ASX ANNOUNCEMENT
ASX: NFL
31st July 2025
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 JUNE 2025
Norfolk Metals Limited (ASX:NFL) (Norfolk or the Company) is pleased to report on its activities during the 3month period ended 30 June 2025.
Highlights (including price-sensitive releases post-quarter end)
-
-
Norfolk proceeds with an earn-in agreement for the Carmen Copper Project in the highly prospective
Atacama Region in Chile (See announcement 13th June 2025)
Firm commitments for A$3.5m capital raising in support of the Transaction, including commitments from
Project Operators and Norfolk Board, subject to shareholder approval at Extraordinary General Meeting
(See announcement 28th July 2025)
Carmen Copper Project Drill Permit Granted (See announcement 21 st July 2025)
Strong capital position at June 30th 2025 with A$2.10m in cash, with a further US$145,742 in Chile held by
Norfolk legal representation as a receivable to be utilised for future Carmen Copper exploration
expenditure as of June 30th 2025
Orroroo Uranium Project
-
Work is continuing to further delineate prospective uranium targets for future exploration drilling
Norfolk proceeds with earn-in at Carmen Copper
On the 13th June 2025 Norfolk Metals Limited (“Norfolk”, the “Company” or ASX.NFL) referred to its
announcement dated 31 March 2025 regarding entry into a binding earn-in agreement (Earn-in Agreement) with
Transcendence Mining Pty Ltd (Transcendence) to acquire up to 100% of the issued capital of Transcendence’s
wholly owned subsidiary, Transcendentia Mining Pty Ltd (Transcendentia), which holds an option to acquire the
Carmen Copper Project (CCP or Project) in the highly prospective Atacama Region in Chile (Transaction).
As set out in Norfolk’s 31 March 2025 market release, pursuant to the terms of the Earn-in Agreement, the
Company can acquire 70% of the issued capital of Transcendentia upon the Company incurring expenditure of $3
million at the Project over a three-year period. June 13th 2025 Norfolk advised all conditions precedent to the
Transaction were satisfied and Norfolk would proceed with the earn-in for the Stage 1 Period.
Firm Commitments for $3.5m Capital Raise
July 28th 2025 saw the Company announce it had received firm commitments to raise $3.5 million (before costs)
towards funding the Transaction and the continually expanding exploration plans of the Project (Placement).
Norfolk board, Transcendence Mining directors and existing shareholders all participated with commitments to
the placement.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
The binding Placement will comprise the issue of 28,000,000 new shares in the Company (Shares) to be issued
using the Company’s existing placement capacity pursuant to ASX Listing Rules 7.1 (7,806,140 Shares) and 7.1A
(5,204,093 Shares), totalling 13,010,233 via Tranche 1 and 14,989,767 via Tranche 2 (subject to shareholder
approval). Refer to the Company’s Appendix 3B lodged 28 July 2025, for further details.
The Placement issue price of $0.125 represented a 14.3% discount to the 15-day the volume weighted average
price (VWAP) of $0.14. New Shares to be issued under the Placement will rank equally with the Company's existing
fully paid ordinary shares.
JP Equity Partners acted as Lead Manager to the Placement.
Overview – Carmen Copper Project
The Carmen Copper Project is in the Huasco Province, Atacama Region in Chile (Figure 1). The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km 2.
The Project hosts multiple mineralised targets over an extensive 15km plus strike length (over two regional belts)
with intensive copper mineralisation from surface (Figure 2)
Only 16km northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is
currently developing the “Multi-Billion-Dollar Relincho and Fortuna”# porphyry deposits (Figure 1).
The Carmen Copper Project contains 149 historical holes of reverse circulation (RC) and diamond drilling (DD)
totaling 10,513.35 meters (Figure 2). From the late 1800’s to 1960’s there was small scale high-grade artisanal
copper mining in the area.
Between 1962 and 1964, Minera Metalmine Ltda. (MML) drilled 56 shallow percussion holes for 1,680 meters to
evaluate leachable copper resources for open pit mining.
In 2002, Minera IPBX Chile Limitada (MIPBX) of International PBX Ventures Limited (IPBX) explored the Project.
Work by IPBX initially included 29 km of ground magnetics and 30 km of induced polarization (IP), defining a NE
striking elongated chargeability anomaly 100 - 300 meters wide and 2,400 meters long in the area drilled by MML.
In mid-2003, IPBX drilled 25 RC and DD holes, to investigate the IP chargeability anomaly over Carmen, with two
holes also into Tabaco for 3,685.95m. Most Carmen holes intersected some copper-bearing sulphides, and
several returned promising Cu grades in oxides.
# - https://www.miningandenergy.ca/read/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 1: Carmen Cu Project Location
In early 2004, mapping and additional soil sampling by IPBX confirmed the extent of the copper oxide zone over
the chargeability anomaly and delineated further Cu + Au anomalies to the west and stratigraphically up section.
In 2006, IPBX completed 67 DD holes for 4,650.2 meters, and infilled ~600 meters of strike at Carmen at ~ 50m
spacing, with step out holes over a further 400 meters of strike, plus a few scout holes on the northern hanging
wall of the Carmen-Tabaco thrust fault and at the Tabaco project area. At Carmen, thick sulphide zones were
confirmed in several holes, but not all holes testing areas of known oxide confirmed the historic work that had
returned results previously.
In January 2007, SRK delivered the 5.6Mt at 0.6% Cu MRE reported in accordance with Canadian National
Instrument 43-101 (Carmen NI 43-101 MRE)(See announcement 31st March 2025 and Annexure A below).
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in Table 1:
• The Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
• A competent person has not done sufficient work to classify the foreign estimate as a mineral resource in
accordance with the JORC Code; and
• It is uncertain that following evaluation and/or further exploration work that the foreign estimate will be
able to be reported as mineral resources in accordance with the JORC Code.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 2: Carmen Main Exploration target area with historic 1962-64 and 2003-2008 drill holes and Maiden Drill
Campaign planned drill holes.
Maiden Drill Campaign and Permitting
On the 21st of July 2035 Norfolk announced the official permission to commence the Maiden Drill Campaign at the
Carmen Copper Project had been granted by Servicio Nacional de Geología y Minería (SERNAGEOMIN, National
Geology and Mining Services). The Maiden Drill Campaign comprises up to 50 holes (from 40 drill sites) based on
up to 3,500m of RC and/or Diamond drilling at Carmen Main, and 1,600m of Diamond drilling on regional IP targets
along the Carmen-Tabaco Belt (see ASX release 12th May 2025).
The high-priority objective of the Maiden Drill Campaign (Figure 2) is to delineate potential extensions of the known
copper mineralisation for additional ore tonnage of near-surface leachable copper in oxide and/or supergeneenriched zones at Carmen Main. The program includes a mixture of scout, step out, and verification drilling and
will include:
•
Assessment of the different styles of mineralisation. Low-moderate grade, skarn-style oxide Cu
comprising the bulk of the Carmen NI 43-101 MRE; however, potential exists to delineate higher grades in
narrower vein/vein zones and in quartz-feldspar porphyry units in the vicinity of known workings.
•
Testing the extensions of potential oxide mineralisation to the northeast, where 1960’s drilling has
returned thick copper intervals near the Tabaco Thrust.
•
A fence of holes is planned in the southwestern limits of the Carmen NI 43-101 MRE area to gain a better
understanding of the geometry of the interpreted oxide and sulphide mineralisation.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
•
Step out drilling to confirm potential oxide extensions of the mineralisation in the southwest (3 sections
approximately 200m apart), where 1960’s drilling has locally returned thick copper intervals beneath soil
anomalies over 450m of strike (Figure 3).
Figure 3: Geology of the Carmen Main Exploration target area with historic 1962-64 and 2003-2008 drill holes and
Norfolk’s planned drill holes
•
Initial testing for possible extensions of oxide mineralisation associated with favourable hanging wall
units to the north of Carmen Main.
•
In the eastern zone of Carmen Main, soil anomalies of similar or higher tenor to the Carmen Main soil
anomalies remain undrilled in the andesite units, which locally contain quartz veins. This area will be
drilled on two sections located 500m apart, beneath Cu soil values of 1.5% and 0.56% (Figure 4).
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 4: Kriged Cu in-soil anomalies in the Carmen Main Exploration target area with historic 1962-64 and
2003-2008 drill holes and Norfolk’s planned drill holes.
Additional objectives for the Maiden Drill Campaign are delineating potential new exploration targets based on
geophysics associated with coincident IP Chargeability (Figure 5) and Resistivity anomalies. There also appears
to be a strong correlation between the relative positions/trend of anomalous Cu grades in soils (Figure 4) and
anomalous IP chargeability, suggesting possible sulphide mineralisation at depth. This relationship can be
confirmed by selectively drilling the observed Cu mineralisation on the surface with a coincident IP anomaly at
depth. This relationship could provide an important vector to define high-grade Cu mineralisation. The intent is to
drill collars A, C, D and E as seen on Figure 5.
Figure 5: Carmen Copper Project Regional Targets
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Operations Camp
An established facility has been contracted as the Carmen Copper Operations Camp located in the town of Alto
del Carmen with full accommodations for the Exploration Team and Drilling Contractors, as well as the logging
and processing Core Shack. Alto del Carmen is a small, town-oriented community located approximately 1 hour
from the Carmen Copper Project and 1 hour from Vallenar (mining town with all services) via a sealed road (Figure
6).
Figure 6: Location of Alto del Carmen, where the company has secured an established Operations Camp, offices, and
core shed
Alto del Carmen offers all basic services and the company has organised to contract an established camp with
full-service accommodation for employees and sub-contractors. Supermarkets, restaurants, local public
services, hardware stores, medical post, and police services are available locally. The camp features cabin-style
lodging with modern plumbing, kitchenettes, and sanitary facilities. A mess and food service for 20 persons will
service the team and contractors 24 hours/day. The Core Shack has complete 380V three-phase electric power
and water sources. An industrial water source for drilling is also located in Alto del Carmen, and the company has
secured an agreement to source the water required for the Maiden Diamond Drilling Program at the Carmen
Copper Project.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figures 7 & 8: Villas at Alro del Carmen Operations Camp entry and Accommodations
Existing project developments in the reporting period
Both the Orroroo Uranium Project and the Roger River Project have progressed with prospective planning
undertaken for future exploration however the focus was limited during the quarter due to finalisation of the
Carmen Copper Project transaction.
Norfolk has previously announced the intention to consider further geophysics for target generation at the Orroroo
Uranium Project (Figure 9). The Company has been working with Orroroo stakeholders via the Company's local
correspondent to build a database of existing water wells that have the potential to be accessed with a geophysical
probe (gamma) without interrupting or damaging the water infrastructure services the wells provide. This work is
still progressing with the finalisation of specific wells located within areas of interest that can also be accessed
when considering all requirements to be met with freehold landowner engagements and any considerations of
water supply while conducting surveys.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 9: Orroroo Uranium Project
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidian basement.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Figure 10: Roger River Project
The Roger River Project comprises two granted exploration licenses, EL20/2020, and EL17/2021, which together
cover 74km2, located 410km northwest of the capital city of Hobart, Tasmania.
The Project is prospective for gold and copper as indicated by the intense silicification,
argillisation and diatreme breccias in close proximity to the Roger River Fault along with carbonate-rich host
rocks.
Work is continuing to evaluate best practice in meeting required expenditure commitments post recent tenure
rationalisation.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Financials
The cash flows relating to the June 2025 quarter included a total of $243k in exploration and evaluation spend
(items 1.2(a) and 2.1(d) in the Appendix 5B) on the Carmen Copper, Roger River and Orroroo projects and $133k in
staff, corporate and admin costs managing the corporate requirements of the Company. The Company also
loaned $609k to Transcendence to continue exploration works during the due diligence phase. There were no
substantive mining production and development activities during the Quarter.
The Company had a closing cash balance of $2.10 million, with a further US$145,742 in Chile held by NFL’s legal
representation as a receivable to be utilised for future Carmen Copper exploration expenditure as of June 30th
2025.
For the purposes of section 6 of the Appendix 5B, all payments made to related parties are for director and
consulting fees.
Tenement Status
The Company confirms that all of its tenements remain in good standing. The Company has not disposed of any
tenements during the quarter.
Tenement ID
Holder/Applicant
Interest (%)
EL20/2020
Roger River Resources Pty Ltd
100%
EL17/2021
Roger River Resources Pty Ltd
100%
EL6552
Black Lake Pty Ltd
100%
EL6814
Black Lake Pty Ltd
100%
EL6948
Black Lake Pty Ltd
100%
This announcement has been authorised by the directors of Norfolk Metals Ltd
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, highmargin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
The Roger River Project comprises two granted exploration licenses, EL20/2020, and EL17/2021, which together
cover 74km2, located 410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold
and copper as indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the
Roger River Fault along with carbonate-rich host rocks.
For further information, please visit www.norfolkmetals.com.au
Forward Looking Statements
This announcement includes “forward looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward looking statements can be identified by the use of forward looking terminology, including,
without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”,
“goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would”, “could” or “should” or, in each
case, their negative or other variations or comparable terminology. These forward looking statements include all
matters that are not historical facts. By their nature, forward looking statements involve known and unknown risks,
uncertainties and other factors because they relate to events and depend on circumstances that may or may not
occur in the future and may be beyond the Company’s ability to control or predict which may cause the actual
results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements. Forward looking statements are based on assumptions and are not
guarantees or predictions of future performance. No representation is made that any of these statements or
projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness
or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements
may be based are reasonable. Forward looking statements speak only as at the date of this release and the
Company and its affiliates, related bodies corporate (as that term is defined in the Corporations Act) and its
directors, employees, officers, representatives, agents, partners, consultants and advisers disclaim any
obligations or undertakings to release any update of, or revisions to, any forward-looking statements in this
announcement.
Disclaimers
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors, officers,
employees, agents or advisors, nor any other person accepts any liability, including, without limitation, any liability
arising out of fault or negligence for any loss arising from the use of information contained in this release. The
Company will not update or keep current the information contained in this release or to correct any inaccuracy or
omission which may become apparent, or to furnish any person with any further information. Any opinions express
in this release are subject to change without further notice.
Streamline Competent Person’s Statement
This report contains information extracted from previous ASX releases which are referenced in the report. The
Company is not aware of any new information or data that materially affects the information included in the original
market announcements.
The Company confirms that the form and content in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Compliance Statements (information required by ASX Listing Rule 5.13)
The Mineral Resource Estimate at the Carmen Copper Project is a foreign estimate prepared in accordance with
Canadian National Instrument 43-101 and is not reported in accordance with the JORC Code 2012. A competent
person has not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the
JORC Code 2012, and it is uncertain whether further evaluation and exploration will result in an estimate
reportable under the JORC Code 2012.
The Company initially announced the foreign estimate for the Carmen Copper Project on 31 March 2025 in
accordance with ASX Listing Rule 5.12. The Company confirms that the supporting information included in the
announcement of 31 March 2025 continues to apply and has not materially changed.
Norfolk confirms that it is not in possession of any new information or data relating to the foreign estimate that
materially impacts on the reliability of the estimates or the Norfolk’s ability to verify the foreign estimates as
mineral estimates in accordance with Appendix 5A (JORC Code).
Annexure A – NI 43-101 - Mineral Resources and Reserves
Oxide Zone
Resource
Classification
Measured
Tonnage
(kilotonnes)
-
Copper
grade (%)
Secondary Enrichment
Contained
Metal
-
Indicated
1,827.80
0.59
1078.40
Total
Measured and
1,827.80
0.59
1078.40
Indicated
Inferred
836.1
0.59
493.30
Total
2,663.90
0.59
1,571.70
Resources
Note: reported at a cut-off grade of 0.2% Cu, not capped
Tonnage Copper grade
(kilotonnes)
(%)
-
Total Resource (Oxide+Secondary)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
-
-
Contained
Metal
1,742.60
0.7
1219.82
3,570.40
0.64
2298.22
1,742.60
0.7
1219.82
3,570.40
0.64
2,298.22
1,191.90
0.49
584.03
2,028.00
0.53
1077.33
2,934.50
0.61
1803.85
5,598.40
0.60
3,375.55
Carmen NI 43-101 MRE
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd.
(IPBX) published 25 January 2027 (Carmen NI 43-101 MRE).
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in Table 1:
• the Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
• a competent person has not done sufficient work to classify the foreign estimate as a mineral resource in
accordance with the JORC Code; and
• it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be
able to be reported as mineral resources in accordance with the JORC Code.
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Fortuna (NI 43-101)
Gold
Category
Copper
Tonnes (Millions)
Gold grade
(g/t)
Contained Metal
(Mozs)
Copper grade
(%)
Contained Metal
(Mlbs)
Proved
321.81
0.56
5.82
0.55
3,876.59
Probable
277.24
0.35
3.10
0.43
2,626.36
Total Reserves
599.05
0.46
8.92
0.49
6502.95
Measured
19.79
0.53
0.34
0.51
223.33
Indicated
72.56
0.38
0.88
0.39
630.00
Inferred
678.07
0.30
6.45
0.35
5,190.00
Total Resources
770.42
0.31
7.67
0.36
6,043.33
Total Reserves +
Resources
1,369.47
0.38
16.59
0.42
12,546.28
Source: https://www.teck.com/news/news-releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
Relincho (NI 43-101)
Copper
Category
Molybdenum
Tonnes
(Millions)
Copper
grade (%)
Contained
Metal (Mlbs)
Molybdenum
grade (%)
Contained Metal (Mlbs)
Proved
435.30
0.38
3646.75
0.016
153.55
Probable
803.80
0.37
6556.70
0.018
318.97
Total Reserves
1,239.10
0.37
10,106.65
0.017
464.36
Measured
79.90
0.27
475.60
0.009
15.85
Indicated
317.10
0.34
2376.89
0.012
83.89
Inferred
610.80
0.38
5117.02
0.013
175.06
Total
Resources
1,007.80
0.36
7,969.51
0.012
274.80
Total Reserves
+ Resources
2,246.90
0.37
18,076.16
0.015
739.16
Source: https://www.teck.com/news/news-releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Candelaria (NI 43-101)
Source: https://lundinmining.com/news/lundin-mining-announces-2024-mineral-resource-and-123185/
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Mantos Blancos (NI 43-101)
Copper
Category
Tonnes
(Millions)
Copper grade
(%)
Silver
Contained
Metal (kt)
Silver grade (g/t)
Contained Metal
(kozs)
Proved
72.60
0.78
567
6.41
14968
Probable
50.00
0.57
288
4.57
7339
Total Reserves Sulphides
122.60
0.69
854
5.66
22,307
Proved
2.8
0.36
10
Probable
1.8
0.28
5
Total Reserves Oxide
4.6
0.33
15
Probable
6.7
0.18
12
Total Reserves Stockpile
6.7
0.18
12
Measured
104.4
0.75
783
6.03
20,234
Indicated
106.5
0.58
618
4.41
15,099
Inferred
20
0.48
96
3.35
2,151
230.90
0.65
1,497
5.05
37,484
Proved
Total Resources Sulphides
Measured
22.8
0.34
78
Indicated
28.5
0.26
74
Indicated
6.3
0.18
11
Indicated
3.9
0.19
7
Inferred
8.6
0.25
21
Inferred
2.3
0.19
6
Inferred
3.1
0.19
4
Inferred
4.4
0.17
7
Total Resources Oxides (Dump)
79.90
0.26
208
Total Reserves + Resources
444.70
0.58
2,586.00
5.26
59,791.00
Source: https://capstonecopper.com/wp-content/uploads/2023/01/MB-Technical-Report-Final-Jan-5-2022.pdf
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX ANNOUNCEMENT
Mantoverde Project (NI 43-101)
Category
Copper
Gold
Cobalt
Tonnes
(Millions)
Cu grade
(Tcu%)
Contained
Metal (kt)
Au grade
(g/t)
Contained
Metal (kozs)
Co grade
(ppm)
Contained
Metal (kt)
Proved
219
0.56
1231
0.10
702
Probable
179
0.40
723
0.09
521
Total Reserves
Sulphides
398
0.49
1,954
0.10
1,223
Measured
226.4
0.55
1,252
0.10
715
162
1
Indicated
368.3
0.41
1,501
0.10
1174
131
37
Inferred
570.9
0.37
2,098
0.08
1457
61
48
Total
Resources
Sulphides
1165.6
0.38
4,851
0.09
3,346
73
85
Proved
148.0
0.29
432
0.07
325
Probable
88.0
0.27
234
0.06
170
Total Reserves
Leach
236.0
0.28
665
0.21
495
Measured
255.7
0.32
587
Indicated
216.6
0.27
405
Inferred
71
0.24
116
Total
Resources
Leach
543.30
0.20
1,108
Total Reserves
+ Resources
2,342.90
0.37
8,578.00
SULPHIDES
OXIDES
Source: https://capstonecopper.com/wp-content/uploads/2024/11/Mantoverde-NI-43-101-Technical-Report-and-FeasibilityStudy_FINAL.pdf
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Norfolk Metals Limited
ABN
Quarter ended (“current quarter”)
38 652 438 385
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(236)
(445)
(b) development
-
-
(c) production
-
-
(d) staff costs
(8)
(177)
(125)
(404)
-
-
15
103
(a) exploration & evaluation #
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(354)
(923)
# - These are expenses paid for exploration on the Carmen Copper Project. It is expected that these
expenses will form part of the Earn In exploration expenditure as per the terms of the binding earn
in agreement.
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(7)
(173)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas e