Results of Annual General Meeting
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Unit 10, 85-87 Forrest Street
Cottesloe WA 6011
ABN: 38 652 438 385
Phone: +61 8 6255 8625
norfolkmetals.com.au
ASX:NFL 27th
November 2025
Results of Annual General Meeting
Norfolk Metals Limited (ASX: NFL) (the “Company” or “Norfolk”) advise the results of the Annual General Meeting
("AGM") held today. All resolutions were passed by a poll.
The Company notes that Resolution 4 was passed as a special resolution.
Details of each resolution and proxy votes are attached in accordance with the requirements of ASX Listing Rule
3.13.2 and section 251AA of the Corporations Act 2001.
This announcement has been authorised by the directors of Norfolk Metals Ltd
About Norfolk Metals
The Carmen Copper Project (CCP) is located in the Huasco Province, Atacama Region in Chile. The Project
encompasses twenty-two contiguous exploration and exploitation licenses totalling 46.6km2
. There are multiple
mineralised targets over an extensive strike length with intensive copper mineralisation from surface. Only 16km
to the northeast of the CCP is the Nueva Unión joint venture between Teck and Newmont. Nueva Unión is
currently developing the multi-billion-dollar Relincho and Fortuna (previously called El Morro) deposits. Whilst
the CCP currently presents as a copper oxide project with highly soluble copper oxide mineralisation from
surface; it also hosts significant sulphide potential as demonstrated in historical drill intercepts that warrant
further investigation and follow-up drilling programs. Norfolk is aiming to establish the Carmen Copper Project
as a low-cost, high-margin, value-accretive copper heap leaching operation producing copper cathode at the
mine gate.
The Orroroo Uranium Project comprises three granted exploration licenses, EL6552, EL6814 and EL6948, which
together cover 723km2
, located approximately 274km northwest of the capital city of Adelaide, South Australia
within the Walloway Basin, which is an elongate Tertiary Basin approximately 50km long and up to 15km wide. It
consists of Tertiary and Quaternary sediments unconformably underlain by Adelaidean basement.
The Roger River Project is comprised of one granted exploration license EL20/2020 which covers 26km2
, located
410km northwest of the capital city of Hobart, Tasmania. The Project is prospective for gold and copper as
indicated by the intense silicification, argillisation and diatreme breccias in close proximity to the Roger River
Fault along with carbonate-rich host rocks.
For further information please visit www.norfolkmetals.com.au
Disclosure of Proxy Votes
Norfolk Metals Limited
Annual General Meeting
Thursday, 27 November 2025
In accordance with section 251AA of the Corporations Act 2001, the following information is provided in relation to resolutions put to members at the meeting.
Automic
GPO Box 5193, Sydney, NSW 2001
P 1300 288 664 (aus) or +61 (0)2 9698 5414 (world)
F +61 (0)2 8583 3040 E hello@automic.com.au
ABN 27 152 260 814
Proxy Votes
Poll Results (if
applicable)
Results
Resolution
Decided by
Show of
Hands (S) or
Poll (P)
Total Number of
Proxy Votes
exercisable by
proxies validly
appointed
FOR AGAINST ABSTAIN
PROXY'S
DISCRETION
FOR AGAINST ABSTAIN OUTCOME
1 Remuneration Report P 18,351,010
18,305,583
99.75%
40,000
0.22%
20,000
5,427
0.03%
19,286,010
99.79%
40,000
0.21%
220,000 -
2 Re-election of Director – Mr Leonardo Pilapil P 18,351,010
18,345,583
99.97%
0
0.00%
20,000
5,427
0.03%
22,001,009
100.00%
0
0.00%
20,000 Carried
3 Re-election of Director – Mr David Fowler P 18,351,010
18,345,583
99.97%
0
0.00%
20,000
5,427
0.03%
22,001,009
100.00%
0
0.00%
20,000 Carried
4 Approval of the Additional 10% Placement Capacity P 18,351,010
18,305,583
99.75%
40,000
0.22%
20,000
5,427
0.03%
21,961,009
99.82%
40,000
0.18%
20,000 Carried
5 Approval to issue Shares to Related Party –
Transcendence
P 17,998,010
17,952,583
99.75%
40,000
0.22%
373,000
5,427
0.03%
21,608,009
99.82%
40,000
0.18%
373,000 Carried
Share your feedback
Discover