manganese oxides in
leached calc-silicate hornfels and locally with pyroxene skarn and rhyolite.
In the west, high-grade copper sulphides have been intersected down dip from the COZ in one or more bodies
coincident with an IP target. The copper sulphides are largely unexplored but appear to be associated with one or
more open ended bodies, which can be traced discontinuously along strike for around 350m. The main body
ranges from 10-60m wide based on limited data and has been intersected in drilling to at least 200m below the Cu
oxides in TAB-083. The copper sulphides remain open downdip to the northwest and IP data suggests these may
continue to 350m depth. The main sulphide body is developed within calc-silicate hornfels, chlorite-epidote +
silica altered metasediments and silicified volcanics (including quartz-feldspar porphyry).
Sulphide mineralisation, with potential gold and silver, in the skarnified horizons consists primarily of chalcopyrite,
magnetite and lesser pyrite. All occur as massive bands up to 5cm thick, irregular patches, veinlets and
disseminations.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
12
ASX ANNOUNCEMENT
The Carmen NI 43-101 MRE was defined over 600m of strike, to a depth of 30m in the COZ. 8 The mineralisation
remains open to the northeast, southeast and southwest, with potential considered excellent to significantly
increase the existing resource. The main oxide/enriched zone also forms a blanket from the surface to around the
30m depth, which is very amenable to a low strip-ratio, low cost, shallow open pit mining operation (Figure 6).
Figure 6: Carmen Copper Project – Representative Cross Section
The Carmen NI 43-101 MRE used 74 of the 92 holes drilled from 2003 and 2006 which corresponds to 6,637 meters
of RC and HQ3 (TT) diamond coring. None of the percussion holes from 1962-1964 were used for the Carmen NI
43-101 MRE as original data was not available. The Carmen NI 43-101 MRE covers less than 60% of known Cuoxides in the area and excludes areas tested by historic higher-grade percussion drilling.
The COZ is interpreted from drilling, old workings, surface exposures and soil anomalies to be at least 2.8 km long
and 400-800m wide, with less than 20% of this drilled. Within the COZ, soils have defined two sub-parallel zones
(Figure 7), which strike in a northeasterly direction. The western zone contains all past drilling and hosts the openended resource. Soil values >200ppm Cu are coincident with the known Cu-oxides; those anomalies >400ppm
are generally above known sulphides. Outside of the drill tested area, anomalies of similar or higher tenor remain
undrilled along strike to the northeast and southwest; in the south/southeast, and to the north/northwest.
Along the Carmen-Tabaco Belt, significant potential is recognized outside of the COZ from surface soil sampling
over 2.2km of strike to the northeast and 3.5km of strike to the southwest. These areas contain similar stratigraphy,
favorable structures, and known geophysical anomalies (Figure 8). North of the COZ, mapping indicates that there
is potential for 2 additional copper bearing horizons, based on the occurrence of prospective rock units with
known soil anomalies.
8
Carmen NI 43-101 MRE. Information required by ASX Listing Rule 5.12 is included at Annexure B.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
13
ASX ANNOUNCEMENT
Figure 7: Carmen Copper Project – Soil contours over Carmen Main with historical drill collars
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
14
ASX ANNOUNCEMENT
Figure 8: Carmen Copper Project – IP Chargeability (250m depth) with Targets identified over the CarmenTabaco Belt & the Higueritas Belt
Exploration and Operational Committee – Carmen Copper Project
Jason Greive and David Fowler are proposed to be appointed as Transcendence’s operating committee members
who, together with their team, will bring in-country expertise to further exploration and development of the Project.
Alex Raab will also be appointed General Manager, Exploration, in Chile.
The Transcendence Mining team are experienced mining executives, operators and project development
professionals with significant Chilean and South American expertise.
Jason Greive – Director, Transcendence Mining
Mr Greive is an experienced international mining executive and project development professional with over 30
years of corporate, operational and project development experience in gold, copper, iron ore and base metals. He
specializes in building high performance teams and providing the leadership and strategic navigation required to
develop new mining projects into successful operations. Mr Greive has worked for several multinational mining
houses such as Barrick Gold, Placer Dome, Rio Tinto, North Ltd and Evolution Mining across numerous
jurisdictions including Sweden, South Africa, Tanzania, Indonesia and The Philippines. In his more recent roles
with Evolution Mining as General Manager of the Cowal Gold Mine (NSW) and Red 5 as Chief Operating Officer, he
was instrumental in the initiation, navigation, leadership and delivery of significant expansion and greenfield
development projects at Cowal and King of the Hills operations.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
15
ASX ANNOUNCEMENT
David Fowler – Director, Transcendence Mining
Mr Fowler is a finance professional with over 35 years of financial & mining industry experience. As the CFO at
Merdeka Copper Gold, he has been instrumental in funding the growth of the group from a single asset gold project
into a multi-commodity business with an enterprise value of US$9 billion in 2024. He has led debt & equity funding
processes to raised more than US$400 million in equity and US$4 billion in debt during this time. Mr Fowler has
worked in numerous other executive roles including CEO of Orosur Mining, a South American focused gold
company producing 100,000 ounces of gold per annum and Finders Resources Limited that operated the 20,000tonne per annum Wetar copper heap leach project.
Alex Raab - General Manager Exploration
Norfolk’s technical and in-country capability will be further enhanced by the appointment of Mr Alex Raab, who
has over 30 years exploration and resource development experience in Latin America and North America. He has
worked for several major mining & junior exploration companies including: Homestake Mining, Kennecott
Minerals, MIM Exploration, Farwest Mining, Chapleau Resources, Uruguay Minerals, Orosur Mining, Golden Rim
Resources, Challenger Gold and others. His experience includes; epithermal Au-Ag/poly-metallic, sedimenthosted Au, shear zone hosted lode-gold, Au-Cu, and Au porphyry; IOCG deposits, magnetite, and other industrial
commodities.
Image 7: Mr Alex Raab (back) and Mr Leo Pilapil (front) reviewing plan maps during site visits to the Carmen
Copper Project
Alex’s notable recent and relevant exp
Share your feedback