Roger River Project (Tasmania) soil study complete with
successful reanalysis of historical samples
•
Norfolk awarded permit EL6948 expanding both Orroroo
and Johnburgh Projects (South Australia) further west
•
Norfolk commences review of complimentary projects to
the South Australian uranium project suite, amongst other
projects elsewhere
•
Strong cash position at A$3.49m December 2023 quarter
Leo Pilapil
Technical Director
Patrick Holywell
Non-Executive Director
Arron Canicais
Company Secretary
Contact Details
Suite 10, 85-87 Forrest Street
Cottesloe WA 6011
Phone: +61 8 6255 8625
norfolkmetals.com.au
Figure 1: Soil study showing new and historical sample locations
Norfolk Metals Limited I ABN: 38 652 438 385
1
www.norfolkmetals.com.au
ASX:NFL
Roger River (Tasmania) Update
Norfolk Metals Ltd (Norfolk or the Company) initiated a soil program at the Roger River
Project (Tasmania) to obtain a better understanding of the copper and gold mineralisation
to guide the next exploration phase and potential drilling. The program focus was to provide
a lateral vector or a possible surface trend or strike to the native copper (Cu) mineralization
intersected in hole 22RRD-001 at Anomaly 2 (A2). The soil program consisted of new surface
samples and the re-analyses of selected historical samples (not previously sampled for Cu)
being submitted for Cu (multi-elements) analysis.
Figure 2: Roger River Project Location
New surface samples were collected on a 200 x 100m grid around A2 with a total of 98
samples collected covering an area of approximately 1.2km x 1.5km over the interpreted
splay from the Roger River Fault. The results revealed a maximum of 11 ppb for gold (Au), 221
ppm for copper (Cu) and 35 ppm for arsenic (As). Gridding and plotting of both gold and
arsenic results revealed linear anomalies that are coincident with the interpreted main
structures (splays) considered as potential conduits for the mineralizing fluids in the Roger
River epithermal system (Figure 1).
Norfolk Metals Limited I ABN: 38 652 438 385
2
www.norfolkmetals.com.au
ASX:NFL
Figure 3: Cu soil contour with the interpreted splays
The re-analysis program involved selecting preferred historical soil samples for the entire
EL20/2020 tenement. The samples were attained from the Mineral Resources Tasmania (MRT)
storage Facility in Hobart. The sample locations were selectively chosen over the Roger River
Fault (RRF) and along possible interpreted splays off the RRF. The samples were re-analysed
for Cu and other multi-elements. In all, the Company submitted 148 pulp soil samples for
multi-element analyses to ALS in Burnie, Tasmania. The results show a continuous Cu anomaly
around A4 and A5 prospects located along the interpreted fault splay from the RRF (Figure
3).
Norfolk Metals Limited I ABN: 38 652 438 385
3
www.norfolkmetals.com.au
ASX:NFL
This anomaly trend has coincident lead (Pb), zinc (Zn) and molybdenum (Mo) anomalies.
The RRF also shows a strong continuous As anomaly over the 4km strike length (Figure 4).
Gold mineralisation is mainly associated with iron and arsenic minerals such as pyrite and
arsenopyrite. During the oxidation process the arsenic is the more mobile element, moves
further away from the source and therefore becomes a useful geochemical pathfinder for
gold mineralisation
Figure 4: As soil contour with continuous anomaly over the RRF structure
South Australian Uranium Projects Update
The maiden drill program assisted in supporting the east west creeks as targets for uranium
mineralised paleochannels. The Company has prepared a magnetic ground survey plan
along with passive seismic lines to assist in optimising the targeting of subsequent drilling at
the Orroroo Project and future drilling of the Johnburgh and Black Rock projects.
Norfolk Metals Limited I ABN: 38 652 438 385
4
www.norfolkmetals.com.au
ASX:NFL
Having previously completed an efficient and cost-effective drill program, well supported
by stakeholders in region, the Company is confident in the processes required for the next
phases of exploration. The concept of geophysics prior to drilling should not affect the ability
for the Norfolk team to engage with landowners for the purpose of drilling or with the
Department of Energy and Mining in the required permitting process for drilling. As stated in
previous announcements, the Company expects to present a comprehensive report on
results and prospectivity, along with future plans, later in March 2024.
Norfolk also wishes to confirm that it has recently been granted EL6948 which adds a further
~10% to the Company’s landholding in South Australia to now 723km2 (Figure 4)
Figure 5: EL6948 expanding footprint of both Johnburgh and Orroroo Projects
Complimentary projects
Norfolk continues to review projects for acquisition as presented to the Company including
complimentary projects to the South Australian uranium project suite. As the Company was
listed as a uranium and gold explorer the majority of projects presented are aligned to the
assets Norfolk held at listing. It is the boards opinion the Company is extremely well structured
while approaching 24 months since IPO listing in March 2022 currently with 38,144,289 fully
paid shares on issue and A$3.49m cash reported in the December 2023 quarterly.
END
This announcement has been authorised by the board of directors of Norfolk.
Norfolk Metals Limited I ABN: 38 652 438 385
5
www.norfolkmetals.com.au
ASX:NFL
Competent Persons Statement
The information in this announcement that relates to exploration results, is based on, and
fairly represents, information and supporting documentation prepared by Mr Leo Pilapil, a
competent person who is a member of the Australasian Institute of Mining and Metallurgy.
Mr Pilapil has a minimum of five years’ experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a competent person as defined in the 2012 Edition of the Joint Ore
Reserves Committee Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Pilapil is a related party of the Company, being the
Technical Director, and holds securities in the Company. Mr Pilapil has consented to the
inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
About Norfolk Metals
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814
and EL6948, which together cover 723km2, located approximately 274km northwest of the
capital city of Adelaide, South Australia within the Walloway Basin, which is an elongate
Tertiary Basin approximately 50km long and up to 15km wide. It consists of Tertiary and
Quaternary sediments unconformably underlain by Adelaidian basement.
The Roger River Project comprises two granted exploration licenses, EL20/2020, and
EL17/2021, which together cover 261km2, located 410km northwest of the capital city of
Hobart, Tasmania. The Project is prospective for gold and copper as indicated by the intense
silicification, argillisation and diatreme breccias in close proximity to the Roger River Fault
along with carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au.
Norfolk Metals Limited I ABN: 38 652 438 385
6
www.norfolkmetals.com.au
ASX:NFL
JORC Code, 2012 Edition – Table 1 Report Template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code Explanation
Sampling
techniques
● Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
● Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or
systems used.
● Aspects of the determination of mineralisation that are Material to
the Public Report.
● In cases where ‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases, more explanation may be
required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information.
●
C Horizon soil samples taken at approximately 50cm
depth using a bucket type hand auger. Holes were
collared with a large diameter hand auger to reduce
surface contamination and a smaller diameter bucket
auger was used to remove sample from the C horizon
for data consistency. Historical soils along the Roger
River fault were collected from C horizon using a similar
technique and are directly comparable.
●
98 orientation C-horizon soil samples were collected at
over the target areas.
●
148 historical pulp samples were selected and attained
from Mineral Resources Tasmania storage facility and
submitted to ALS Burnie for reanalysis.
Drilling
techniques
● Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).
Not Applicable
Drill sample
recovery
● Method of recording and assessing core and chip sample recoveries
and results assessed.
● Measures taken to maximise sample recovery and ensure
●
Norfolk Metals Limited I ABN: 38 652 438 385
Commentary
Sample recovery of C-horizon soils is approximately 500g
weight of sample.
www.norfolkmetals.com.au
7
ASX:NFL
Criteria
JORC Code Explanation
Commentary
representative nature of the samples.
● Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
● Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
● Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
● The total length and percentage of the relevant intersections
logged.
●
All soils were logged by colour, clay, rock chip and
mineral content if identifiable.
Subsampling
techniques
and sample
preparation
● If core, whether cut or sawn and whether quarter, half or all core
taken.
● If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
● For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
● Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
● Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
● Whether sample sizes are appropriate to the grain size of the
material being sampled.
●
No sub-sampling was taken except for field duplicates
(collected for 1 in every 10 samples) where the sample
was split into two halves of >250g.
Sample preparation was undertaken at the commercial
laboratory by drying and pulverization.
●
For the sample reanalysis, pulps used were originally
prepared by the same ALS laboratory Burnie.
● The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
● For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and
their derivation, etc.
●
Assay of the C Horizon samples was conducted at an
independent commercial laboratory with appropriate
blanks and standards. Analyses requested include gold
by 50g Fire Assay with AA Finish for 1ppb lower
detection limit and multi element assay ME-ICP41 by
aqua regia digest with ICP-MS finish.
The duplicate samples assayed performed well with
Quality of
assay data
and
laboratory
tests
Norfolk Metals Limited I ABN: 38 652 438 385
●
●
www.norfolkmetals.com.au
8
ASX:NFL
Criteria
JORC Code Explanation
● Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision have been
established.
Commentary
●
●
assay of the field duplicates producing appropriately
accurate duplicate results.
Date entry was conducted daily into a sampling
spreadsheet and sample numbers verified against lab
results on receipt of assay, no missing samples were
identified and all samples were suitable weight for
assay.
No adjustment has been made to any of the assay
results
Soil assay data and sampling data is now stored in the
Norfolk Metals database
Verification
of sampling
and
assaying
● The verification of significant intersections by either independent or
alternative company personnel.
● The use of twinned holes.
● Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
● Discuss any adjustment to assay data.
●
●
Alternate company personnel being the project
geologist and field geologist have reviewed the data,
there has been no adjustment to the primary data from
the laboratory
Location of
data points
● Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
● Specification of the grid system used.
● Quality and adequacy of topographic control.
●
Locations for the survey data were collected by hand
held GPS in Map Grid of Australia 1994 (Zone 55) format
using GDA94 datum.
Any samples with estimation position errors greater than
8m were verified by topolite hip chain from the previous
location. Typical position error is +-5m
Data
spacing and
distribution
● Data spacing for reporting of Exploration Results.
● Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
● Whether sample compositing has been applied.
●
Data points were collected every 100m along 200m E-W
lines across magnetic and gravity anomalies
●
No assessment of grade continuity is being described.
Lines are for orientation only; anomalism is being used to
identify prospectivity in terms of the halo of
mineralisation to the geophysical and existing
geochemical anomalies.
Orientation
of data in
relation to
● Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
●
The grid of 100m x 200m was designed to cover the
magnetic and gravity anomalies situated along
Norfolk Metals Limited I ABN: 38 652 438 385
●
www.norfolkmetals.com.au
9
ASX:NFL
Criteria
JORC Code Explanation
geological
structure
● If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Sample
security
● The measures taken to ensure sample security.
Audits or
reviews
● The results of any audits or reviews of sampling techniques and data.
Commentary
interpreted fault structures.
●
The E-W orientation is considered To have minimal
sampling bias to the interpreted NNE fault structures.
●
Samples were collected in Calico bags and labelled
with company sample numbers
●
Polyweave bags of these samples were hand delivered
to the lab at the end of the sampling program
●
Data is managed by Norfolk Metals employees and the
sampling technique was reviewed by a consulting
geologist and a company director. An external review
of the data has been made by the consulting geologist
to determine the effectiveness of field duplicate results
which performed adequately for the type of orientation
sampling described
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral
tenement and
land tenure
status
● Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
● The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
●
Exploration
done by other
parties
● Acknowledgment and appraisal of exploration by other parties.
●
Norfolk Metals Limited I ABN: 38 652 438 385
●
The Roger River project is located on exploration license
EL20/2020 and EL17/2021which are held 100% by Norfolk
Continual engagement with Mineral Resources
Tasmania and stake holders is required and overseen by
Norfolk contract geologist.
Induced polarisation geophysical survey, surface
sampling and limited drilling undertaken by previous
explorers
www.norfolkmetals.com.au
10
ASX:NFL
Criteria
JORC Code Explanation
Commentary
Geology
● Deposit type, geological setting and style of mineralisation.
●
The rocks hosting the silicification comprise well bedded
and banded dolomites, calcareous and dolomitic
siltstones, grits, black shales and some chertson to the
east or the hanging wall side of the Roger River fault,
capped on topographic highs in places by basalt. The
west or footwall side of the Roger River fault contains
dolomites, dolomitic-siltstones and other carbonate-rich
rocks
Drill hole
Information
● A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
● If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should
clearly explain why this is the case.
●
No drill hole information reported.
Data
aggregation
methods
● In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be
stated.
● Where aggregate intercepts incorporate short lengths of highgrade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
● The assumptions used for any reporting of metal equivalent values
should be clearly stated.
●
No data aggregation or equivalent values have been
used – all significant copper and gold results are
presented on an elemental basis
Norfolk Metals Limited I ABN: 38 652 438 385
www.norfolkmetals.com.au
11
ASX:NFL
Criteria
JORC Code Explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
● These relationships are particularly important in the reporting of
Exploration Results.
● If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
● If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
●
No drilling intercepts reported
Diagrams
● Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
●
No significant intercepts reported.
Balanced
reporting
● Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practised to avoid misleading reporting
of Exploration Results.
●
The accompanying document is a balanced report with
a suitable cautionary note..
Other
substantive
exploration
data
● Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
●
All meaningful information has been provided.
Further work
● The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
● Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
●
Results from this soil program will guide further