ASX:NFL 30 April 2026
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 MARCH 2026
Norfolk Metals Limited (ASX:NFL) (Norfolk or the Company) is pleased to report on its activities during the 3-
month period ended 31 March 2026.
Highlights of Quarter Ending 31 March 2026
- Norfolk suspended from trading in relation to a proposed material acquisition in Chile and a proposed
re-compliance under Listing Rule 11.1 (See announcement 11th
March 2026)
- Maiden Drill Campaign Phase #1 RC completed at the Carmen Copper Project with all assays received
(See announcement 11th
December 2025 and 14th
January 2026)
HIGHER GRADE DRILLING INTERCEPTS:
o CCRC-25-030 - 53m (30.9m TW) @ 1.1% Cu from 62m; incl. 4m @ 1.3% Cu from 64m, and 13m
@ 1.9% Cu from 85m; and 13m @ 1.6% Cu from 100m
o CCRC-25-033 - 32m (19.9m TW) @ 1.3% Cu from 97m; incl. 9m @ 2.2% Cu from 99m, 4m @
1.8% Cu from 113m; 2m @ 1.9% Cu from 119m; and 3m @ 2.1% Cu from 125m
o CCRC-25-034 - 26m (21.9m TW) @ 0.8% Cu from 37m; incl. 6m @ 1.3% Cu from 39m; and 4m
@ 2.2% Cu from 52m
o CCRC-25-020 - 22m (19.2 TW) @ 0.5% Cu from 0m; incl. 6m @ 1.0% Cu from 12m
o CCRC-25-035 - 18m (15.6m TW) @ 0.5% Cu from 40m; incl. 5m @ 0.9% Cu from 52m
o CCRC-25-036 - 12m (10.3m TW) @ 0.8% Cu from 79m; incl. 3m @ 1.3% Cu from 79m
o CCRC-25-027 - 17m (13.7 TW) @ 0.9% Cu from 14m; incl. 3m @ 1.4% Cu from 16m and 5m @
1.5% Cu from 24m
#
True width(s) (TW) have been calculated using method as outlined in “Orientation of data in relation to geological structure” in
JORC Table 1 at rear of ASX release January 14th
2026
- Norfolk closed a successful capital raise of $2,100,000 via the Company’s capacity under ASX listing rules
7.1 and 7.1A (which includes $100,000 in director participation subject to shareholder approval) including
sophisticated resource investors who approached the Company as a cornerstone.
- Strong capital position at March 31 2026 of A$2.06M in cash
Suspension
Norfolk Metals Ltd (Norfolk or the Company) has been operating in Chile for the majority of 2025 and all of 2026,
having first been introduced to the Carmen Copper Project in late 2024. On 11 March 2026, the Company
announced its suspension from trading on the ASX in connection with a proposed material acquisition in Chile
and an associated proposed re-compliance with Listing Rule 11.1.
The Company is progressing all necessary Chilean regulatory approvals and ASX approvals required for the
proposed material acquisition, with a view to reaching a stage at which a comprehensive update can be provided
to the market. Norfolk currently anticipates releasing this update in May 2026, including an indicative timeline for
the proposed completion of the acquisition and the Company’s readmission to trading on the ASX.
2
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Phase #1 drilling complete at the Carmen Copper Project
Norfolk reported the assay results from the final six RC holes of the Maiden Drill Campaign, totalling 945m, which
completes Phase #1 of the 2025 Maiden Drill Campaign with 37 RC holes drilled, totalling 3,401m, with no
personal safety, process safety or environmental incidents incurred.
The Project hosts a foreign copper oxide mineral resource estimate of 5.6Mt at 0.6% Cu reported in
accordance with Canadian National Instrument 43-101 (Carmen NI 43-101 MRE) 1 ,2
(See Annexure A and 31st
March 2025 ASX release). The RC drilling Phase #1 concentrated on the Carmen Main target area with a focus on
targets along strike of the Carmen-Tabaco Thrust Fault (Carmen Tabaco Thrust or CT Thrust or CTTF) system
and confirmation of known mineralisation within the historical resource area, with some twinning of important
historical drill holes.
Figure 1: Carmen Cu Project Carmen Main Maiden Drill Campaign RC Phase #1
1
Independent Technical Report prepared by SRK Consulting Chile S.A. (SRK) for International PBX Ventures Ltd. (IPBX) published 25 January
2007 (Carmen NI 43-101 MRE).
2
This is a foreign estimate not reported in accordance with the JORC Code. The supporting information required by Listing Rule 5.12 was first
disclosed to ASX on 31 March 2025 and has not materially changed. The Carmen NI 43-101 mineral resource estimate is a foreign estimate and
is not reported in accordance with the JORC Code. A Competent Person has not yet undertaken work to classify the foreign estimate as a
Mineral Resource in accordance with the JORC Code. It is uncertain whether further evaluation will result in the estimate being able to be
3
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Maiden Drill Campaign Results
Phase #1 of the Maiden Drilling Campaign has been completed consisting of 37 RC holes drilled totalling 3,401m.
The results of the higher grade intersections from the drill program have been summarised below (Table 1). Refer
to Table 4 for further details of the results of Phase #1 drilling.
Table 1: Carmen Main Higher Grade Intercepts
Overall, the RC drilling results validated the historical Cu Oxide and Cu Sulphide intersections used in the Carmen
NI 43-101 MRE and confirmed the higher grades contained within the sulphide mineralisation. Drilling along the
downdip margins of the CT Thrust has confirmed the continuity of the Cu oxide ore data used in the historic
Carmen NI 43-101 MRE, and indicates mineralisation remains open at depth, outlining the potential to
identify resources in the sulphide section of the ore body.
The results of the last six holes of the RC drilling program have shown the following:
Carmen Main Results
1. Testing down dip extent of the mineralisation within the Copper Oxide Zone (COZ) and CT Thrust at depth.
Drill holes CCRC-25-035 and CCRC-25-036 successfully tested/confirmed (Table 2) the down dip extensions of
the COZ located within the western extent of the Carmen NI 43-101 MRE (Figure 1). The significant mineralisation
observed in both holes suggests that the western side (down dip) remains open and, with further drilling and
verification, could potentially add significant oxide/sulphide resources in addition to the Carmen NI 43-101 MRE
(Figure 2).
Table 2: Results comparison of twin CCRC/IPBX holes
Both holes were extended to test the CT Thrust which is believed to be the conduit or main feeder for the copper
mineralisation within the Carmen Main zone. Both holes intersected the CT Thrust targets but the zones did not
contain any anomalous copper mineralisation. This suggests that these fault structures and other secondary
NNW, N/S, and NNE striking faults are potentially part of a complex system, and that intersections between faults
structurally control the mineralisation that is propagating along the CT Thrust. The possible outcome is a shoot
direction plunging steeply along the line of intersection between the CT Thrust and other cross-cutting faults.
Section Line NFL Drill Hole Intersection IPBX Hole Intersection
10,150NE CCRC-25-035 19m @ 0.5% Cu TAB-08A 21.5m @0.4% Cu
10,350NE CCRC-25-036 12m @ 0.77% Cu TAB-067 12m @ 0.79% Cu
4
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 2: Carmen Main Section 10350mNE – Open at Depth
2. Deeper RC holes on section 10,000mNE (Figure 2) further confirmed Cu sulphide potential at depth and
northern oxide extension
Drill hole CCRC-25-033 was drilled vertically as partial infill and to confirm the mineralisation between holes TAB
01A (Historical Drill Hole) and CCRC-25-030 (Maiden Drill Campaign RC hole). The hole intersected strong
mineralisation, and the assays confirmed the high grade Cu sulphide mineralisation observed from the immediate
surrounding holes (Figure 3).
Significant intercepts of Cu Oxide and Cu Sulphide mineralisation were observed starting from 32m depth and
below. The deeper RC drilling on the 10,000mNE section confirmed the potential of the Cu sulphide mineralisation
that remains open at depth and will be a prime target for the Phase #2 diamond drilling program.
Drill hole CCRC-25-034 was drilled approximately 50m to the north of hole CCRC-25-033 (Figure 4). The drill hole
intersected the Cu oxide/sulphide transition zone within the meta-sediments from 79m and is open at depth. The
metasediment and andesite contact was intersected at 102m (CTTF). The hole was then extended past 200m to
test the Tabaco Fault, but no further copper mineralisation was intersected. The drilling suggests that the
mineralisation is open to the west and that there may be a shoot controlling the mineralisation that is plunging
steeply in the NNW direction. This will be tested during the next phase of Diamond Drilling.
5
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 3: Carmen Main Section 10,000mNE
Figure 4: Carmen Main Section 10,050mNE – open at depth
6
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
$2.1m Capital Raise Completed
The Company completed a capital raise with support from sophisticated resource investors as cornerstones,
existing shareholders and directors to raise $2,100,000 (before costs) through a placement of up to a total of
21,000,000 fully paid ordinary shares at an issue price of $0.10 each (Placement Shares), together with one free
attaching unquoted option for every Placement Share subscribed for (Placement Options) (the Placement)
(director commitments subject to shareholder approval). The Placement Shares will represent approximately 25%
of the Company’s existing shares on issue.
The issue price represented a 4.76% discount to the last traded price of $0.105 on 13 January 2026 and a 3.85%
discount to the 15-day volume-weighted average price (VWAP) of $0.104.
The Placement Shares (excluding the Director Placement Shares referred to below) were issued under the
Company’s available placement capacity under Listing Rule 7.1 (11,919,886 Shares) and Listing Rule 7.1A
(8,080,114 Shares). The Placement Options will have an exercise price of $0.15 each and will expire 3 years from
the date of issue (subject to shareholder approval).
The Board has committed to subscribe for 1,000,000 Placement Shares ($100,000) (Director Placement Shares)
and 1,000,000 free attaching Options on the same terms as other participants in the Placement (together, the
Director Placement Securities). This amount forms part of the total $2,100,000 (before costs) to be raised under
the Placement.
Carmen Copper Project Updates
Further to the Carmen Copper Project update released on 23 February 2026, the Company confirms that it has
formally lodged a Declaración de Impacto Ambiental (DIA) for the project in Chile. The DIA represents a key
regulatory milestone within the Chilean Environmental Impact Assessment System and is required to secure
environmental approval for the proposed project activities. Since submission, the application has progressed
through the initial phases of review by the relevant Chilean authorities, including standard completeness and
technical assessments of the documentation.
Following this review, the Company received feedback identifying a number of matters requiring clarification,
supplementation and/or rectification. These items are typical of the early-stage DIA process and primarily relate
to requests for additional technical detail and supporting information for environmental baseline studies and
project descriptions; clarification of certain assumptions, methodologies and data inputs used in the assessment;
further information regarding potential environmental impacts and proposed mitigation measures; and
administrative and formatting matters to ensure consistency with applicable requirements.
The Company is presently working through a structured response process, coordinating with local technical
consultants and advisors in Chile to prepare the required supplementary information and responses within
prescribed timeframes. Requests of this nature are a normal feature of the DIA evaluation process and do not, in
themselves, indicate any adverse determination, but rather reflect the iterative nature of the Chilean
environmental approvals regime, under which applications are progressively refined through regulator feedback.
The Company will continue to keep shareholders informed of any material developments as the approval process
advances.
During 2026, the Company has advanced multiple parallel workstreams at the Carmen Copper Project focused
on refining drill targeting and de-risking future programs. Field mapping, sampling and structural interpretation
have been completed across the Carmen Main area and along strike, including the Higueritas Belt, to improve
understanding of controls on high-grade copper mineralisation and to inform Phase 2 drilling priorities. In parallel,
approximately 1,000 metres of historically mineralised diamond core has been re-assayed to validate and
enhance confidence in historical datasets, and these outcomes will underpin the planned Phase 2 diamond
drilling campaign, which is being refined in line with ongoing geological interpretation, assay results and regional
IP geophysical targets.
7
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
In addition, preliminary water supply investigations are nearing completion, supported by an independent study
assessing both on-site and third-party sourcing options, to support the project’s longer-term development
ambitions.
Existing project developments in the reporting period
Both the Orroroo Uranium Project and the Roger River Project remain as assets of the Company since Norfolk’s
listing in March 2022.
Norfolk has previously announced the intention to consider further geophysics for target generation at the Orroroo
Uranium Project (Figure 6). The Company continues to work with Orroroo stakeholders via the Company’s local
correspondent and the Department of Energy and Mining in South Australia to evaluate tenement tenure
obligations and the exploration potential of the project.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2, located approximately 274km northwest of the capital city of Adelaide, South Australia,
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidian basement.
Figure 6: Orroroo Uranium Project
The Roger River Project comprises the granted exploration license EL20/2020, which covers 26km2
, located 410km
northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold and copper as indicated by
the intense silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault along with
carbonate-rich host rocks.
Revised expenditure commitments were previously established for Tasmanian permits EL20/2020, and proposals
were prepared for future drilling upon receipt of all required approvals. Planning for future drill testing of priority
8
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
continued with the resubmission of a previously approved drilling plan to Mineral Resources Tasmania (MRT) in
December 2025 with approval progressing with MRT and stakeholders of the region.
Figure 5: Roger River Project
Financials
The cash flows relating to the March 2026 quarter included a total of $655k in exploration and evaluation spend on
the Carmen Copper, Roger River and Orroroo projects, $1,071k on option payments split between: $710k
(US$500k) which is the payment of a non-refundable option payment to secure the proposed material acquisition
in Chile, and $361k (US$250k) option payment to the vendors of the Carmen Copper Project as part of the binding
offer to acquire the Carmen Copper Project (refer to ASX announcement 31 March 2025), and $238k in staff,
corporate and admin costs managing the corporate requirements of the Company. No expenditure was incurred
for mining production or development activities during the quarter.
The Company had a closing cash balance of $2.06 million.
Payments of approximately $112,000 were made to related parties of the Company, as shown in the attached
Appendix 5B. These payments relate to current fees and consulting fees paid to directors.
9
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Tenement Status
The Company confirms that all of its tenements remain in good standing.
Tenement ID Holder/Applicant Interest at start
of quarter (%)
Interest at end
of quarter (%)
EL20/2020 Roger River Resources Pty Ltd 100% 100%
EL6552 Black Lake Pty Ltd 100% 100%
EL6814 Black Lake Pty Ltd 100% 100%
EL6948 Black Lake Pty Ltd 100% 100%
END
This announcement has been authorised for release to the ASX by the Board of Directors of
Norfolk Metals Ltd
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2
. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is currently
developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst the CCP
currently presents as a copper oxide project with highly soluble copper oxide mineralisation from surface; it also
hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant further investigation
and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project as a low-cost, high-
margin, value-accretive copper heap leaching operation producing copper cathode at the mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2
, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
The Roger River Project is comprised of one granted exploration license EL20/2020 which covers 26km2
, located
410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold and copper as
indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault
along with carbonate-rich host rocks.
For further information, please visit www.norfolkmetals.com.au
Forward Looking Statements
This announcement includes “forward looking statements” within the meaning of securities laws of applicable
jurisdictions. Forward looking statements can be identified by the use of forward looking terminology, including,
without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”,
“goals”,“targets”,“aims”,“outlook”,“guidance”,“forecasts”,“may”,“will”,“would”,“could”or“should”or, in each
case, their negative or other variations or comparable terminology. These forward looking statements include all
matters that are not historical facts. By their nature, forward looking statements involve known and unknown risks,
uncertainties and other factors because they relate to events and depend on circumstances that may or may not
occur in the future and may be beyond the Company’s ability to control or predict which may cause the actual
results or performance of the Company to be materially different from the results or performance expressed or
implied by such forward-looking statements. Forward looking statements are based on assumptions and are not
guarantees or predictions of future performance. No representation is made that any of these statements or
projections will come to pass or that any forecast result will be achieved, nor as to their accuracy, completeness
10
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
or correctness. Similarly, no representation is given that the assumptions upon which forward looking statements
may be based are reasonable. Forward looking statements speak only as at the date of this release and the
Company and its affiliates, related bodies corporate (as that term is defined in the Corporations Act) and its
directors, employees, officers, representatives, agents, partners, consultants and advisers disclaim any
obligations or undertakings to release any update of, or revisions to, any forward-looking statements in this
announcement.
Disclaimers
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release. The Company will not update or keep current the information contained in this release or to correct any
inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any
opinions express in this release are subject to change without further notice.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this release. To the maximum extent
permitted by law, none of the Company, its related bodies corporate, shareholders or respective directors,
officers, employees, agents or advisors, nor any other person accepts any liability, including, without limitation,
any liability arising out of fault or negligence for any loss arising from the use of information contained in this
release.
This release does not constitute an invitation, offer or recommendation to apply for or purchase securities and
does not contain any application form for securities. This release does not constitute an advertisement for an
offer or proposed offer of securities. Neither this release nor anything contained in it shall form the basis of any
contract or commitment, and it is not intended to induce or solicit any person to engage in, or refrain from engaging
in, any transaction.
Streamline Competent Person’s Statement
This report contains information extracted from previous ASX releases, which are referenced in the report. The
Company is not aware of any new information or data that materially affects the information included in the
original market announcements.
The Company confirms that the form and content in which the Competent Person’s findings are presented have
not been materially modified from the original market announcements.
The information in this announcement that relates to previously reported exploration results is extracted from the
Company’s ASX announcements dated 31 March 2025, 12 May 2025, 30 October 2025, 11 December 2025, 14
January 2026 and 23 February 2026 (Original Announcements). The Company confirms that it is not aware of any
new information or data that materially affects the information contained in the Original Announcements.
11
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Annexure A – NI 43-101 - Mineral Resources and Reserves
Compliance Statements (information required by ASX Listing Rule 5.13)
The Mineral Resource Estimate at the Carmen Copper Project is a foreign estimate prepared in accordance with
Canadian National Instrument 43-101 and is not reported in accordance with the JORC Code 2012. A competent
person has not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the
JORC Code 2012, and it is uncertain whether further evaluation and exploration will result in an estimate
reportable under the JORC Code 2012.
The Company initially announced the foreign estimate for the Carmen Copper Project on 31 March 2025 in
accordance with ASX Listing Rule 5.12. The Company confirms that the supporting information included in the
announcement of 31 March 2025 continues to apply and has not materially changed. The information in this
section relates solely to the foreign estimate previously disclosed under ASX Listing Rule 5.12 and does not
constitute new exploration results.
Norfolk confirms that it is not in possession of any new information or data relating to the foreign estimate that
materially impacts the reliability of the estimates or Norfolk’s ability to verify the foreign estimates as mineral
estimates in accordance with Appendix 5A (JORC Code).
It is the Company’s intention to validate the results of the foreign estimate through re-logging of historical drill
holes and completion of the proposed maiden drilling program. The results of the maiden drill program (including
twinning of historical holes) will determine the next phase of drilling to facilitate the course towards the Company’s
aim to construct a 2012 JORC Resource estimate. In addition, it is also the intent of the Company to use the rejects
(remaining samples not sent for analysis) from the RC drilling to conduct additional metallurgical studies to
confirm the leaching results of the previous study and possibly determine a more suitable/economic leaching
strategy.
Table: Carmen NI 43-101 MRE
Cautionary Statement - Carmen NI 43-101 MRE
In accordance with ASX Listing Rule 5.12.9, the Company provides the following cautionary statement regarding
the Carmen NI 43-101 MRE shown in the Table:
• The Carmen NI 43-101 MRE is a foreign estimate and is not reported in accordance with the JORC Code;
• A competent person has not done sufficient work to classify the foreign estimate as a mineral resources in
accordance with the JORC Code; and
• It is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able
to be reported as mineral resources in accordance with the JORC Code.
Within the Carmen Tabaco Belt, the Carmen NI 43-101 MRE has been defined over 600m of strike, to a depth of
30m in the Carmen Oxide Zone (COZ). The Carmen NI 43-101 MRE excludes historic higher-grade drilling and
Tonnage
(kilotonnes)
Copper
grade (%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Tonnage
(kilotonnes)
Copper grade
(%)
Contained
Metal
Measured - - - - - -
Indicated 1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2298.22
Total
Measured and
Indicated
1,827.80 0.59 1078.40 1,742.60 0.7 1219.82 3,570.40 0.64 2,298.22
Inferred 836.1 0.59 493.30 1,191.90 0.49 584.03 2,028.00 0.53 1077.33
Total
Resources
2,663.90 0.59 1,571.70 2,934.50 0.61 1803.85 5,598.40 0.60 3,375.55
Resource
Classification
Note: reported at a cut-off grade of 0.2% Cu, not capped
Oxide Zone Secondary Enrichment Total Resource (Oxide+Secondary)
12
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
covers no more than 20% of the COZ. The COZ presents as potentially continuous between drill holes and sections
along structural and lithology-controlled zones, which are mainly sub-parallel to the Tabaco Thrust.
Fortuna (NI 43-101)
Category
Gold Copper
Tonnes (Millions)
Gold grade
(g/t)
Contained Metal
(Mozs)
Copper grade
(%)
Contained Metal
(Mlbs)
Proved 321.81 0.56 5.82 0.55 3876.59
Probable 277.24 0.35 3.10 0.43 2626.36
Total Reserves 599.05 0.46 8.92 0.49 6502.95
Measured 19.79 0.53 0.34 0.51 223.33
Indicated 72.56 0.38 0.88 0.39 630.00
Inferred 678.07 0.30 6.45 0.35 5,190.00
Total Resources 770.42 0.31 7.67 0.36 6,043.33
Total Reserves +
Resources
1,369.47 0.38 16.59 0.42 12,546.28
Source: https://www.teck.com/news/news-releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
Relincho (NI 43-101)
Category
Copper Molybdenum
Tonnes
(Millions)
Copper
grade (%)
Contained
Metal (Mlbs)
Molybdenum
grade (%)
Contained Metal (Mlbs)
Proved 435.30 0.38 3646.75 0.016 153.55
Probable 803.80 0.37 6556.70 0.018 318.97
Total Reserves 1,239.10 0.37 10,106.65 0.017 464.36
Measured 79.90 0.27 475.60 0.009 15.85
Indicated 317.10 0.34 2376.89 0.012 83.89
Inferred 610.80 0.38 5117.02 0.013 175.06
Total
Resources
1,007.80 0.36 7,969.51 0.012 274.80
Total Reserves
+ Resources
2,246.90 0.37 18,076.16 0.015 739.16
Source: https://www.teck.com/news/news-releases/2015/goldcorp-and-teck-combine-el-morro-and-relincho-projects-in-chile
13
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
Candelaria (NI 43-101)
Source: https://lundinmining.com/news/lundin-mining-announces-2024-mineral-resource-and-123185/
Mantos Blancos (NI 43-101)
Category
Copper Silver
Tonnes
(Millions)
Copper grade
(%)
Contained
Metal (kt)
Silver grade (g/t)
Contained Metal
(kozs)
Proved 72.60 0.78 567 6.41 14968
Probable 50.00 0.57 288 4.57 7339
Total Reserves Sulphides 122.60 0.69 854 5.66 22,307
Proved 2.8 0.36 10
Probable 1.8 0.28 5
Total Reserves Oxide 4.6 0.33 15